DCL-25-069, Nuclear Material Transaction Report for New Fuel
| ML25231A290 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/19/2025 |
| From: | Darrell Adams Pacific Gas & Electric Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| DCL-25-069 | |
| Download: ML25231A290 (1) | |
Text
Pacific Gas and Electric Company"'
PG&E Letter DCL-25-069 NMMSS Operations U.S. Departmen't of Energy 1000 Independence Avenue, SW NA-ESH-12/Germantown Bldg.
Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel Dallas L. Adams Manager, Program Engineering Oiablo Canyon Power Plant Mail code 104/41427 P.O. Box 56 Avila Beach, CA 93424 805.545.6182 Dallas.Adams@pge.com 10 CFR 74.15 Pursuant to 10 CFR 74.15(a), the enclosure provides one file in a computer-readable format of the Nuclear Material Transaction Report for materials received on August 11 th, 2025. The file was prepared in accordance with NUREG/BR-0006, Revision 9, "Instructions for Completing Nuclear Material Transaction Reports,"
dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report D-24, "Personal Computer Data Input for Nuclear Regulatory Commission Licensees," dated March 24, 2020.
If you have any questions regarding the enclosure, please contact Mr. Gord Verdin,
Reactor Engineering, at (805) 545-3348.
Sincerely, Dallas L. Adams Enclosure cc: Diablo Distribution Mahdi 0. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager John D. Monninger, NRC Region IV Administrator NRC Document Control Desk A me mber of the STARS Alli ance Cal laway
- Dia bl o Canyo n
- Palo Verd e
- Wo l f Creek Date