DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report
| ML23137A136 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/27/2023 |
| From: | Petersen D Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML23137A170 | List: |
| References | |
| DCL-2023-512 | |
| Download: ML23137A136 (1) | |
Text
!PBJcuffk: flaJ:s eJi!Od
!Eff 1£:©t!rffc <<::@m(PBJl!DJ/
PG&E Letter DCL-2023-512 April 27, 2023 Matthew T. Keeling, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 PG&E Diablo Canyon Power Plant (DCPP)
Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 Electronic Submission PDF Formatted File centralcoast@waterboards.ca.gov Receiving Water Monitoring Program 2022 Annual Report Enclosed is the Receiving Water Monitoring Program (RWMP) 2022 Annual Report for DCPP. This report presents the physical and biological data collected in the RWMP for the applicable monitoring surveys. Per prior agreement, no analysis or interpretation of the data was performed. Tables in the appendices provide summary statistics for each program task.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, I certify that the infonnation submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
If you have any questions or concerns regarding the enclosed report, or require additional,
information, please contact Trevor Rebel at (805) 441-5435.
Sincerely, Dennis Petersen Station Director - Diablo Canyon Povver Plant 2023512/nrh Enclosure (1)
PG&E Letter DCL-2023-512 Matthew T. Keeling, Executive Officer Central Coast Regional Water Quality Control Board April 27, 2023 Page2 cc w/enclosure:
Hardcopy Format:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Mahdi Hayes Acting NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator Licensing Assistant, Operations Branch U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
/