DCL-21-080, Nuclear Material Transaction Report for New Fuel

From kanterella
Jump to navigation Jump to search
Nuclear Material Transaction Report for New Fuel
ML21301A152
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/28/2021
From: Peck A
Pacific Gas & Electric Co
To: Cettin J
Document Control Desk, Office of Nuclear Reactor Regulation, US Dept of Energy (DOE)
References
DCL-21-080
Download: ML21301A152 (1)


Text

Pacific Gas and Electric Company"'

PG&E Letter DCL-21-080 John Cettin, NMMSS Program, NA-532, Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel

Dear Mr. Cettin:

Adam S. Peck Senior Director Engineering, Technical And Emergency Services Diablo Canyon Power Plant Mail code 104151507 P.D. Box 56 Avila Beach, CA 93424 805.545.6675 Internal: 691.6675 10 CFR 74.15 Pursuant to 10 CFR 7 4.15, the enclosure provides one file in a computer-readable format of the Nuclear Material Transaction Reports for materials received on October 20, 2021. The files were prepared in accordance with NUREG/BR-0006, Revision 9, "Instructions for Completing Nuclear Material Transaction Reports,"

dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report D-24, "Personal Computer Data Input for Nuclear Regulatory Commission Licensees," dated August 2016.

If you have any questions regarding the enclosure, please contact Mr. Joseph Lee at (805) 545-3348.

Sincerely,

~

ii{_r;o -kr ~

jf,?\\<-,

Adam S. Peck Enclosure cc:

Samson S. Lee, NRC Senior Project Manager Scott A. Morris, NRC Region IV Administrator Winston C. Smith, Acting NRC Senior Resident Inspector NRC Document Control Desk Diablo Distribution A member of t he STARS All iance Callaway

  • Di abl o Canyon
  • Pal o Verde
  • Wol f Creek Date