Pacific Gas and Electric Company January 5, 2012 PG&E Letter No. DCL-12-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 James R. Becker Site Vice President Diablo Canyon Power Plant Licensing Basis Verification Project
Dear Commissioners and Staff:
In Pacific Gas and Electric Company (PG&E) Letter DCL-1 0-064, dated Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 June 11,2010, PG&E provided the NRC a milestone schedule for the Licensing Basis Verification Project (LBVP) Phase II. The milestone schedule reflected a completion date of December 2014 for LBVP Phase II.
PG&E is revising its commitment to complete LBVP Phase II from December 2014 to December 31,2015. The completion date has been extended to accommodate additional scope that has been added to the project and the expected corrective actions that will be required.
Completion of LBVP Phase II includes completion of applicable licensing basis reviews, system reviews, component design basis report reviews, electronic database upgrades, implementation of new current licensing basis search tools, and correction of licensing basis deficiencies that do not require prior NRC approval. In addition, completion of LBVP Phase II includes submittal of License Amendment Requests (LARs) and initiating design changes. The completion of the design changes and the receipt of approved LARs will extend beyond the completion date of December 31,2015.
This Letter contains a change to the completion date for a prior PG&E regulatory commitment to perform the Diablo Canyon Power Plant (DCPP) LBVP.
Questions concerning the DCPP LBVP should be directed to Mr. Eric Nelson at (805) 545-4777.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
Document Control Desk m January 5,2012
~&~ Page 2
- S
- Y' ~ ~
James R~BeCker
~---
Site Vice President EPN/50418366 cc:
Elmo C. Collins, NRC Region IV PG&E Letter DCL-11-140 Ron Kopriva, NRC Senior Reactor Inspector, Region IV Eric Nelson, PG&E Michael S. Peck, NRC Senior Resident Inspector Kenneth Peters, PG&E Alan B. Wang, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek