B16330, Forwards Rev 28 to Plant Physical Security Plan.Encl Withheld
| ML20137M756 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/27/1997 |
| From: | Rothen F NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| B16330, NUDOCS 9704080172 | |
| Download: ML20137M756 (2) | |
Text
%
hpe Fmy Rd. (Houte 15ti), Waterfiord. CT Ot>385 ggg
, Nucle,ar Energy stat., ion, % ci,arp..crs as.,o
%rthret Lclear Energy Company P.O. Bn 128 Waterford. CT Ofi.'W,-0128 (860) 447-1791 Faz (860) 444-4277 The %rtheast Untities System March 27,1997 Docket Nos. 50-245 50-336 50-423 B16330 Re: 10CFR50.54(p)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit Nos.1,2, and 3 Physical Security Plan. Revision 28 Pursuant to 10CFR50.54(p), Northeast Nuclear Energy Company (NNECO) hereby submits Revision 28 to the Millstone Station Physical Security Plan. An explanation of the changes is provided as Attachment 1. The revision to the plan is provided as.
The Millstone Nuclear Power Station Site Operations Review Committee has evaluated this revision pursuant to 10CFR50.54(p) and has determined that it does not decrease the effectiveness of the Physical Security Plan.
Pursuant to 10CFR73.21(b), the Physical Security Plan is considered safeguards information and, as such, NNECO requests that the attached changes be v sneld from public disclosure pursuant to 1.0CFR2.790(a).
If you have any additional questions concerning this submittal, please contact Mr.
Michael D. Ehredt at (860) 440-2142.
)
e 5.npupp.m.sp.g THS ATT4CHCQ.DCCUMENT CCNTAINS hE f.1EiGil.:Je.9 !2":ClillmON 970 W30172 970327 r
PDR 3
WHEN DETACHED, T-:!3 COVER SHEET 13 tict S45Ect>v03 r!mm'tJ:&1 oo m.s m.u os
- U.S. Nucirr Regulttory Commission B16330/Page 2
)
Very truly yours, l
NORTHEAST NUCLEAR ENERGY COMPANY i
F. C. Rothen Vice President -
1 Attachments cc:
Dr. W. D. Travers, Director, Special Projects Office H. J. Miller, Region i Administrator P. F. McKee, Deputy Director of Licensing, Special Projects Office i
W. D. Lanning, Deputy Director for inspections S. Dembek, NRC Project Manager, Millstone Unit No.1-D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 4
D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 l
4 l
1 4
1 dis ATTACHED DOCUMENT CCNTA!NS h E!EFSj.fARnS NORuAT30M WelEN O.ETACHEO, TMS COVER SHEET IS NOT SAFEGUARD 3 (MFORMATION l
1
- -,