ML21314A293
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/10/2021
From: Peck A
Pacific Gas & Electric Co
To: Cettin J
Document Control Desk, Office of Nuclear Reactor Regulation, US Dept of Energy (DOE)
References
DCL-21-084
Download: ML21314A293 (1)


Text

Adam S. Peck Senior Director Engineering, Technical And Emergency Services Diablo Canyon Power Plant Mail code 104/5/507 P.O. Box 56 Avila Beach, CA 93424 805.545.6675 Internal: 691.6675 A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 10 CFR 74.15 PG&E Letter DCL-21-084 John Cettin NMMSS Program, NA-532 Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel

Dear Mr. Cettin:

Pursuant to 10 CFR 74.15, the enclosure provides two files in a computer-readable format of the Nuclear Material Transaction Reports for materials received on November 1, 2021, and November 3, 2021. The files were prepared in accordance with NUREG/BR-0006, Revision 9, Instructions for Completing Nuclear Material Transaction Reports, dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report D-24, Personal Computer Data Input for Nuclear Regulatory Commission Licensees, dated August 2016.

If you have any questions regarding the enclosure, please contact Mr. Joseph Lee at (805) 545-3348.

Sincerely, Adam S. Peck Date Enclosure cc: Samson S. Lee, NRC Senior Project Manager Scott A. Morris, NRC Region IV Administrator Winston C. Smith, Acting NRC Senior Resident Inspector NRC Document Control Desk Diablo Distribution November 10, 2021 Pacilic Gas and Elecmc Company"