DCL-03-169, Emergency Plan Implementng Procedure Update

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementng Procedure Update
ML040020349
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/18/2003
From: Tomkins J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-03-169
Download: ML040020349 (2)


Text

-q WE Pacific sGs and R-I Electric Company Diablo Canyon Power Plant P0. Box 56 Avila Beach, CA 93424 December 18, 2003 800.545.6000 PG&E Letter DCL-03-169 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Update

Dear Commissioners and Staff:

In accordance with Section V, "Implementing Procedures," of 10 CFR 50, Appendix E, enclosed is an update to the Emergency Plan (EP) implementing procedures for Diablo Canyon Power Plant, Units I and 2 as indicated in Enclosure 1.

As provided under 10 CFR 50.54(q), the changes have been made without prior NRC approval since they do not decrease the effectiveness of the EP. The EP, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This update contains privacy/proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27. Enclosure 2 provides the location of the privacy/proprietary information.

If there are any questions regarding this update, please contact Mr. Mark Lemke of my staff at (805) 545-4787.

Sincerely, fames E. Tomkins

/Director-Site Servces 6/ddmll 345/A0574880 Enclosures cc:

David L. ProuIx Girija S. Shukla cclenc: Bruce S. Mallett Senior Emergency Preparedness Inspector (RGN-IV/DRS)

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance t

5 Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek PG&E Letter DCL-03-169 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Table of Contents - Emergency Plan Implementing Procedures Plant Manual Volume B (OMIO.DCI only), and Volume 3B Proc. No.

Rev.

Title OM10.DC1 EP G-1 EP G-2 EP G-3 EP G4*

EP G-5 EP R-2 EP R-3 EP R-7 EP OR-3 EP RB-1 EP RB-2 EP RB-3 EP RB-4 EP RB-5 EP RB-8 EP RB-9 EP RB-10 EP RB-1 1 EP RB-12 EP RB-14 EP RB-15 2A Emergency Preparedness Drills and Exercises 33 27 41 22 9A Emergency Classification and Emergency Plan Activation Interim Emergency Response Organization Emergency Notification of Off-Site Agencies Assembly and Accountability Evacuation of Nonessential Site Personnel 21 Release of Airbome Radioactive Materials Initial Assessment 8C Release of Radioactive Liquids 13A Off-Site Transportation Accidents 6A Emergency Recovery 5B Personnel Dosimetry 5

Emergency Exposure Guides 4

Stable Iodine Thyroid Blocking 4A Access to and Establishment of Controlled Areas Under Emergency Conditions 5

Alternate Personnel Decontamination Facilities 17 Instructions for Field Monitoring Teams 11A Calculation of Release Rate 10 Protective Action Recommendations 12 Emergency Offsite Dose Calculations 6

Plant Vent Iodine and Particulate Sampling During Accident Conditions 7A Core Damage Assessment Procedure II Post Accident Sampling System EP EF-1 EP EF-2 EP EF-3 EP EF-4 EP EF-9 EP EF-1 0 31 Activation and Operation of the Technical Support Center 27 Operational Support Center 24 Activation and Operation of the Emergency Operations Facility 14 Activation of the Off-Site Emergency Laboratory 8

Backup Emergency Response Facilities 5

Joint Media Center Activation and Operation

  • Procedure included in this submittal