CNL-14-155, Submittal of Revision to the Radiological Emergency Plan and On-Shift Staffing Analysis

From kanterella
Jump to navigation Jump to search
Submittal of Revision to the Radiological Emergency Plan and On-Shift Staffing Analysis
ML15205A111
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/12/2014
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-14-155
Download: ML15205A111 (2)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-155 September 12, 2014 10 CFR 50.34 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License NPF-90 NRC Docket No. 50-390 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT UNITS 1 AND 2 - SUBMITTAL OF REVISION TO THE RADIOLOGICAL EMERGENCY PLAN AND ON-SHIFT STAFFING ANALYSIS

References:

1. Electronic Mail from NRC to TVA, Watts Bar, Unit 2 - RAIs for Radiological Emergency Plan (NP-REP, Rev. 103), dated June 16, 2014.
2. Tennessee Valley Authority letter to NRC, Watts Bar Nuclear Plant (WBN)

Units 1 and 2 - Response to Request for Additional Information on the Radiological Emergency Plan, dated August 29, 2014.

In Reference 1, the Nuclear Regulatory Commission (NRC) provided Requests for Additional Information (RAIs) for the Radiological Emergency Plan (REP) Revision 103. In Reference 2, the Tennessee Valley Authority (TVA) responded to NRCs RAIs and committed to submit dual-unit revisions for the generic part of the TVA REP (NP-REP) and Appendix C, the Watts Bar-specific part of the REP. In addition, TVA committed to provide a copy of the dual-unit on-shift staffing analysis that was performed in accordance with section IV.A.9 of Appendix E to Title 10 of the Code of Federal Regulations (10 CFR), Part 50.

The enclosures to this letter provide this information.

L44 140912 001

U.S. Nuclear Regulatory Commission Page 2 September 12, 2014 There are no regulatory commitments associated with this submittal. If you have any questions or comments, please contact Gordon Arent at (423) 365-2004.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 12th day of September 2014.

Respectfully,

Enclosures:

1. Radiological Emergency Plan (Generic Part), Revision 1 04X.
2. Radiological Emergency Plan Appendix C, Revision 1 04X.
3. Emergency Response Organization On-Shift Staffing Analysis Report, Revision 2 cc (Enclosures):

U.S. Nuclear Regulatory Commission, Region II NRC Resident Inspector-Watts Bar Nuclear Plant, Unit 1 NRC Resident Inspector-Watts Bar Nuclear Plant, Unit 2 NRR Project Manager-Watts Bar Nuclear Plant