B12970, Discusses Util Improved Program on High Radiation Areas
| ML20151M381 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 07/27/1988 |
| From: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| B12970, NUDOCS 8808050132 | |
| Download: ML20151M381 (2) | |
Text
'
EAST UTILITIES cenerai Ote:ces. seicen street, Ber;in, Connecticut 1
.w o muove"s a m,"
P.O. BOX 270 H ARTFORD. CONNECTICUT 06141-0270 k
L J CZ22,C, (203) 665-5000 July 27, 1988 Docket No. 50-213 B12970 Re.
10CFR20 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Reference:
(1)
E. J. Hroczka letter to Document Con'.rol Desk (NRC), dated April 22, 1988.
Gentlemen:
Haddam Neck Plant Hiah Radiation Areas The Haddam Neck Plant Technical Specifications require that areas where dose rates exceed 1000 mrem / hour be locked to prevent unauthorized entry. However, the Specification does not state whether the measurement should be taken on contact with the source or at a specific distance.
In the referenced letter, Northeast Nuclear Energy Company (NNECO) noteu that the Millstone Unit No. 3 Technical Specifications state that this 1000 mrem / hour measurement shall be taken at a distance of eighteen (18) inches from the radiation source.
In order to provide an improved and consistent program on high radiation areas within the Northeast Utilities system, Connecticut Yankee Atomic Power Company (CYAPC0) is applying the Millstone Unit No. 3 Technical Specification for an l
18-inch measurement distance at the Haddam Neck Plant.
This practice is not l
precluded by the Technical Specifications of the Haddam Neck Plant since the distance from the source of the "Greater than 1000 mrem / hour" reading is not specified.
This application will enhance the radiological control program at the Haddam Neck Plant by providing more appropriate controls for these areas.
In addition, it will provide uniformity for the determination of lockable hign radiation areas and eliminate confusion amongst personnel.
We have discussed this issue with the Senior Resident Inspector at the Haddam Neck Plant and he is in concurrence with our interpretation.
This approach will be implemented immediately.
Currently, a revision to the Haddam Neck Plant Technical Specifications is being processed with similar revisions for Hillstone Vait Nos. I atid 2 and will be submitted to you so that the Technical Specifications for all four Northeast Utilities nuclear plants will be consistent.
00 k 880005013g 990797 f
,9 DR ADOCK 05000213 PNU
rc U.S. Nuclear Regulaton Commission B12970/Page 2 July 27, 1988 Please feel free to contact ur if any questions arise on this matter.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY
/
E. JTMfoczRa~ ~ g7 Senior'Vice President cc:
W. T. Russell, Region I Administrator A. B. Wang, NRC Project Manager, Haddam Neck Plant J. T. Shediosky, Senior Resident Inspector, Haddam Neck Plant l