CAC:MF9684
From kanterella
Jump to navigation
Jump to search
Request for: TSTF-542 - Reactor Pressure Vessel Water Inventory Control Approved, Closed | |
Initiation
Questions Answers | |
| From | |
MONTHYEARRS-17-017, License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations2017-05-0404 May 2017
[table view]Title: License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations Site: Clinton 05000461/LER-1917-002, Regarding Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition2017-05-0404 May 2017 Title: Regarding Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition Site: Clinton ML17156A5722017-06-0505 June 2017 Title: NRR E-mail Capture - Clinton Power Station - Acceptance Review for License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations Site: Clinton ML17324A3542018-01-22022 January 2018 Title: Issuance of Amendment Regarding Residual Heat Removal Subsystem Operability Requirements During Decay Heat Removal Operations (CAC No. MF9684; EPID L-2017-LLA-0225) Site: Clinton 2017-06-05 | |
Retrieved from "https://kanterella.com/w/index.php?title=CAC:MF9684&oldid=480370"