CY-23-008, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022
| ML23124A201 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/20/2023 |
| From: | Desmarais R Connecticut Yankee Atomic Power Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| CY-23-008 | |
| Download: ML23124A201 (1) | |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD
- EAST HAMPTON, CT 06424-3099 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 April 20, 2023 CY-23-008 10 CFR 50.4 and 10 CFR 50.36a(a)(2)
Connecticut Yankee Atomic Power Company Haddam N eek Plant Independent Spent Fuel Storage Installation NRC License No. DPR-61 (NRC Docket Nos. 50-213 and 72-39)
Subject:
Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 10 CFR 50.36a(a)(2), Section 2.3.2 of Appendix C of the Connecticut Yankee Atomic Power Company (CY APCO) Quality Assurance Program (QAP) for the Haddam Neck Independent Spent Fuel Storage Installation (ISFSI), and Section F.2 of the Off-Site Dose Calculation Manual (ODCM) for the Haddam Neck ISFSI require CY APCO to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides the report for the period of January 1 through December 31, 2022.
Section 2.3.1 of Appendix C of the CY APCO QAP for the Haddam N eek ISFSI and Section F.1 of ODCM for the Haddam N eek ISFSI require CY APCO to submit an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1 through December 31, 2022.
Section 2.2.c of Appendix C of the CY APCO QAP for the Haddam Neck ISFSI requires CY APCO to submit changes to the ODCM for the Haddam Neck ISFSI as a part of or concurrent with the Annual Radioactive Effluent Release Report. No revisions to the ODCM for the Haddam Neck ISFSI were issued in calendar year 2022.
If you have any questions regarding this submittal, please do not hesitate to contact me at (860) 267-6426 ext. 306.
Connecticut Yankee Atomic Power Company CY-23-008/ April 20, 2023/Page 2
Enclosures:
- 1. Haddam N eek Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, January-December 2022.
- 2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January-December 2022.
cc:
R. Lorson, NRC Region I Administrator A. Dimitriadis, Chief, Decommissioning Branch, NRC, Region I Y. Diaz-Sanabria, Chief, Division of Fuel Management, Storage and Transportation Licensing Branch J. Semancik, Director, CT DEEP, Radiation Division