Millstone Power Station Rope Ferry Road Waterford, CT 06385 SAFEGUARDS INFORMATION FEB 8 2002 Docket Nos. 50-245 50-336 50-423 B18575 RE: 10 CFR 50.54(p)(2)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit Nos. 1, 2 and 3 Safeguards Contingency Plan, Revision 5 Pursuant to 10 CFR 50.54(p)(2), Dominion Nuclear Connecticut, Inc. (DNC) hereby submits Revision 5 to the Millstone Nuclear Power Station Safeguards Contingency Plan (SCP). A description of the changes to the SCP is contained in Attachment 1.
The revision to the SCP is provided as Enclosure 1.
The Millstone Nuclear Power Station Site Operations Review Committee has evaluated the revision pursuant to 10 CFR 50.54(p) and concurs that it does not decrease the effectiveness of the SCP.
Pursuant to 10 CFR 73.21(b), the SCP is considered safeguards information and, as such, DNC requests that Enclosure 1 be withheld from public disclosure pursuant to 10 CFR 2.790(d)(1). Upon separation of Enclosure 1 the remainder of this letter may be decontrolled.
There are no regulatory commitments contained within this letter.
SAFEGUARDS INFORMATION CONTAINED WITHIN Upon separation this page is decontrolled.
<-*6
>1*
U.S. Nuclear Regulatory Commission B18575/Page 2 If you have any questions concerning this submittal, please contact Mr. Paul Willoughby at (860) 447-1791, extension 3655.
Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.
FOR: J. Alan Price Site Vice President - Millstone BY:
C&-CSchwarz, llrect0o" Nuclear Station Operations and Maintenance ) Description of Changes to the Safeguards Contingency Plan, Revision 5 )
Safeguards Contingency Plan, Revision 5 cc:
H. J. Miller, Region I Administrator (2 copies) cc:
w/o Enclosure 1 J. B. Hickman, NRC Project Manager, Millstone Unit No. 1 T. J. Jackson, NRC Inspector, Region I, Millstone Unit No. 1 J. T. Harrison, NRC Project Manager, Millstone Unit No. 2 NRC Senior Resident Inspector, Millstone Unit No. 2 V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 NRC Senior Resident Inspector, Millstone Unit No. 3 SAFEGUARDS INFORMATION Upon separation this page is decontrolled.