ELV-02649, Forwards Updated FSAR for Vogtle Generating Plant
| ML20070S195 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/28/1991 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20070S197 | List: |
| References | |
| ELV-02649, ELV-2649, NUDOCS 9104020189 | |
| Download: ML20070S195 (2) | |
Text
,
e
,.a,
c.,,m t, is ems o...e s. m I L =.1 O",' e lu 1 ;' v b 'i n i n f a i r /V al a.il d.%
J1 t
l e.94;e.(=. M b ? / 71!
L c.tmen Geon;ia Power Q ',3l (( '" ""
r.,,,,f d,,,..,<,,,..,
March 28, 1991 ELV-02649 0898 Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTH: Document Control Desk Washington, D. C.
20555 Gentlemen:
V0GTLE ELECTRIC GENERATING PLANT UPDATED FlHAL SAFETY ANALYSIS REPORI In accordance with 10 CFR 50.4(b) and 50.71(c) Georgia Power Company (GPC) hereby submits one signed original and ten copies of Revision 1 to the Vogtle Electric Generating Plant Updated final Safety Analysis Report.
This submittal is provided on a replacement page basis and is accompanied by an effective page list that identifies the current pages of the UFSAR.
This Revision 1 reflects changes through September 28, 1990.
Mr. C. K. McCoy states that he is a vice president of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company and that, to the best of his knowledge and belief, the information contained in the enclosed UFSAR Revision 1 accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.
GEORGIA POWER COMPANY By:
C. K. McCoy Sworn to and subscribed before me this JJ day of M / M
, 1991, f
.N ctco St b NotarfPubile MY COMMIS$10fl EXPIRES JWUMY 171993 CKH/JLL/gmb xc (see next page)
,s yo 9104020189 910320 IO PDR ADOCK 05000424 K
Geo!gialbwer b U. S. Nuclear Regulatory Commission ELV-02649 Page 2
Enclosures:
FSAR Update xc:
Georaia Power Company Mr. W. B. Shipman Mr. R. M. Odom Mr. P. D. Rushton NORMS U. S. Nuclear Reculatory Commission Mr. S, D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Etonser, Senior Resident inspector, Vogtle l
min
-