CY-04-196, Registration of Spent Fuel Dry Cask in Use at the Haddam Neck Plant (HNP) Independent Spent-Fuel Storage Installation (ISFSI)
| ML042740414 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck, 07201025 File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 09/22/2004 |
| From: | Gerard van Noordennen Connecticut Yankee Atomic Power Co |
| To: | Document Control Desk, NRC/NMSS/SFPO |
| References | |
| +KBR1SISP20050509, -RFPFR, CY-04-196, FOIA/PA-2005-0203 | |
| Download: ML042740414 (2) | |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD
- EAST HAMPTON, CT 06424-3099 CY-04-196 License No. DPR-61 Docket No. 50-213 Docket No. 72-0039 Re: 10 CFR 72.212 Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Registration of Spent Fuel Dry Cask in use at the Haddam Neck Plant (HNP) Independent Spent-Fuel Storage Installation (ISFSI)
In accordance with 10 CFR 72.212(b)(1)(ii), Connecticut Yankee Atomic Power Company (CYAPCO) is registering the use of a spent fuel dry cask to store spent fuel under a 10 CFR Part 72 general license at the HNP ISFSI.
Licensee's Name: Connecticut Yankee Atomic Power Company Licensee'sAddress: Haddam Neck Plant 362 Injun Hollow Road East Hampton, CT 06424-3099 Reactor License Number: DPR-61 Reactor Docket No.: 50-213 ISFSI Docket No.: 72-0039 Contact'Namne and
Title:
- G. P. van Noordennen, Regulatory Affairs Manager Cask Certification No.: Certificate of Compliance 1025, Amendment No. 3,
-October 1, 2003
Document Control Center CY-04-196 / Page 2 Cask Model No.: NAC-MPC Cask Identification Nos.: Transportable storage canister (TSC) Identification No.
CY-MPC-TSC-41 4-27 Vertical Concrete Cask (VCC) Identification No.: CY-VCC-27 Date in Service: September 17, 2004 There are no regulatory commitments contained in this letter.
If you should have any questions regarding this submittal, please contact me at (860) 267-3938.
Sincerely, 6X4-;S-O4 Gerard P. van Noordennen Date Regulatory Affairs Manager cc:
S. J. Collins, NRC Region 1 Administrator T. B. Smith, NRC Project Manager, Haddam Neck Plant R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Region 1 E. L. Wilds, Jr., Director, CT DEP, Monitoring and Radiation Division