BECO-84-009, Monthly Operating Rept for Dec 1983

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1983
ML20079E808
Person / Time
Site: Pilgrim
Issue date: 12/31/1983
From: Hamilton P, Harrington W
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BECO-84-009, BECO-84-9, NUDOCS 8401170436
Download: ML20079E808 (7)


Text

+

AVERAGE DAILY UNIT POWER LEVEL 50-293 DOCKET NO.

UNIT Pilgrim 1 DATE Janurry 12, 1984 COMPLETED BY P. Hamilton TELEPHONE 617 - 746-7900 December, 1983 DAY AVERAGE DAILY POWER LEVEL DAY .VERAGE DAILY POWER LEVEL (MWe-Net) (gwe.3,gg 485 0 g

2 461 gg 0 3 416 39 0

. 4 418 20 0

397 0 5 3, 389 0-6 7 390 0 3

3 385 24 0

9 382 25 10 97 26 0

  • 0 0 11 27 0 0 12 33 0 0 13 29.

14 0 30 0 0 15 3, 16 0 INSTRUCTIONS On this formst, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megswatt.

(9/77) 8401170436 831231

~'

PDR ADOCK 05000293 R PDR j67r)tf ll

.y . - . . . . _ _ , , , . . - - . _ _ , . , . - , .

OPERATING DATA REPORT DOCKET NO.

DATE January 12. 1984 CO31PLETED BY P. Hamilton TELEPHONE (617) 746-7900 OPERATING ST3.TUS Notes PILGRIM 1

1. Unit Name:
2. Reporting Period: December,1983 1990
3. Licensed Thermal Power 131Wt):

678

4. Nameplate Rating IGross \. lwel:

655

5. Design Electrical Rating INet 31We):

690 l

6. Staximum Dependable Capacity (Gross alwe):

\

670  ;

7. Ataximum Dependable Capacity (Net .1We): 1 S. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons: 1 NONE
9. Power Level To which Restricted. If Any INet 31WeJ: NnNF
10. Reasons For Restrictions. If Any:

This 31onth Yr..to.Date Cumularive 744 876n.n 96960.0

11. Hours In Reporting Period 69746.3 224.5 7801.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 7654.8 67534.0 220.0
14. Hours Generator On.Line 0.0 0.0 0.0 ,
15. Unit Reserve Shutdown Hours 14219040.0 116932632.0
16. Gross Thermal Energy Generated (31WHi 291096.0 94500.0 /An1490_n to ? ?R11/1 n
17. Gross Electrical Energy Generated l31WHI 90126.0 4711898.0 176ot/mo n IS. Net Electrical Energy Generated (31WH) 87.4 69.7 29.6
19. Unit Service Factor 29.6 87.4 69.7
20. Unit Availability Factor 80.3 58.0 18.1
21. Unit Capacity Factor iUsing alDC Net) 18.5 82.1 59.4
22. Unit Capacity Factor (Using DER Net) 0.0 9.2 3.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 31onths IType. Date.and Duration of Eache:

Shutdown for refueling and recirculation pipe repair - commenced on December

10. 1983 (12/10/8'O.

August, 1984

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achiesed

26. Umts in Test Status aPrior io Commercial Operations:

INITIA L CRITICALITY INITIAL ELECTRICITY Cost \lERCI AL OPER \ TION g-i

s IMH'KEl NO. 50-293 llNil SiltillH)WNS ANI)I'OWER HI{DtICIIONS IJNil NAME Pilgrim 1 DAIE Januarv 12; 1984 I

RETOR T MONill DECEMBER, 1983 ("~((I[I

, ',i'l,8

,,, {517 6$900

- O C

, 3E 3 y E' 3 I icentce ,E +, ym, ('ause & ('inictiive N. . . D.ie r i 3g i jgy Event g,7 ay Argion in .

F

$E 5 3 ;?, =g Relient # in U u

!O l'acvent Reruerenic o

i 16 83/12/10 524.0 S C 1 N/A N/A N/A N/A - Shutdown for refueling and i recirculation pipe inspection J

1

}

I l

lyse .._ Kta2gn Method System 8 Component F-Forced A-Equip Failure F-Admin t-Manual Exhibit F t H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Er.try Sheet .

E-operator Training 5-Reduced Load Licensee Event Report .

& License Examination 9-Other (LER) File (HUREG-Ot61)

~!

REFUELING INFORMATION l

l The following ref.ueling information is included in the Monthly 18, 1978:

Report as requested in an NRC letter to BEco dated January For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

March, 1986

2. Scheduled date for next Refueling Shutdown:
3. Scheduled date for restart following refueling: August, 1984 4.
5. Due to their similarity, requests 4, 5, and 6 are responded to collectively:
6. The fuel, which had been loaded during the 1981 scheduled refuel-ing outage, is of the same P8X8R design, as loaded the previous outage consisting of 112 P8DRB282 assemblies and 60 P8DRB265 as-semblies.
7. (a) There are O fuel asaemblies in the core.

(b) There are 1708* fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9. With present spent and new fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 62 fuel assemblies.
  • Includes 192 new reload bundles to support current refuel outage.

. BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293

~~

Operational Summary for December, 1983 The month commenced with the unit at 77% power as limited by fuel de-pletion. On 12/2/83, the "B" train of feedwater heaters were bypassed and power was reduced to 67%. Two in series secondary containment damp -

ers were found inoperable on 12/5/83, and a plant shutdown was , initiated.

The dampers were immediately repaired, tested and the shutdown secured (Reference LER 83-062/03L-0). Steady state operation continued until 12/10/83, when the unit was removed from service for refueling and re-circulation pipe inspection.

Safety Relief Valve Challenges Month of December, 1983 Requirement: T.M.I. T.A.P. II.K.3.3 Reason: No safety / relief valve challenges occurred during the month of December, 1983.

PILCRIM NUCLEAR' POWER STATION Month DECEMBER.1983 1- .

MAJOR SAFETY RELATED MAINTENANCE l ,,

'r -

CORRECTIVE ACTION }

TO PREVENT RECURRENCE;., ASSOCIATED LER COMPONENT -MALFUNCTION CAUSE MAINTENANCE SYSTEM "ontrol Rod Control Rod Would not hold Leaking Replaced the- None: Routine Maintenance; 83-060/03L-0

.irives #10-11 pressure. accumulator valve cartridge. .

Accumulator gas chargin g

' valve seat -

(

$ ilVAC Temp. Switch Would not cali- Failure Replaced switch None: RoutineMaintenance)

D-46 for safe ~ brate. analysis and recalibrated , j I guards area being per- (

cpoler formed. ,

ilVAC Secondary Would not op- Misaligned Readjusted gears Initiatedengineeringrevifew 83-062/03L-0 Containment erate. or cracked for 94 & 95, re- of design. [' -

j Dampers drive gears , placed gear for ,

A0/N90, 94 & 90. 3 l -

95 . .

Rx Recire. Recirculation Indications of Intergranu- Plan to repair Replace with pipe having ! 83-063/0lT-0 cracks, lar Stress and/or replace, lower carbon content. ',

Piping j

^

i Corrosion f

Rx Shield Plugs Plugs in place Procedural ' Removed shield Procedure to be revised. ! 83-064/0lT-0 between sep- during' fuel move- inadequacy plugs. -

?,

arator pool ment contrary to  ;

I and Rx cavity requirements of j

?

Tech. Spec.

4

,i 1 .

Frozen Sens- Thaw sensing Engineering requested to l- LER to be written.

j Fire Elec. Fire Would not auto Protectior Pump start duri,ng testing Lines lines. provide permanent fix.

  • i

. ,3 -l' 2-I e

. i

. t

BOSTON EOisON COMPANY 800 BOYLSTON STREET BOUTON. MASEACHUBETTs 02199 WILLIAM O. HARRINGTON c.ez.............., January 12, 1984 M$7L.AF BECo Ltr. #84-009 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D C. 20555 Attention: Document Control Desk Docket No. 50-293 License DPR-35

Subject:

December, 1983 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

Respectfully submitted, William D. Harring WDH/ko ec: Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission Document Contrcl Desk Washington, D. C. 20555 Standard BECo Monthly Report Distribution 6+ 3

\

_ __ _ __