ELV-00571, Application for Amends to Licenses NPF-68 & NPF-81,revising Tech Spec 3.4.9 & Associated Bases,To Decrease Heatup & Cooldown Curves,For Unit 1,from 16 EFPY to 13 Efpy,Based on Westinghouse Analysis Per Generic Ltr 88-11.W/o Encl
| ML20247N434 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/28/1989 |
| From: | Hairston W GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ELV-00571, ELV-571, GL-88-11, NUDOCS 8908020397 | |
| Download: ML20247N434 (2) | |
Text
[
mc c c,,
ge ru TN 7 I:
um. u.
TJ_ - f I
v
'-1
.,h ;
I}
w c. ~ wn. ;
D n
July 28,1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk
' Washington, D. C.
20555 V0GTLE ELECTRIC GENERATING PLANT
'NRC DOCKETS 50-424, 50-425 OPERATING LICENSES NPF-68, NPF-81 REQUEST.TO REVISE TECHNICAL SPECIFICATIONS HEATUP AND COOLDOWN' CURVES Gentlemen:
In accordance with 10 CFR 50.90 and 10 CFR 50.59, Georgia Power Company. hereby proposes to amend the Vogtle Electric Generating Plant Technical Specifications, AppeMix A to Operating Licenses NPF-68 and NPF-81.
The proposed amendment revises Specification 3.4.9 and the associated bases concerning the applicaole number of effective full power years -of plant operation for Vogtle Unit 1.
Based upon an analysis performed by Westinghouse Electric Corporation in response to Generic Letter 88-11, the applicability of the Unit 1 heatup and cooldown curves decreased from % EFPY to 13 EFPY.
(See letter ELV-00014 dated November 28, 1988). provides a detailed description of the proposed change and the basis for the change.
provides our 10 CFR 50.92 evaluation showing that the proposed change does not involve significant hazards considerations. pavides instructions for the incorporation of the proposed amendment a,so the Technical s
Specifications and includes the proposed revised pages.
A copy ' of this letter and all applicable enclosures will 'be sent to the designated state official in accordance with 10 CFR 50.91.
8908020397 890728
~
fgG PDR ADOCK 05000424 p ph J
p FDC
,\\,
'8E y
m y
- Mr., W.
'G.' Hairston, III -states that he is a Senior ' Vice President of Georgia Power Compa:y and. is authorized to execute this oath on behalf.of~. Georgia
- PowerE Company, - and that, to the-best of his knowledge and belief; the facts set i' orth in this letter and enclosures are true.
GEORGIA POWER COMPANY.
By:'
(A)..f f
W. G. Hairston, III b
Sworn to and s'ubscribed-before me this ff day of July,1989.
14OAbni!Yb Notarf Public M con %SS!0N MIRES DEc.15.1992 WGH,III/PAH/gm
Enclosures:
- 1. - Basis for Proposed Change 2.
10 CFR 50.92 Evaluation 3.
Instructions and Revised Pages cc. w/ enclosures:
Georgia Power ~ Company Mr. C. K. McCoy Mr'. : P. D. ' Rushton Mr. G. Bockhold, Jr.
NORMS U. S.. Nuclear Regulatory Commission
. Mr. S. D. Ebneter,- Regional Administrator Mr. J. P. Hopkins, Licensing ' Project Manager, NRR Mr. J. f. Rogge, Senior Residence Inspector, Vogtle State of Georgia Mr. d. L. Ledbetter, Commissioner, Department of Natural Resources
- ______-___. _ _ _