DCL-2007-519, Transmittal of Diablo Canyon Receiving Water Monitoring Program 2006 Annual Report

From kanterella
(Redirected from DCL-2007-519)
Jump to navigation Jump to search
Transmittal of Diablo Canyon Receiving Water Monitoring Program 2006 Annual Report
ML071280374
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/26/2007
From: Becker J
Pacific Gas & Electric Co
To: Briggs R
Office of Nuclear Reactor Regulation, State of CA, Central Coast Regional Water Quality Control Bd
References
DCL-2007-519
Download: ML071280374 (3)


Text

A Pacific Gas and Electric Company Diablo Canyon Power Plant P0. Box 56 Avila Beach, CA 93424 800.545.6000 April 26, 2007 PG&E Letter DCL-2007-519 Certified/Return Receipt

  1. 7007-0220-0004-6735-9424 Mr. Roger Briggs, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 Re:

PG&E Diablo Canyon Power Plant (DCPP) Submittal -

Receiving Water Monitoring Program 2006 Annual Report

Dear Mr. Briggs:

Enclosed is a copy of the Receiving Water Monitoring Program 2006 Annual Report for DCPP. This report presents the physical and biological data collected in the Receiving Water Monitoring Program during 2006. Per our agreement, no analysis or interpretation of the data were performed. Tables in the appendices provide summary statistics for each task.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

If you have any questions regarding this report, please contact Bryan Cunningham of my staff at (805) 545-4439.

Sinkerely, James

. Becker Vice President-Diablo Canyon Operations and Station Director 2007519/JLK/kmo

PG&E Letter DCL-2007-519 Mr. Roger Briggs, Executive Officer Central Coast Regional Water Quality Control Board April 26, 2007 Page 2 cc: w/encl.: Peter von Langen, CCRWQCB 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, California 93490 Regional Administrator, Region 9 U. S. Environmental Protection Agency 75 Hawthorne Street San Francisco, CA 94105 Attention: Carey Houk (W-5-3)

Resident Inspector, Terry Jackson U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 Director, Division of Reactor Projects U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 John Steinbeck TENERA DCPP, Avila Beach

PG&E Letter DCL-2007-519 Mr. Roger Briggs, Executive Officer Central Coast Regional Water Quality Control Board April 26, 2007 Page 3 cc w/o encl.: Robyn Stuber US EPA, Region 9 CWA Standards & Permits Office (Water Div.)

75 Hawthorne Street San Francisco, CA 94105-3901 Jennifer Soloway SWQCB Office of the Chief Counsel 901 P Street Sacramento, CA 95812-0100