B18877, Withdrawal of Technical Specifications Changes

From kanterella
Jump to navigation Jump to search

Withdrawal of Technical Specifications Changes
ML031200530
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/17/2003
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
B18877, TAC MB0674
Download: ML031200530 (2)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 iwDominion' gPP 7 ?nrl?

Docket No. 50-245 B18877 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 RE: 10 CFR 50.90 Millstone Power Station, Unit No. 1 Withdrawal of Technical Specifications Changes (TAC No. MB0674)

In a letter dated December 5, 2000,(1) a -license amendment request was submitted that would have revised the Millstone Unit No. I Technical Specifications to be consistent with the proposed Improved Standard Technical Specifications applicable to permanently shutdown and defueled facilities.

Dominion Nuclear Connecticut, Inc.

(DNC) has reevaluated the proposed amendment request and has decided not to pursue the proposed amendment request.

Therefore, DNC hereby withdraws the proposed amendment request.

There are no regulatory commitments contained within this letter.

If you should have any questions on this submittal, please contact Mr. Ravi Joshi at (860) 440-2080.

Very truly yours, Subscribed and sworn to before me this Ni day of NAL, 2003.

Notary PuLor Date Commission Expires:

CoT cc:

See next page Fe JA Price

.0tvice President, Millstone fle A. Arzamarski Notary Public nmission Expires bruay 28, 2006 (1) F. C. Rothen letter to U.S. Nuclear Regulatory Commission, "Millstone Nuclear Power Station, Unit No. 1, Docket No. 50-245, Revision to Technical Specifications to Adopt the Proposed Improved Standard Technical Specifications for Permanently Shutdown and Defueled Facilities," dated December 5, 2000.

P",

0

U.S. Nuclear Regulatory Commission B18877/Page 2 cc:

H. J. Miller, Region 1 Administrator D. G. Holland, NRC Project Manager, Millstone Unit No. 1 Millstone Senior Resident Inspector Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127