CAC:MF5026
From kanterella
(Redirected from CAC:MF5027)
Jump to navigation
Jump to search
CAC - MF5026, TSTF-37, TSTF-30, TSTF-45, TSTF-46, Clarify SR on Bypass of DG Automatic Trips, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil, Modify Section 3.8 Mode Restriction Notes, Allow Administrative Means of Position Verification for Locked or Sealed Valves, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration, Control Rod SCRAM Time Testing, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS, SFDP Clarifications, Add Met Vs. Perform to Specification 1.4, Frequency, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration, Determination of Cumulative and Projected Dose Contributions in Recp, Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions, Secondary Containment and Shield Building Boundary Integrity SRS, EFCV Completion Time to 72 Hours, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Removing Restart of Shutdown Clock for Increasing Suppression Pool Temperature, Clarify the Control Rod Block Instrumentation Required Action (Approved, Closed) 26 August 2016 - 21 June 2019 | |
---|---|
Request for: TSTF-400 - Clarify SR on Bypass of DG Automatic Trips, TSTF-374 - Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil, TSTF-283 - Modify Section 3.8 Mode Restriction Notes, TSTF-269 - Allow Administrative Means of Position Verification for Locked or Sealed Valves, TSTF-306 - Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration, TSTF-37 - TSTF-37, TSTF-30 - TSTF-30, TSTF-45 - TSTF-45, TSTF-46 - TSTF-46, TSTF-222 - Control Rod SCRAM Time Testing, TSTF-264 - 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS, TSTF-273 - SFDP Clarifications, TSTF-284 - Add Met Vs. Perform to Specification 1.4, Frequency, TSTF-295 - Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration, TSTF-308 - Determination of Cumulative and Projected Dose Contributions in Recp, TSTF-318 - Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions, TSTF-322 - Secondary Containment and Shield Building Boundary Integrity SRS, TSTF-323 - EFCV Completion Time to 72 Hours, TSTF-439 - Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, TSTF-458 - Removing Restart of Shutdown Clock for Increasing Suppression Pool Temperature, TSTF-464 - Clarify the Control Rod Block Instrumentation Required Action Approved, Closed | |
From | |
MONTHYEARNL-16-1571, Supplemental Response Regarding Request to Adopt TSTF-222, Control Rod Scram Times2016-08-26026 August 2016
[table view]Title: Supplemental Response Regarding Request to Adopt TSTF-222, Control Rod Scram Times Site: Hatch ML16231A0412016-09-29029 September 2016 Title: Issuance of Amendments Regarding Multiple Technical Specification Changes Site: Hatch ML19164A0172019-06-21021 June 2019 Title: Correction of Amendment No. 223 Multiple Technical Specification Changes (CAC Nos. MF5026 and MF5027) Site: Hatch 2016-09-29 |
Retrieved from "https://kanterella.com/w/index.php?title=CAC:MF5026&oldid=482431"