B18576, Suitability, Training and Qualification Plan Revision 17

From kanterella
Jump to navigation Jump to search
Suitability, Training and Qualification Plan Revision 17
ML020590462
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/08/2002
From: Price J, Schwarz C
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
B18576
Download: ML020590462 (2)


Text

SDominion, Domi:!nn Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 FEB 8 2002 Docket Nos. 50-245 50-336 50-423 B18576 RE: 10 CFR 50.54(p)(2)

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit Nos. 1, 2 and 3 Suitability, Training and Qualification Plan, Revision 17 Pursuant to 10 CFR 50.54(p)(2), Dominion Nuclear Connecticut, Inc. (DNC) hereby submits Revision 17 to the Millstone Nuclear Power Station Suitability, Training and Qualification Plan (ST&Q). A description of the changes to the ST&Q is contained in. The revision to the ST&Q is provided as Enclosure 1.

The Millstone Nuclear Power Station Site Operations Review Committee has evaluated the revision pursuant to 10 CFR 50.54(p) and concurs that it does not decrease the effectiveness of the ST&Q.

Pursuant to 10 CFR 73.21(b), the ST&Q is considered safeguards information and, as such, DNC requests that Enclosure 1 be withheld from public disclosure pursuant to 10 CFR 2.790(d)(1). Upon separation of Enclosure 1 the remainder of this letter may be decontrolled.

There are no regulatory commitments contained within this letter.

SAFEGUARDS INFORMATION CONTAINED WITHIN Upon separation this page is decontrolled.

jf/i..U 1/4 SAFEGUARDS INFORMATION

U.S. Nuclear Regulatory Commission B18576/Page 2 If you have any questions concerning this submittal, please contact Mr. Paul Willoughby at (860) 447-1791, extension 3655.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

FOR: J. Alan Price Site Vice President - Millstone BY:

cwar irec Nuclear Station Operations and Maintenance ) Description of Changes to the Suitability, Training and Qualification Plan, Revision 17 )

Suitability, Training and Qualification Plan, Revision 17 cc:

H. J. Miller, Region I Administrator (2 copies) cc:

w/o Enclosure 1 J. B. Hickman, NRC Project Manager, Millstone Unit No. 1 T. J. Jackson, NRC Inspector, Region I, Millstone Unit No. 1 J. T. Harrison, NRC Project Manager, Millstone Unit No. 2 NRC Senior Resident Inspector, Millstone Unit No. 2 V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 NRC Senior Resident Inspector, Millstone Unit No. 3 SAFEGUARDS INFORMATION Upon separation this page is decontrolled.