| Issue date | Site | Title | Topic |
---|
NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 4 December 2023 | Nine Mile Point | Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Nondestructive Examination VT-2 Intergranular Stress Corrosion Cracking Stress corrosion cracking Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
ML23325A160 | 17 November 2023 | Palo Verde | Supplemental Submittal - Relief Request 70 – Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle | Affidavit |
ML23299A305 | 26 October 2023 | Palo Verde | Response to Request for Additional Information – Relief Request 70 – Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle | Stress corrosion cracking |
ML23298A123 | 25 October 2023 | Palo Verde | NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle | Stress corrosion cracking |
ML23249A184 | 18 September 2023 | Beaver Valley | Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 | Liquid penetrant |
ML23156A682 | 22 June 2023 | Nine Mile Point | Authorization and Safety Evaluation of Alternative Relief Request I5R-11 | Weld Overlay Intergranular Stress Corrosion Cracking Stress corrosion cracking Dissimilar Metal Weld DM weld |
05000412/LER-2023-001, Indications Identified During Reactor Vessel Head Inspection | 16 June 2023 | Beaver Valley | Indications Identified During Reactor Vessel Head Inspection | Large early release frequency Stress corrosion cracking |
ML23129A312 | 9 May 2023 | Beaver Valley | NRR E-mail Capture - Beaver Valley Unit 2 - Verbal Authorization of Alternative Request, 2-TYP-4-RV-06 | Liquid penetrant |
ML23125A061 | 8 May 2023 | Quad Cities | Proposed Alternative to the Requirements of the ASME Code | Unidentified leakage |
ML23125A160 | 5 May 2023 | Beaver Valley | NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Liquid penetrant |
L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | 5 May 2023 | Beaver Valley | Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Stress corrosion cracking Liquid penetrant |
ML23125A146 | 5 May 2023 | Beaver Valley | NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Liquid penetrant |
ML23118A312 | 28 April 2023 | Quad Cities | Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell | Nondestructive Examination |
ML23118A165 | 28 April 2023 | Quad Cities | NRR E-mail Capture - Request for Additional Information Quad Cities, Unit 2, Alternative Request I6R-11 | Nondestructive Examination |
ML23118A381 | 28 April 2023 | Beaver Valley | 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Weld Overlay Coatings Nondestructive Examination Intergranular Stress Corrosion Cracking Liquid penetrant Dissimilar Metal Weld |
ML23114A378 | 24 April 2023 | Quad Cities | Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges | Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination Intergranular Stress Corrosion Cracking Dissimilar Metal Weld Unidentified leakage |
ML23090A130 | 31 March 2023 | Nine Mile Point | Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld | Weld Overlay Dissimilar Metal Weld DM weld |
NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 30 March 2023 | Nine Mile Point | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 29 March 2023 | Nine Mile Point | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 27 March 2023 | Nine Mile Point | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Stress corrosion cracking Dissimilar Metal Weld |
NMP1L3513, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 24 March 2023 | Nine Mile Point | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Coatings Nondestructive Examination VT-2 Intergranular Stress Corrosion Cracking Stress corrosion cracking Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
ML23088A217 | 31 December 2022 | Arkansas Nuclear | Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 | Boric Acid Nondestructive Examination Stress corrosion cracking Liquid penetrant |
ML22094A001 | 15 April 2022 | Dresden Peach Bottom Nine Mile Point Limerick Clinton Quad Cities FitzPatrick LaSalle | Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) | Nondestructive Examination VT-2 Incorporated by reference Intergranular Stress Corrosion Cracking Stress corrosion cracking Through-Wall Leakage |
ML22073A095 | 7 April 2022 | Arkansas Nuclear | Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPID L-2021-LLR-0084) (NON-PROPRIETARY) | Nondestructive Examination Finite Element Analysis Stress corrosion cracking Liquid penetrant |