BECO-87-108, Monthly Operating Rept for June 1987
| ML20235J366 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/30/1987 |
| From: | Bird R, Hamilton P BOSTON EDISON CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| BECO-87-108, NUDOCS 8707150518 | |
| Download: ML20235J366 (7) | |
Text
. - - - - - - -
f OPERATING DATA REPORT DOCKET NO.
50-293 l
DATE July 8, 1987 l
COMPLETED BY P. Hamilton i
TELEPHONE (617)746-7900 OPERATING STATRS l
Notes 1.
Unit Name Pilarim 1 2.
Reporting Period June 1987 3.
Licensed Thermal Power (MHt) 1998 4.
Nameplate Rating (Gross MWe) 678 5.
Design Electrical Rating (Net MHe) 655 6.
Maximum Dependable Capacity (Gross MWe) 690 l
7.
Maximum Dependable Capacity (Net MHe) 670 1
8.
If Changes Occur _ in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
l None 9.
Power Level To Which Restricted, If Any (Net MWe)
None l
- 10. Reasons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720.0 4343.0 127607.0 l
- 12. Number Of Hours Reactor Has Critical 0.0 0.0 79791.1 l
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 0.0 0.0 77229.3
)
i
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MHH) 0.0 0.0 134999880.0 l
- 17. Gross Electrical Energy Generated (MHH) 04 0.0 45444604.0
- 18. Net Electrical Energy Generated (MHH)
_LQ 0.0 43675429.0
- 19. Unit Service Factor 0.0 0.0 60.5 i
- 20. Unit Availability Factor 0.0 0.0 60.5_
l
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 51.1 l
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 52.3
- 23. Unit Forced Outage Rate Od 0.0 12.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown for Refuelina Outage Number 7 - Outage commenced on July 21 1986
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup -
Seotember. 1987
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) i B707150510 B707 yDR ADOCK 0500 93 4 (; %
/
mitaMLMzutJEMEUUtiGEULMW DOCKET NO.
50-293 UNZT Pilgrim 1 DATE July 8, 1987 COMPLETED ~BY P. Hamilton TELEPHONE (617)746-7900 HONTH June 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HHe-Net)
(HHe-Net) 1 0.
17 0.
2 0.
18-O.
3 0,
19
-O.
i 4
0.
20 0.
j 5
O.
21 0.
6 0.
22 0.
7 0.
23 0.
8 0.
24 0.
9 0.
25 0.
10 0.
26 0.
11 0.
27 0.
12 0.
28 0.
13 0.
29 0.
14 0.
30 0.
j 15 0.
31 N/A 16 0.
This format, lists the average daily unit power level in HWe-Net ~for each day in the reporting month, computed to the nearest whole megawatt.
1
CFJ@MJ LEM80FJ LGJFWN j
PILGRIM NUCLEAR P0HER STATION DOCKET NO. E0-293 Operational Summarv for June 1987
.i l
l 1
i The unit has been shutdown all month for Refueling Outage Number 7.
l t
i Safety Relief Valve Challenges Month of June 1987 Requirement:
NUREG-0737 T.A.P. II.K.3.3 I
There were no safety relief valve challenges during the month.
i c
l l
l
REFUELING INFORMATIQH l
The follouing refueling information is included in the Monthly Report as requested in an NRC letter to BECo, dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that, each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2.
Scheduled date for next Refueling Shutdown:
March 1989 3.
Scheduled date for restart following refueling: September 1987 4.
Due to their similarity, requests 4, 5, & 6 are responded to collectively under #6.
5.
See #6.
6.
The new fuel which will be loaded during the 1986/87 refueling outage is of the same design as loaded in the previous outage, and consists of 192 assemblies.
7.
(a)
There are 0 fuel assemblies in the core.
(b) There are 1808
- fuel assemblies in the spent fuel pool.
8.
(a) The station is presently licensed to store 2320 spent fuel assemblies.
The actual usable spent fuel storage capacity is 2320 fuel assemblies.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
9.
With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 512 fuel assemblies.
- Includes 100 new fuel assemblies to support current refuel outage.
u A
J ecna h
n t
N e
n O
t o
I n
M T
i CTE a
ANC M
EN EVE l
VER a
IRR m
TPU r
C C
o EOE N
RTR R
OC t
E l
C i
E N
u C
A b
N N
N e
O A
E r
I N
T T
E N
p A
T I
m T
N A
u S
I M
P A
R M
E W
D O
E P
TA R
L l
R E
a E
R n
L E
rs C
Y S
net U
T U
rt r N
E A
ona F
C Hip M
A I
S RG R
d L
O n
e I
J ay r
P A
t eu M
N yi c d O
t cne I
i aac T
l pl o C
ial r2 N
db ciP U
ea e
3 F
l rpvt L
iemrs5 A
apuue M_
F opst8 T
N E
H N
S O
S P
p M
" m O
Au C
" p M
E T
S H
Y S
S S
l
(
RP n7 O
E w
Y COC o
B TN d
E t
TO SIU SR TN EH UTC E
LP ACE KTEPE CAR CITML ONAOE DUDCT T
N E
N A
OS
/
PE N
)
OO 2
CC t2 r0 o1 p -
eG r
tRE M4 A
o e
R EE
/
ff etU TD N
H oh nN SO s
Se(
YC
&nn v
_ S S
o o yE e N
Fii r l
O ttt ei I
tcaneF
__ T 7
5 i urE s C
8 E
b ra n)
_ U 9
STT 4
i t paeR NNR A
h set cE
_ D 1
E EEO
/
xnraiL
_ R e
CVP N
EIPDL(
n IEE
_. R u
L R
E J
W m
d O
a a
P H
rm o
T cadL D
N 3
Sre N
O R
cud A
M O
l l Sne F
T aa i cr
_ S T
OGC uuot ue N
R NA nnt ndh W
O DIE 4
aauoet O
P OTR 3
MMACRO D
E HT
_ T R
TUN 1 23459
. U EHH
__ H MSO
__ S D
__ T I
r
_. N o
. U r
r B.
E 2
N n
r O
C i re S
meh A
d pt E
2 AOO R
FGH n
o no i
N t
i O) c t
tii RO 2
snm UH 7
et eia D(
rs R ax ue rE T
yT l
i gr e
I arnors E
Foit on P
S at e l
Y pt el ac T
i nuuri 2
uif gel qaeep 7
EMRRO&
8 E
/
ABCDE T
1 A
/
D 6
d ed ce rh oc FS O
1 N
0 1
FS
i
....c 1
siti BOSTON EMSON Executive Offices ROO BoylstM street Boston, hsachusetts 02199 Ralph G. Bird Senior Vice President. - Nuclear July' OS, 1987
-BECo Ltr. #87 108 U.S. ?!uclear Regulatory Commission q
Attention: Doctiment Control Desk-Washington, DC 20555 License No. DPR-35 Docket No. 50-293
Subject:
June 1987 Monthly Report 1
Dear Sir:
In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Staticn is attached for your information and planning. Should you have any questions'concerning-this report please contact me directly.
I PJH:la Attachment cc:
Regional Administrator, Region i U.S. Nuclear Regulatory Commission 631 Park Avenue R
King of Prussia, PA 19406 Dr. Martin McBride Mo
-