CY-04-160, Registration of Spent Fuel Dry Cask in Use at the Haddam Neck Plant: (HNP) Independent Spent Fuel Storage Installation (ISFSI

From kanterella
(Redirected from CY-04-160)
Jump to navigation Jump to search
Registration of Spent Fuel Dry Cask in Use at the Haddam Neck Plant: (HNP) Independent Spent Fuel Storage Installation (ISFSI
ML042230186
Person / Time
Site: Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/04/2004
From: Gerard van Noordennen
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
-RFPFR, CY-04-160
Download: ML042230186 (2)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUNHOLLOW ROAD. EAST HAMPTON, CT 06424-3099

~' ~

CY-04-160 License No. DPR-61

' -Docket No. 50-213 Docket No. 72-0039 Re: 10 CFR 72.212 Director, Spent Fuel Project Office, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Registration of Spent Fuel Drv Cask in use at the Haddam Neck Plant:

(HNP) Indenendent Spent Fuel Storage Installation (ISFSI In accordance with 10 CFR 72.212(b)(1)(ii), Connecticut Yankee Atomic Power Company (CYAPCO) is registering the use of a spent fuel dry cask to store spent fuel under a 10 CFR Part 72 general license at the HNP ISFSI.

Licensee's Name: Connecticut Yankee Atomic Power Company Licensee's Address: Haddam Neck Plant 362 Injun Hollow Road East Hampton, CT 06424-3099 Reactor License Number: DPR-61 Reactor Docket No.: 50-213 ISFSI Docket No.: 72-0039 Contact Name and

Title:

G. P. van Noordennen, Regulatory Affairs Manager Cask Certification No.: Certificate of Compliance 1025, Amendment No. 3, October 1, 2003

V Document Control Center CY-04-160 / Page 2 Cask Model No.: NAC-MPC Cask Identification Nos.: Transportable storage canister (TSC) Identification No.

CY-MPC-TSC-414-21 Vertical Concrete Cask (VCC) Identification No.: CY-VCC-21 Date in Service: July 31, 2004 There are no regulatory commitments contained in this letter.

If you should have any questions regarding this submittal, please contact me at (860) 267-3938.

Sincerely, C

AVs, G. P. van Noordennen Date Regulatory Affairs Manager cc:

S. J. Collins, NRC Region 1 Administrator T. B. Smith, NRC Project Manager, Haddam Neck Plant R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Region I E. L. Wilds, Jr., Director, CT DEP, Monitoring and Radiation Division