DCL-05-010, January 2005 Monthly Operating Report for Diablo Canyon, Units 1 and 2
| ML050540604 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/11/2005 |
| From: | Becker J Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-05-010 | |
| Download: ML050540604 (3) | |
Text
.WI PacificGasand C. Electric Company James R. Becker Vice President-Diablo Canyon Operations and Station Director Diablo Canyon Power Plant PO. Box 56 Avila Beach, CA 93424 805.545.3462 Fax: 805.545.4234 February 11, 2005 PG&E Letter DCL-05-010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Monthlv Operating ReDort for Januarv 2005
Dear Commissioners and Staff:
Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for January 2005. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.
Imp/33861R0266969 Enclosures cc/enc:
Peter A. Darbee Paul R. Fox, American Nuclear Insurers Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Proulx, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager Linda J. Wells, NEI (Ijwinei.org)
INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
" ,J f9 LII
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-275 DLablo Canyon 1 February 07, 2M05 Larry Parker en, January 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,103.00 1,087.00 3.
4.
S.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 800,368.00 Yr-to-Date 744.00 744.00 0.00 800,368.00 Cumulative 150.732.17 149.083.71 0.00 154,825,989.500 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason I Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Unit 1 started January 2005 In Mode 1 (Power Operation) at approximately 100 perecent power.
On January 5, 2005. operators initiated a planned curtailment to approximately 50 percent, to remove biofouling from the circulating Water system. On January 7,2005, operators returned the unit to approximately 100 percent power. There were no other significant operational activities.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TripL'Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain) 1
OPERAlING DATA REPORT DOCKET NO.
50-323 UNIT NAME Dlao Canyon 2 DATE February 07,2005 COMPLETED BY Larry Parker TELEPHONE
$D5-145-3336 REPORTING PERIOD:
January 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,119.00
,087.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line S. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 744.00 147,060.18 744.00 744.00 145.393.95 OM00 0.00 0.00 812.938.00 812,938.00 153,248,089.00 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Unit 2 began January 2005 In Mode I (Power Operation) at approximately 100 percent power.
There were no significant operation activities.
i Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D Regulatory Restriction E
Operator Training & LUcense Examination F Administration G Operational Error (Explain)
H Other (Explain) 2 Method:
I Manual 2
Automatic TriplScram 4
Continuation 5
Other (Explain) 2