Pilgrim Nuclear Power Station Rocky Hill Road l
Plymouth, Massachusetts 02360 1
April 21, 1989 BECo Ltr.89-060 Ralph G. Bird Senior Vice President - Nuclear U.S. Nuclear Regulatory Commission License No:
DP~'.-3 5 Document Control Desk Docket No:
50-293 Washington, DC 20555
Subject:
Resumption of the Pilgrim Nuclear Power Station Power Ascension Program
Dear Sir:
This ' letter forwards a description of the process that will be i
followed to resume the Power Ascension Program.
The attached plan addresses the following questions:
1.
What corrective actions will be complete before restart?
(Section A) 2.
What is going to be done to assess the effectiveness of the short term actions and what are the longer term assessment actions after startup?
(Sections B & C) 3.
What review, evaluation and assessment will be performed to reassess readiness to proceed to 50% power?
(Sections C & D)
This plan utilizes the same methodology for resumption of the Power Accension Program as the existing program, namely a prerequisite list describing the actions required to be completed prior to reactor startup, the evolutions that will be completed prior to commencing the normal operations and observation period, and the evolutions to be completed prior to the assessment and recommendation to raise power to 50%,
Please contact me or R.A.
Ledgett, of my staff, if you have questions or need additional information concerning the Pilgrim Nuclear Power Station Power Ascension Program.
Attachments 8905010085 890421 I \\
PDR ADOCK 05000293 P
1 t
l U.S. Nuclear Regulatory Commission License No:
DPR-35 Page 2 Docket No:
50-293 i
l'.
cc:
Mr. William T. Russell Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr.
D.G. MacDonald, Project Manager Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
'U.S.
Nuclear Regulatory Commission Mail Stop:
14D1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Senior NRC Resident Inspector Pilgrim Nuclear Power Station l
- - - - - _ _ _ - _ _. _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.