CY-18-010, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Revisions to the Off Site Dose Calculation Manual for 2017
| ML18108A128 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/10/2018 |
| From: | Hemingway S Connecticut Yankee Atomic Power Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| CY-18-010 | |
| Download: ML18108A128 (2) | |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD* EAST HAMPTON, CT 06424-3099 April 10, 2018 CY-18-010 IO CFR 50.4 and IO CFR 50.36a(a)(2)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation NRC License No. DPR-61 (NRC Docket No. 50-213)
Subject:
Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Revisions to the Off site Dose Calculation Manual for 2017 10 CFR 50.36a(a)(2), Section 2.3.2 of Appendix C of the Connecticut Yankee Atomic Power Company (CY APCO) Quality Assurance Program (QAP) for the Haddam Neck Independent Spent Fuel Storage Installation (ISFSI), and Section F.2 of the Off-Site Dose Calculation Manual (ODCM) for the Haddam Neck ISFSI require CY APCO to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides the report for the period of January 1 through December 31, 2017.
Section 2.3.1 of Appendix C of the CY APCO QAP for the Haddam N eek ISFSI and Section F.1 of ODCM for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1 through December 31, 2017.
Section 2.2.c of Appendix C of the CY APCO QAP for the Haddam N eek ISFSI requires CY APCO to submit changes to the ODCM for the Haddam Neck ISFSI as a part of or concurrent with the Annual Radioactive Effluent Release Report. No revisions to the ODCM for the Haddam N eek ISFSI were issued in calendar year 2017.
If you have any questions regarding this submittal, please do not hesitate to contact me at (860) 267-6426 ext. 303.
Respectfully, 8L~
Shae Hemingway ISFSI Manager
- r:~1f jt)tf 5S6)
µJV!5>>
Connecticut Yankee Atomic Power Company CY-18-0 I 0/ April XX, 2018/Page 2
Enclosures:
I. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, January-December 2017.
- 2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January - December 2017.
cc:
D. Lew, Acting NRC Region I Administrator R. Powell, Chief, Decommissioning Branch, NRC, Region I J. Nguyen, NRC Project Manager, Haddam Neck J. Semancik, Director, CT DEEP, Radiation Division