In accordance with 10 CFR 21.21(d)(3)(ii), FirstEnergy Nuclear Operating Company (
FENOC) is providing the required written notification of a concern regarding the potential for vibration inducted wear on the pilot poppet nut and stem assemblies provided for use in the Beaver Valley Power Station Unit No. 2 (BVPS-2)
Main Steam System Isolation Valves [MSIV] that if uncorrected could potentially create a significant safety hazard.
FENOC evaluated the concern via a Prompt
Operability Determination and concluded that there is reasonable assurance that currently installed valve components at BVPS-2 are
operable and plans to replace the affected components during the next BVPS-2 refueling outage.
Valve manufacturer of defective valve components is Weir Valves and Controls USA Inc. in Salem, MA.
The licensee notified the NRC Resident Inspector.