ENS 41977
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
15:00 Sep 9, 2005 | |
Title | Unplanned Contamination Event |
Event Description | An unplanned contamination event occurred on 8 September 2005. This is a reportable event in accordance with 10CFR40.60 sub paragraph(1) based on an unplanned event that resulted in additional radiological controls being required for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period ended at 1000 on 9 September 2005 [the reported event date]. The additional control imposed was the wearing of air purifying respirators on the second floor of the Feed Materials Building. The location of the events was the Feed Materials Building second floor. The Feed Materials Building converts milled uranium oxide material to uranium hexafluoride by using a dry process. Air samples from the second floor were analyzed and the airborne radioactivity averaged approximately 6.5E-11 microCuries/ml. The airborne contaminant was natural uranium ore concentrate and the physical form is a light microscopic dust. The processes in the area of the elevated levels of airborne radioactivity have been secured and potential leakage paths are being investigated.
The licensee stated that bioassay sampling of exposed individuals will be performed within the routine sampling frequency, but prior to 09/30/05. The licensee notified NRC Region 2 (D. Collins). |
Where | |
---|---|
Honeywell International, Inc. Metropolis, Illinois (NRC Region 2) | |
License number: | SUB-526 |
Reporting | |
10 CFR 40.60(b)(1) | |
Time - Person (Reporting Time:+1.58 h0.0658 days <br />0.0094 weeks <br />0.00216 months <br />) | |
Opened: | John Riley 16:35 Sep 9, 2005 |
NRC Officer: | Mike Ripley |
Last Updated: | Sep 9, 2005 |
41977 - NRC Website | |
Honeywell International, Inc. with 10 CFR 40.60(b)(1) | |
WEEKMONTHYEARENS 451952009-07-11T01:00:00011 July 2009 01:00:00
[Table view]10 CFR 40.60(b)(1) Unplanned Contamination Event Requiring Additional Radiological Controls (Respirators) for More than 24 Hours ENS 451632009-06-24T15:45:00024 June 2009 15:45:00 10 CFR 40.60(b)(1) Access Restriction Due to Unplanned Contamination ENS 450582009-05-11T16:30:00011 May 2009 16:30:00 10 CFR 40.60(b)(1) Multiple Failures to Meet 24 Hour Reporting Criteria ENS 449392009-03-24T18:30:00024 March 2009 18:30:00 10 CFR 40.60(b)(1) Building Contaminated During Maintenance ENS 448712009-02-23T16:30:00023 February 2009 16:30:00 10 CFR 40.60(b)(1) Airborne Contamination Over the Limit in the Feed Materials Building ENS 448572009-02-16T16:30:00016 February 2009 16:30:00 10 CFR 40.60(b)(1) 24-Hour Report Involving an Unplanned Contamination Event ENS 444442008-08-27T15:00:00027 August 2008 15:00:00 10 CFR 40.60(b)(1) Unplanned Contamination Event ENS 419772005-09-09T15:00:0009 September 2005 15:00:00 10 CFR 40.60(b)(1) Unplanned Contamination Event ENS 418792005-07-25T14:18:00025 July 2005 14:18:00 10 CFR 40.60(b)(1) Unplanned Contamination Event Due to Filter Failure 2009-07-11T01:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_41977&oldid=1184408"