DCL-2013-520, Receiving Water Monitoring Program 2012 Annual Report

From kanterella
Jump to navigation Jump to search
Receiving Water Monitoring Program 2012 Annual Report
ML13151A166
Person / Time
Site: Diablo Canyon  
Issue date: 04/26/2013
From: Welsch J
Pacific Gas & Electric Co
To: Harris K
Office of Nuclear Reactor Regulation, State of CA, Central Coast Regional Water Quality Control Bd
References
DCL-2013-520
Download: ML13151A166 (2)


Text

Pacific Gas and Electric Company James M. Welsch Diablo Canyon Power Plant Station Director Mail Code 104/5/502 P. 0. Box 56 Avila Beach, CA 93424 Electronic Submission PDF Formatted File 805.545.3242 Internal: 691.3242 Fax: 805.545.4234 Internet: JMWI@pg PG&E Letter DCL-2013-520 April 26, 2013 Mr. Kenneth A. Harris Jr., Interim Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 Re:

PG&E Diablo Canyon Power Plant (DCPP)

Receiving Water Monitorinq Program 2012 Annual Report

Dear Mr. Harris:

Enclosed is a copy of the Receiving Water Monitoring Program (RWMP) 2012 Annual Report for DCPP. This report presents the physical and biological data collected in the RWMP during 2012. Per prior agreement, no analysis or interpretation of the data was performed. Tables in the appendices provide summary statistics for each program task.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Bryan Cunningham at (805) 545-4439.

Sincerely,

.des M. elsch Station Director - Diablo Canyon Power Plant 2013520/jlk/bkc Enclosure (1) z7Ji7 e.com 95Z

PG&E Letter DCL-2013-520 Mr. Kenneth A. Harris Jr., Interim Executive Officer Central Coast Regional Water Quality Control Board April 26, 2013 Page 2 cc w/enclosure:

PDF Formatted Electronic File Copy:

Regional Administrator, Region 9 U.S. Environmental Protection Agency 75 Hawthorne Street San Francisco, CA 94105 Attention: Carey Houk (W-5-3)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, CA 93940 Hardcopy Format:

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Thomas Hipschman Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 cc w/o enclosure:

Robyn Stuber U.S. EPA, Region 9 CWA Standards & Permits Office (Water Division) 75 Hawthorne Street San Francisco, CA 94105-3901 Jennifer Soloway SWRCB Office of the Chief Counsel 901 P Street Sacramento, CA 95812-0100 John Steinbeck Tenera Environmental 141 Suburban Road, Suite A2 San Luis Obispo, CA 93401