On Monday, 13 Apr 2009 at approximately 9
AM, the stack sample pump was observed to be off. On Friday, 10 Apr 2009, the reactor operated from approximately 11
AM to 4
PM.
Upon investigating this situation it was learned that at approximately 9:30 AM on 10 Apr 2009 the stack sample pump apparently lost power. The stack pump remained off until being re-started on 13 Apr 2009.
Technical Specification (TS) 3.5b requires the stack particulate and stack gas radiation monitoring channels to be operable during reactor operation. With the stack sample pump off, neither of these two channels were operable during reactor operation on 10 Apr 2009. The Auxiliary GM may serve as a substitute for one of the two required channels. As a result, the reactor was operated on 10 Apr 2009 in violation of TS 3.5b.
This event is a reportable event as defined in TS (1.2.24d and 6.6.2) under TS 6.7.1 since both channels were not operable as required by the Limiting Conditions for Operation TS 3.5b. The US Nuclear Regulatory Commission (NRC) was notified by telephone on 14 Apr 2009 at approximately 4 PM. The event will be investigated further with a detailed explanation of the event and actions taken and planned to prevent recurrence. The NRC will be given a written report on or before 24 Apr 2009.
Consequences of this event were not significant. Other radiation monitors were in service to monitor airborne radioactive effluent and reactor bay airborne activity. All of those monitors indicated typical radiation levels during reactor operation.