During routine operations on the
RNII production floor, it was observed that an incorrect
torque wrench was being used at mechanical assembly to tighten the Sensor Module Lock Nut. The incorrect tool was calibrated to a value of 12.5 ft-lb, resulting in undertorquing of the lock nut. The incorrect
torque wrench was removed from service and replaced with a tool calibrated to the correct
torque value of 35 ft-lb.
RNII reworked all affected transmitters that had not yet shipped to the correct
torque value.
Assembly with the incorrect tool could result in certain pressure transmitters having a degraded environmental seal between the sensor module and the electronics housing during or after a seismic event.
The five affected models have been delivered to the Byron and Comanche Peak nuclear stations.