License Basis Document Change Request 2-1-02
ML031910436
Person / Time
Site: Millstone 
Issue date: 07/01/2003
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
B18931, TAC MB5008
Download: ML031910436 (4)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CTq 06385 TWa Dominion

LL-l W Docket No. 50-336 B18931 RE: 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit No. 2 Regulatory Commitment Related to License Basis Document Change Request 2-1-02 (TAO No. MB5008)

In a letter dated May 7, 2002, Dominion Nuclear Connecticut, Inc. (DNC) proposed changes to the Millstone Unit No. 2 (MP2) Technical Specifications which included changes to the control room isolation actuation function.(')

During Nuclear Regulatory Commission (NRC) review of that application, a question arose as to the level of redundancy for the function. DNC subsequently concluded that a second channel had been added in response to a Three Mile Island action Item (TMI ACTION ITEM ll.D.3.4),

however, reference to the second channel had not previously been incorporated into the MP2 Technical Specifications.

Upon discovery, DNC generated a Condition Report and established administrative controls to ensure both channels are appropriately maintained until a new license amendment request is submitted. This matter was discussed with the NRC staff and it was agreed that DNC would docket a commitment in this regard.

To that end, DNC hereby commits to submit a license amendment request to reflect two channels of control room isolation actuation instrumentation.

()J. A. Price letter to US NRC, "Millstone Nuclear Power Station, Unit No. 2 License Basis Document Change Request (LBDCR) 2-1-02 Limiting Safety System Settings and Instrumentation," dated May 7, 2002.

A

(.4-DDI

U.S. Nuclear Regulatory Commission B18931/Page 2 The regulatory commitment contained in this letter is located in Attachment 1.

If you should have any questions regarding this submittal, please contact Mr. Ravi Joshi at (860) 440-2080.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

J. i'art lrice SiteQMie President - Millstone Sworn to and subscribed before me this.. J day of (TJ I t1

,2003 d a Am

{

I 0M~~~~~~~~~~~WE1YE.

PH1LL1p0 Notary Public NOTARYPuBUC My Commission expires W,;Mls}la9 COMISSION DPIRES 1213112005 Attachment cc:

H. J. Miller, Region I Administrator R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 Millstone Senior Resident Inspector Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127

I:

I4 Docket No. 50-336 B18931 Millstone Power Station, Unit No. 2 List of Regulatory Commitments

U.S. Nuclear Regulatory Commission B18931/Attachment 1/Page 1 List of Regulatory Commitments The following table identifies action committed to by Dominion Nuclear Connecticut, Inc.

(DNC) in this document.

Number Commitment Due B18931-01 DNC hereby commits to submit a license July 31, 2004 amendment request to reflect two channels of control room isolation actuation instrumentation.