| Issue date | Site | Title | Topic |
---|
2CAN112103, Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 | 5 November 2021 | Arkansas Nuclear | Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 | Boric Acid Nondestructive Examination Finite Element Analysis Stress corrosion cracking Liquid penetrant |
ML19156A178 | 31 March 2020 | | Rulemaking: Final Rule: Regulatory Analysis for the American Society of Mechanical Engineers Code Cases | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Through Wall Leak Through-Wall Leakage Dissimilar Metal Weld Backfit |
JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan | 17 December 2018 | FitzPatrick | Fifth Ten-Year Lnservice Inspection Interval Program Plan | Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Moisture barrier License Renewal EVT-1 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld Manual Operator Action Thermal fatigue |
RS-18-124, Relief Request Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | 4 October 2018 | Braidwood | Relief Request Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | Nondestructive Examination Finite Element Analysis Stress corrosion cracking License Renewal Liquid penetrant |
ML18099A054 | 31 August 2018 | | Rulemaking: Proposed Rule: Egulatory Analysis for American Society of Mechanical Engineers Code Cases, Rg 1.84, Rev 38; Rg 1.147, Rev 19; Rg 1.192, Rev 3; and Rg 1.193, Rev 6 | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing License Renewal Through-Wall Leak Dissimilar Metal Weld Backfit |
ML18099A051 | 26 July 2018 | | FRN: Proposed Rule: American Society of Mechanical Engineers Code Cases, Rg 1.84, Rev 38; Rg 1.147, Rev 19; Rg 1.192, Rev 3; and Rg 1.193, Rev 6 | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing License Renewal Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld Backfit |
ML17314A008 | 10 November 2017 | LaSalle | Submittal of Program Plan Associated with the Fourth Lnservice Inspection (ISI) Interval and the Third Containment Lnservice Inspection (Cisi) Interval | Non-Destructive Examination Weld Overlay Nondestructive Examination VT-2 Incorporated by reference High Energy Line Break Aging Management Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Integrated leak rate test License Renewal Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld Thermal fatigue |
RS-16-224, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | 8 November 2016 | Byron | Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval | Nondestructive Examination Finite Element Analysis Stress corrosion cracking License Renewal Liquid penetrant Exclusive Use Affidavit |
ML15259A049 | 11 September 2015 | Byron Braidwood | Units 1 and 2 - Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | Nondestructive Examination Finite Element Analysis Stress corrosion cracking License Renewal Liquid penetrant Affidavit |
RS-15-236, Braidwood Station, Units 1 and 2 & Byron Station, Units 1 and 2 - Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | 11 September 2015 | Byron Braidwood | Braidwood Station, Units 1 and 2 & Byron Station, Units 1 and 2 - Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | Nondestructive Examination Finite Element Analysis Stress corrosion cracking License Renewal Liquid penetrant Affidavit |
RA-14-105, Submittal of Fifth Ten-Year Interval Lnservice Inspection Program Plan | 11 December 2014 | Oyster Creek | Submittal of Fifth Ten-Year Interval Lnservice Inspection Program Plan | Weld Overlay Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Scram Discharge Volume Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing Operability Determination Moisture barrier License Renewal Dissimilar Metal Weld |
ML14014A268 | 28 February 2014 | Monticello | Staff Review and Evaluation of the Fifth 10-Year Interval Inservice Inspection Program Plan | Incorporated by reference High Energy Line Break Aging Management Flow Accelerated Corrosion License Renewal |
ML13052A373 | 15 March 2013 | Nine Mile Point | ME5789-Authorization of Relief Request 1ISI-004, Revision 1 (NMP1 Relief Request) | Weld Overlay Nondestructive Examination Incorporated by reference Finite Element Analysis Intergranular Stress Corrosion Cracking Stress corrosion cracking License Renewal Liquid penetrant Affidavit |
ML12326A467 | 16 November 2012 | Nine Mile Point Ginna | Verification of Information in Aging Management Technical Letter Report | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Weld Overlay Coatings VT-2 High Energy Line Break Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing Moisture barrier License Renewal Subsequent License Renewal Earthquake Biofouling EVT-1 Through-Wall Leak Through-Wall Leakage Preliminary White Finding Fire Protection Program Dissimilar Metal Weld Power Uprate Thermography Thermal fatigue |
ML12312A255 | 31 October 2012 | Nine Mile Point | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Request for Additional Information | Non-Destructive Examination Weld Overlay Nondestructive Examination Intergranular Stress Corrosion Cracking Stress corrosion cracking License Renewal Affidavit |
ML12277A090 | 12 October 2012 | Nine Mile Point Ginna | Technical Letter Report on Aging Management Program Audits at Ginna and Nine Mile Point 1 | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Weld Overlay Coatings VT-2 High Energy Line Break Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Eddy Current Testing Moisture barrier License Renewal Subsequent License Renewal Earthquake Biofouling EVT-1 Through-Wall Leak Through-Wall Leakage Preliminary White Finding Fire Protection Program Dissimilar Metal Weld Power Uprate Thermography Thermal fatigue |
RS-12-150, Fifth Interval Inservice Inspection Program Plan and Relief Requests | 28 September 2012 | Quad Cities | Fifth Interval Inservice Inspection Program Plan and Relief Requests | Safe Shutdown Non-Destructive Examination Mission time Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Moisture barrier License Renewal EVT-1 Dissimilar Metal Weld Power Uprate Thermal fatigue |
RS-12-151, Fifth Interval Lnservice Inspection Program Plan and Relief Requests | 28 September 2012 | Dresden | Fifth Interval Lnservice Inspection Program Plan and Relief Requests | Safe Shutdown Non-Destructive Examination Mission time Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Aging Management Flow Accelerated Corrosion Scram Discharge Volume Intergranular Stress Corrosion Cracking Stress corrosion cracking Moisture barrier License Renewal EVT-1 Dissimilar Metal Weld Power Uprate Thermal fatigue |
ML12250A806 | 13 September 2012 | Nine Mile Point | Request for Additional Information (RAI) Request No. 1lSl-004, Request to Utilize an Alternative for the Repair of Control Rod Drive Housing Penetrations | Weld Overlay Nondestructive Examination License Renewal |
ML12160A349 | 7 June 2012 | Nine Mile Point | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Withdrawal of the Portion of the Request Regarding Rotary Peening | Intergranular Stress Corrosion Cracking License Renewal |
ML12102A112 | 9 April 2012 | Nine Mile Point | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Follow-up Request for Additional Information | Non-Destructive Examination Weld Overlay Nondestructive Examination Incorporated by reference Feedwater Heater Intergranular Stress Corrosion Cracking Stress corrosion cracking License Renewal Liquid penetrant Through-Wall Leak Dissimilar Metal Weld Exclusive Use Affidavit Thermal fatigue |
ML12048A836 | 23 February 2012 | Nine Mile Point | Request for Additional Information Relief Request No. 1ISI-004 | Non-Destructive Examination License Renewal |
ML11279A037 | 29 September 2011 | Nine Mile Point | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Request for Additional Information | Non-Destructive Examination Coatings Incorporated by reference License Renewal Liquid penetrant |
ML112220093 | 11 August 2011 | Nine Mile Point | Request for Additional Information Request for Alternative Relief Request No. 1ISI-004 | License Renewal |
ML110950307 | 25 March 2011 | Nine Mile Point | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations for the Remainder of the License Renewal Period of Extended Operation | Weld Overlay Nondestructive Examination Intergranular Stress Corrosion Cracking Stress corrosion cracking License Renewal Liquid penetrant Operability Assessment Affidavit |
ML110680291 | 4 March 2011 | Nine Mile Point | Request to Utilize an Alternative to the Requirements of 10CFR50.55a(g) for Repair of Control Rod Drive Housing Penetrations for the Remainder of License Renewal Period of Extended Operation | Weld Overlay Nondestructive Examination Intergranular Stress Corrosion Cracking Stress corrosion cracking License Renewal Liquid penetrant Operability Assessment Affidavit |
ML11269A018 | 12 October 2010 | Clinton | ISI Program Plan Third Ten-Year Inspection Interval | Non-Destructive Examination Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference High Energy Line Break B.5.b Flow Accelerated Corrosion Scram Discharge Volume Intergranular Stress Corrosion Cracking Stress corrosion cracking Dissimilar Metal Weld DM weld Thermography Thermal fatigue |
ML090860860 | 16 March 2009 | Nine Mile Point | Submittal of American Society of Mechanical Engineers (ASME) Code, Section XI, Inservice Inspection Program for the Fourth Ten-Year Inservice Inspection Interval and Associated 10 CFR 50.55a Requests | Non-Destructive Examination Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference High Energy Line Break Aging Management Flow Accelerated Corrosion Scram Discharge Volume Intergranular Stress Corrosion Cracking Large early release frequency Stress corrosion cracking License Renewal Liquid penetrant Through-Wall Leak Through Wall Leak Dissimilar Metal Weld Thermal fatigue Water hammer |
RA-07-079, Submittal of Program Plan Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inspection (Cisi) Interval | 12 September 2007 | LaSalle | Submittal of Program Plan Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inspection (Cisi) Interval | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference High Energy Line Break Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Thermography Thermal fatigue |
ML070800741 | 6 March 2007 | Limerick | Submittal of Third Inservice Inspection (ISI) Interval Program Plan | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference High Energy Line Break Flow Accelerated Corrosion Stress corrosion cracking Backfit Thermography Thermal fatigue |
ML060110119 | 5 January 2006 | Nine Mile Point | 1/5/06 - Audit and Review Report for Plant Aging Management Reviews and Programs, Nine Mile Point Nuclear Station, Units 1 and 2, Docket Nos: 50-220 and 50-410, January 5, 2006 | Ultimate heat sink Fire Barrier Weld Overlay Hydrostatic Coatings Nondestructive Examination Zebra Mussel Aging Management Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Integrated leak rate test Eddy Current Testing Moisture barrier License Renewal Control of Heavy Loads Biofouling EVT-1 Liquid penetrant Through-Wall Leak Fire Protection Program Dissimilar Metal Weld Grace period Flow Induced Vibration Thermography Thermal fatigue |
ML050940259 | 4 April 2005 | | Evaluation of Code Cases in Supplement 12 to the 1998 Edition and Supplement 1 Through Supplement 6 to the 2001 Edition | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Stress corrosion cracking Exemption Request |
CNRO-2004-00006, Arkansas, Unit 1 - Request for Alternatives ANO1-R&R-005 and ANO1-R&R-006, Proposed Alternatives to ASME Weld Repair and Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles | 23 February 2004 | Arkansas Nuclear | Arkansas, Unit 1 - Request for Alternatives ANO1-R&R-005 and ANO1-R&R-006, Proposed Alternatives to ASME Weld Repair and Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles | Nondestructive Examination Incorporated by reference Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
CNRO-2003-00022, Relief, Proposed Alternatives to Requirements for Repairs Penetration Nozzles ASME Weld Repair and Examination Performed on Reactor Vessel Head | 6 June 2003 | Arkansas Nuclear | Relief, Proposed Alternatives to Requirements for Repairs Penetration Nozzles ASME Weld Repair and Examination Performed on Reactor Vessel Head | Nondestructive Examination Incorporated by reference Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
CNRO-2002-00052, Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations | 28 October 2002 | Arkansas Nuclear | Proposed Alternative to ASME Examination Requirements for Repairs Performed on Reactor Vessel Head Penetrations | Nondestructive Examination Incorporated by reference Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
NL-02-125, Response to Questions Regarding Relief Requests to Use an Alternative to Temper Bead Welding Requirements for Contingency Repairs on Reactor Vessel Head Penetration Nozzles | 26 September 2002 | Indian Point | Response to Questions Regarding Relief Requests to Use an Alternative to Temper Bead Welding Requirements for Contingency Repairs on Reactor Vessel Head Penetration Nozzles | Nondestructive Examination Liquid penetrant |
CNRO-2002-00048, Arkansas Units 1 & 2, Waterford Unit 3 Proposed Alternatives to ASME Requirements for Weld Repairs | 23 September 2002 | Arkansas Nuclear Waterford | Arkansas Units 1 & 2, Waterford Unit 3 Proposed Alternatives to ASME Requirements for Weld Repairs | Nondestructive Examination Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML022540329 | 5 September 2002 | Oconee | Request for Alternates to ASME XI Per 10 CFR 50.55a (a)(3)(ii) Relief Requests 02-07, Revision 0, and 02-06, Revision 0 | Nondestructive Examination Incorporated by reference Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML021060137 | 3 April 2002 | Oconee | Request for Alternates to ASME XI Per 10 CFR 50.55a (a)(3) - Relief Requests 02-02, Revision 0, and 02-03, Revision 0 | Nondestructive Examination Incorporated by reference Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML020170042 | 11 January 2002 | Davis Besse | Request for Relief from ASME Boiler and Pressure Code Inservice Inspection Requirements at the Davis-Besse Nuclear Power Station, Third Ten-Year Interval (RR-A20 and RR-A21) | Non-Destructive Examination Hydrostatic Nondestructive Examination Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |