ENS 45039
ENS Event | |
---|---|
07:10 May 3, 2009 | |
Title | 24-Hour Nrc Bulletin 80-24 Report Due to Possible Service Water System Leakage Into Containment |
Event Description | V.C. Summer Nuclear Station is notifying the NRC in accordance with NRC Bulletin 80-24, regarding Service Water System leakage into containment.
At approximately 0310 on 05/03/09, Reactor Building sump sample analyses, in response to increasing sump level, indicated a probable leak from the Industrial Cooling Water System at 0.38 gpm. In accordance with Bulletin 80-24, a 14 day written report will be submitted. The licensee is continuing to monitor at this time. A corrective action plan to definitively identify where the leak is coming from will be developed. The licensee notified the NRC Resident Inspector. The licensee plans on notifying State of South Carolina and the counties of Fairfield, Richland, Lexington, and Newberry EP representatives.
On 05/06/2009, a reactor building entry was made, and the previously reported leak was determined to be from the Industrial Cooling Water system. The location of the leak was from a mechanical seal of a non-safety rod position indication equipment cabinet cooling pump. No degradation of a containment boundary exists. EN 45039 is being retracted, and a 14 day report will not be submitted. The licensee notified the NRC Resident Inspector. Notified the R2DO (Guthrie). |
Where | |
---|---|
Summer South Carolina (NRC Region 2) | |
Reporting | |
Response | |
Time - Person (Reporting Time:+11.32 h0.472 days <br />0.0674 weeks <br />0.0155 months <br />) | |
Opened: | Arnie Crib 18:29 May 3, 2009 |
NRC Officer: | Donald Norwood |
Last Updated: | May 7, 2009 |
45039 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45039\u003C/a\u003E - \u003Ca href=\"/Summer\" title=\"Summer\"\u003ESummer\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E24-Hour Nrc Bulletin 80-24 Report Due to Possible Service Water System Leakage Into Containment\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45039 - Summer\n","link":"","lat":34.29653611111111,"lon":-81.31628333333333,"icon":"/w/images/6/6b/South_Carolina_Electric_%26_Gas_Company_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 450392009-05-03T07:10:0003 May 2009 07:10:00
[Table view]Response 24-Hour Nrc Bulletin 80-24 Report Due to Possible Service Water System Leakage Into Containment 2009-05-03T07:10:00 | |