1101 Market Street, Chattanooga, Tennessee 37402 CNL-21-063 August 10, 2021 10 CFR 71.106 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Subject:
24-MONTH REPORT OF CHANGES TO RADIOACTIVE MATERIAL PACKAGES QUALITY ASSURANCE PROGRAM In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 71.106(b), Tennessee Valley Authority (TVA), is submitting the 24-month report of changes made to the approved Radioactive Material Packages Quality Assurance Program (PQAP). Currently, TVA maintains Quality Assurance Program Approval for Radioactive Material Packages, Approval Number 0227, Revision 16, Docket Number 71-0227. This letter provides a report of changes made to the TVA PQAP that do not reduce commitments for the 24-month period of August 13, 2019, through August 13, 2021.
U.S. Nuclear Regulatory Commission CNL-21-063 Page 2 August 10, 2021 Changes Made to the TVA PQAP:
Removed abbreviation for Radioactive Material Shipment Manual (RMSM), a document for information only.
Organizational position titles and reporting relationships were updated to match the current TVA nuclear organization.
Removed reference to RMSM in Steps 4.1.4, 5.0, 6.2, 6.3, 8.5, 8.6, and 10.0. These sections refer to applicable TVA nuclear procedures.
In Section 13.2 regarding regulatory guidance, the following administrative changes were made:
o Removed reference to Nuclear Regulatory Commission (NRC) Draft Regulatory Guide DG-7004, Establishing Quality Assurance Programs for Packaging Used in the Transport of Radioactive Material o Changed NRC Bulletin 79-21 to Information Notice (IN) 79-21 o Changed NRC IE Bulletin 83-10 to IN 83-10 o Added NRC IE Bulletin 79-20 Justification/Bases for Changes These are routine changes updating the PQAP to reflect the current state of the organization, administrative changes for clarity, and non-substantive changes to editorial items.
These changes did not reduce any prior commitments in the TVA PQAP.
There are no new regulatory commitments in this letter. Please address any questions regarding this request to Kimberly D. Hulvey, Senior Manager, Fleet Licensing, at (423) 751-3275.
Respectfully, James T. Polickoski Director, Nuclear Regulatory Affairs cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant