Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] Category:Environmental Monitoring Report
MONTHYEARML24003A7212023-11-27027 November 2023 Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 ML23137A1352023-04-18018 April 2023 NPDES Receiving Water Monitoring Program 2022 Annual Report ML23052A1152023-02-18018 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 2022 DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-032, 2021 Annual Nonradiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Nonradiological Environmental Operating Report DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-22-017, Submittal of 2021 Annual Radioactive Effluent Release Report2022-04-21021 April 2022 Submittal of 2021 Annual Radioactive Effluent Release Report DCL-22-025, 2021 Annual Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Radiological Environmental Operating Report DCL-21-037, Annual Nonradiological Environmental Operating Report2021-04-28028 April 2021 Annual Nonradiological Environmental Operating Report DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-21-022, 2020 Annual Radiological Environmental Operating Report2021-04-0101 April 2021 2020 Annual Radiological Environmental Operating Report L-21-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20202021-03-0101 March 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2020 DCL-20-036, 2019 Annual Non-Radiological Environment Operating Report2020-04-29029 April 2020 2019 Annual Non-Radiological Environment Operating Report DCL-20-010, 2019 Annual Radiological Environmental Operating Report2020-04-16016 April 2020 2019 Annual Radiological Environmental Operating Report L-20-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20192020-03-0202 March 2020 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019 DCL-2020-509, 2019 Annual Report on Discharge Self-Monitoring2020-02-27027 February 2020 2019 Annual Report on Discharge Self-Monitoring DCL-19-026, Annual Radioactive Effluent Release Report2019-04-23023 April 2019 Annual Radioactive Effluent Release Report DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-17-034, 2016 Annual Non-Radiological Environmental Operating Report2017-04-27027 April 2017 2016 Annual Non-Radiological Environmental Operating Report DCL-17-031, Transmittal of 2016 Annual Radioactive Effluent Release Report2017-04-26026 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release Report DCL-17-030, Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report2017-04-26026 April 2017 Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report ML17128A0242017-04-26026 April 2017 Submittal of 2016 Annual Radiological Environmental Operating Report ML17096A7662017-04-0606 April 2017 Submittal of Mitigating Strategies Assessment for Flooding Report DCL-17-030, 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP)2017-03-29029 March 2017 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP) DCL-2017-511, Submittal of 2016 Annual Discharge Self-Monitoring Report2017-02-28028 February 2017 Submittal of 2016 Annual Discharge Self-Monitoring Report DCL-2017-501, Diablo Power Plant - 2016 Annual Sea Turtle Report2017-01-27027 January 2017 Diablo Power Plant - 2016 Annual Sea Turtle Report DCL-2017-500, Discharge Monitoring Report for Fourth Quarter 20162017-01-20020 January 2017 Discharge Monitoring Report for Fourth Quarter 2016 DCL-16-113, Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports2016-11-0101 November 2016 Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports DCL-16-055, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report ML16154A1652016-04-27027 April 2016 Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-16-054, Annual Radioactive Effluent Release Report for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Report for 2015 L-2016-518, Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report2016-04-27027 April 2016 Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-2016-516, Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring2016-04-20020 April 2016 Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring DCL-15-137, Corrections to the 2014 Annual Radioactive Effluent Release Report2015-12-31031 December 2015 Corrections to the 2014 Annual Radioactive Effluent Release Report DCL-2015-540, Third Quarter 2015 Report of Discharge Self-Monitoring2015-10-20020 October 2015 Third Quarter 2015 Report of Discharge Self-Monitoring DCL-2015-532, Discharge Self-Monitoring Report for 2nd Quarter of 20152015-07-20020 July 2015 Discharge Self-Monitoring Report for 2nd Quarter of 2015 DCL-15-056, 2014 Annual Nonradiological Environmental Operating Report2015-04-29029 April 2015 2014 Annual Nonradiological Environmental Operating Report DCL-15-053, 2014 Annual Radioactive Effluent Release Report2015-04-29029 April 2015 2014 Annual Radioactive Effluent Release Report DCL-2015-523, Receiving Water Monitoring Program 2014 Annual Report2015-04-29029 April 2015 Receiving Water Monitoring Program 2014 Annual Report ML15117A6572015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 3 of 5 DCL-15-046, 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 52015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 5 ML15117A6562015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 2 of 5 ML15117A6602015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 4 of 5 ML15117A6622015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 5 of 5 2023-05-01
[Table view] |
Text
acific Gas andPacific GaDiablo Gas and Power.Plant Canyon Electric Company Electric Company P.O. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2012-538 Certified/Return Receipt 7010-1060-0000-4204-4340 October 17, 2012 Sarah Wilkin, Stranding Coordinator National Marine Fisheries Service 501 West Ocean Blvd., Suite 4200 Long Beach, California 90802-4213
Dear Ms. Wilkin:
Enclosed is a National Marine Fisheries Service (NMFS) Marine Mammal and Marine Turtle Stranding Report for a sea turtle discovered in the Diablo Canyon Power Plant (DCPP) intake structure.
A live sea turtle was discovered in the 1-2 intake structure forebay by plant operations personnel at approximately 3:45 p.m. on September 21, 2012. The turtle was identified as a green sea turtle (Chelonia mydas).
As authorized in DCPP's incidental take statement issued September 18, 2006, DCPP staff removed the turtle from the intake structure that afternoon (September 21, 2012) for release offshore of the facility. The turtle was removed by salmon net and transported to a facility boat. The plant biologist completed measurements of the specimen, and photographs were taken. The photographs are enclosed in addition to the stranding report. The turtle was estimated to weigh 18 pounds, with a shell length (notch-tip) of 19 inches, and appeared to be in good health based on visual observation.
There were no abrasions or indication of any injury. The turtle was tagged on the left front flipper with tag #MC-0, and subsequently transported by boat and released in the ocean approximately one mile southwest of DCPP. The turtle swam away strongly in a southerly direction following release.
Discovery and release of the turtle was reported to NMFS via telephone on September 21, 2012, within the required 48-hour reporting period.
Live green sea turtles have been discovered at DCPP's intake on ten previous occasions during commercial operations: August 08, 2010, September 08, 2009, July 23, 2007, February 27, 2001, April 16, 2000, August 24, 1999, May 29, 1999, June 12, 1997, January 10, 1997, and April 27, 1994. Green sea turtles are infrequently observed in the coastal waters off of DCPP.
PG&E Letter DCL-2012-538 Sarah Wilkin, NMFS October 17, 2012 Page 2 If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Jim Kelly of my staff at (805) 545-3194.
Sincerely, Kenneth W. Cortese Manager- Chemistry and Environmental Operations 2012538/jlk/bkc Enclosures (2) cc w/enclosures: Alan B. Wang NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08B1 11555 Rockville Pike Rockville, MD 20852-2738 Laura Micewski Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Marine Region California Department of Fish and Game 20 Lower Ragsdale Dr. Suite 100 Monterey, CA 93940
MARINE MAMMAL AND MARINE TURTLE STRANDING REPORT SID#
(NMFS USE)
FIELD NO.: NMFS REGISTRATION NO._
COMMON NAME: Green Sea Turtle GENUS: Chelonia SPECIES: mydas EXAMINER Name: James L. Kelly Agency:Pacific Gas & Electric CO.Phone: (805) 545-3194 Address: Diablo Canyon Power Plant (DCPP), P.O. Box 56, Avila Beach, California 93424 LOCATION San Luis LOCATION San Luis TYPE OF OCCURRENCE State: CA County:0bispo Rass Stranding: (Yes) /4 # Animals One (1)
Human Interaction: (Yes) / No) / (?)
City: Avila Beach Check one: 1. Boat collision
- 2. Shot Locality Details: Diablo Canyon 4. Fishery interaction Other Found alive and healthy in the Power Plant (DCPP) 9-Miles NW of power plant intake structure.
How determined:
Avila Beach. 1-2 Forebay Bar Rack of the Plant Intake Structure. Dther Causes (if known):,
- Longitude: 1200 51' 13" W DATE OF INITIAL OBSERVATION: DATE OF EXAMINATION:
Yr 2012 Mo September Day 21 Yr 2012 - Mo September Day 21 CONDITION: Check one:jl.Alive CONDITION: Check one:_Il.Alive
_2.Fresh dead 2.Fresh dead 3.Moderate decomp. 3.Moderate decomp.
4.Advanced decomp. 4.Advanced decomp.
5.Mummified 5.Mummified
__? Unknown ? Unknown LIVE ANIMAL - Condition and Disposition: TAGS APPLIED?: JYe / No Check one X I.Released at site TAGS PRESENT?: ZY/(jýT or more: _2.Sick 3.Injured Dorsal Left Right
__4.Died
_5.Euthanized ag No.(s): MC-0
__6.Rehabilitated and released
_? Unknown Color(s): Silver Transported to: 1.0-Miles SW Offshore T e: Fli_ per 2
(Died) /Relae=) Date: September 21, 012P.Tlacement CFront Rear Front/Rear CARCASS - Disposition, check one: MORPHOLOGICAL DATA:
Check one: _l.Left at site Sex - Check one: _l.Male
_2.Buried 2.Female
_3.Towed -E? Unknown
__4.Sci. collection (see below)
-_5.Edu. collection (see below) Straight Length: 19 (cm)/M (est)
- 6.Other Weight: 18 (kg) ( /=
_? Unknown PHOTOS TAKEN? (Ys/ (No)
IECROPSIED? (Yes) / (No)
REMARKS: Straight Width (Widest Point) 18 & 1/2 inches; Tail Length 1 inch.
A Lepas Barnacle was attached to the right edge of shell 1/3 of the length back from the front of the shell. Turtle appeared stronq and healthy. No abrasions. No indications of any injury_.__
jISPOSITION OF TISSUE/SKELETAL MATERIAL:
X% /7 It is estimated that completion U OMB#0648-.0178 of this form requires 20 minutes.
PG&E Letter DCL-2012-538 October 17, 2012 Specimen Photographs - Green Sea Turtle (Chelonia mydas)
Diablo Canyon Power Plant - September 21, 2012 Photographs Page 1 of 2
PG&E Letter DCL-2012-538 October 17, 2012 Specimen Photographs - Green Sea Turtle (Chelonia mydas)
Diablo Canyon Power Plant - September 21, 2012 Photographs Page 2 of 2