ENS 44840
ENS Event | |
---|---|
00:02 Feb 9, 2009 | |
Title | Test Reactor Exceeded Licensed Power Limit During Calibration |
Event Description | Performing routine thermal power calibration of nuclear instruments at indicated power of 230 kW per SOP-33. Calculation indicated actual power of 263 kW after collecting data. Licensed power limit is 250 kW.
No apparent cause for the calibration error. [The previous] calibration was successfully done on January 16, 2009. The reactor was shutdown. All systems functioned as required. The licensee noted that the pool temperature was about 7 degrees Celsius cooler than the historical pool temperature. The licensee will notify the NRR Project Manager and the State of Oregon.
The licensee re-performed the thermal calibration per SOP-33 to check results obtained on 2-08-09. The difference this time is the licensee extended the calibration for a much longer period (approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />). The licensee has determined that data obtained during the first 30 to 60 minutes of calibration indicated erratic information. [The licensee has] concluded that when [the reactor was] operating on 2-08-09 at an indicated power of 230 KW, actual power was 245 KW. [This power] is less than [the reactor's] licensed limit of 250 KW. Thus Reed did not violate its licensed power limit on 2-08-09 as previously reported. SOP-33 will be revised to avoid this error in the future. Notified the NRR PM (Hughes via e-mail) and NRR EO (Lee). R4DO (Miller) was notified for information. |
Where | |
---|---|
Reed College Portland, Oregon (NRC Region 4) | |
License number: | R-112 |
Reporting | |
Non | |
Time - Person (Reporting Time:+-3.73 h-0.155 days <br />-0.0222 weeks <br />-0.00511 months <br />) | |
Opened: | Stephen Frantz 20:18 Feb 8, 2009 |
NRC Officer: | Vince Klco |
Last Updated: | Feb 11, 2009 |
44840 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 44840\u003C/a\u003E - \u003Ca href=\"/Reed_College\" title=\"Reed College\"\u003EReed College\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETest Reactor Exceeded Licensed Power Limit During Calibration\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 44840 - Reed College\n","link":"","lat":45.481611111111114,"lon":-122.63088888888889,"icon":""}],"imageoverlays":null} | |
Reed College with Non | |
WEEKMONTHYEARENS 537712018-12-01T08:00:0001 December 2018 08:00:00
[Table view]Non Technical Specification Violation ENS 537252018-11-08T07:00:0008 November 2018 07:00:00 Non Technical Specification Violation - Unsecured Reactor Left Unattended ENS 528962017-08-09T17:30:0009 August 2017 17:30:00 Non Potential Technical Specification Violation ENS 495542013-11-16T20:11:00016 November 2013 20:11:00 Non Console Key Left Unattended ENS 448402009-02-09T00:02:0009 February 2009 00:02:00 Non Test Reactor Exceeded Licensed Power Limit During Calibration ENS 443722008-07-24T21:00:00024 July 2008 21:00:00 Non Test Reactor Exceeded Licensed Power Limit During Calibration 2018-12-01T08:00:00 | |