Event Description | [This event occurred at] 10-11-07 at 0540 hrs in the X-342 - Feed Facility, Autoclave #1, approximately 40 minutes into the heating cycle (mode II) on a refeed cylinder. An operator encountered an audible steam leak past the Viton 'O' ring at the 12 o'clock position. The steam was secured and autoclave shell opened. Inspection of the Viton 'O' ring resulted in the discovery of a separation of the splice joint. A pressure decay was performed to determine if the O- ring would have performed its 'Q' function. The test failed resulting in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> event.
The licensee has contacted the Regional NRC inspector for this facility. |
|---|