Text
El Pacific Gas and
.1 n Electric Company James R. Becker Vice President-Diablo Canyon Operations and Station Director Diablo Canyon Power Plant P.O.
Box 56 Avila Beach. CA 93424 805.545.3462 Fax: 805.545.4234 April 14, 2005 PG&E Letter DCL-05-040 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Monthly Operatinc Report for March 2005
Dear Commissioners and Staff:
Enclosed is the Monthly Operating Report (MOR) for Diablo Canyon Power Plant, Units 1 and 2, for March 2005. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.
On March 22, 2005, the NRC issued License Amendments 180 and 182, 'Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports." Therefore, this is the last hard-copy submittal of the MOR. In the future, this information will be transmitted electronically to the NRC via INPO's consolidated data entry database.
Sincerely, James R. ecker Imp/3386/R0272162 Enclosures cclenc:
Peter A. Darbee Paul R. Fox, American Nuclear Insurers Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Prouix, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager Linda J. Wells, NEI (Ijw@nei.org)
INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alliance k
,.- I ] 2___
Caltaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek PG&E Letter DCL-05-040 OPERATING DATA REPORT DOCKET 11O.
5D-275 UNIT NAME Diablo Canyon I DATE Apr 06,2005 COMPLETED BY Lrry Parker TELEPHONE (eos) 545-3386 REPORTING PERIOD:
M.arch 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1 10300 08 0
- 3. Number of Hours the Reactor was Citical
- 4.
Number ot Hours Generator On4ine 5,
Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Xtonth Cumula/e 744.00 2.160.00 152.148.17 744.00 2.160.00.
150,499.71 0000 050D 0.00 Si 8.287.0 -
2.288 077.600 156,313,698.00 UNIT SHUTDOWNS SUMMAARY: DCFP Unk i remained in tMode 1 (Power Operation) at approimately 1D percert poAer during the ronth of March.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D Regulatory Restriction E
Operator Training & Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriptScram 3
Automatic TripScram 4
Continuation 5
Other (Explain) 1 PG&E Letter DCL-05-040 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 5D-323 ujaoDI 11.flyon)
Ap 6, 2056 Larry Parker (ePc0s) 545-3366 March 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1 119.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-ine Reserve Shutdown Hours Net Electrical Energy Generated IMWHrs)
This Month Yrto-Date 744.00 2.160.00 744.00 2.160.00 0.00
- 0. 815.954.00 2.364,947.00 148,476.18 146.809.95 0.00 154,800,098.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments SUMMIARY: DCPP Unit 2 remalined in Moie 1 (Pow^er Operation) at approxmately I DO percent powrer during the month of tbrch.
1 2
Reason:
,A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E Operator Training & Ucense Examination F Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic TripScram 4
Continuation S Other (Explain) 2