Text
- - - - - - - -
- c..m n-cn,,,
.mramve-ww., cwi w n
. ww,4 asc A*M njtssty<
l? ' vem...s C, q r Fw e,3,-
r5o% o.y Owny;m r u, a r ' St b phww ; h W.4 L!Ji1 March 12, 1992 W. G Ha.rston, ill un,,,va.n.%,a ELV-02506 twu cww m 0823 Docket No.
50 425 U. S. Nuclear Regulatory Comission ATTH: Document Control Desk Washington, D. C.
20555 Gentlemen:-
V0GTLE ELECTRIC GENERATING PLANT DETAILED CONTROL ROOM DESIGN REVIEW this letter confir.ts our conversation of March 4,1992, with Mr. Darl Hood of the USNRC.
In this conversation, Georgia Power Company (GPC) indicated that all Detailed Control Room Design Review (CROR) open items were completed for Vogtle Electric Generating Plant (VEGP) - Unit I during the last outage which ended in November, 1991. Also, GPC stated that all remaining CRDR items for VEGP - Unit 2 will be completed by the end of the second refueling outage which began on March 9, 1992. The only remaining item on Unit 2 is the HED on instrument striping.
If you should require any additional information, please contact this office.
Sincerely,,
y)
/bw W W. G. Hairston, Ill WGH,III/PAH/gmb xc: Georoia Power Compap_y Mr. W. B. Shipman Mr. M. Sheibani NORMS U. S. Nuclear Reoultipry Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonaer, Senior Resident inspector, Vogtle d