| Issue date | Site | Title | Topic |
---|
ML091310666 | 28 April 2009 | Millstone | Third 10-year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief Requests | Boric Acid High Radiation Area Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination VT-2 Stress corrosion cracking Eddy Current Testing Operability Determination Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld DM weld Scaffolding Core Exit Thermocouple Weak link Thermal fatigue |
ML20216J434 | 24 September 1999 | Millstone | Mnps Unit 3 ISI Summary Rept,Cycle 6 | Hydrostatic VT-2 Liquid penetrant |
ML18016B013 | 9 July 1999 | Harris | Proposed Tech Specs,Relocating 3/4.3.3.3,3/43.3.4,3/4.3.3.9 & 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis, IAW GL 95-10 | Safe Shutdown Boric Acid High winds Non-Destructive Examination Grab sample Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Exemption Request Earthquake Power-Operated Valves Backfit Control Room Habitability |
ML20205P234 | 1 May 1999 | North Anna | Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 | Boric Acid Time of Discovery High Radiation Area Hydrostatic Nondestructive Examination VT-2 Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld Scaffolding Unidentified leakage Unidentified leak Eddy Current Test |
ML20206D176 | 27 April 1999 | Millstone | Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval | Non-Destructive Examination Hydrostatic Nondestructive Examination Temporary Modification VT-2 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld Scaffolding |
ML20195G679 | 12 November 1998 | North Anna | Requests Rev to Previously Approved Relief from ASME Section Xi,Paragraph IWA-5250 to Permit Performance of Code Repair in Fourteen Days After Discovery in Place of Structural Analysis | Nondestructive Examination Through-Wall Leak Through Wall Leak Through-Wall Leakage |
ML20248C869 | 29 May 1998 | North Anna | Forwards SER Accepting 980325 & 0512 Ltrs Requesting Permission to Use Code Case N-535 in North Anna ASME Section XI Inservice Insp Program,Pursuant to 10CFR50.55(a)(3)(i) | |
ML20248C883 | 29 May 1998 | North Anna | SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program | Incorporated by reference |
ML20247G158 | 12 May 1998 | North Anna | Requests Relief to Use Code Case N-535, Alternative Requirements for ISI Intervals, for Unit 2 as Identified in Oct 1997 Submittal.Unit 1 Second Interval Will End on 990430 & Unit 2 Second Interval Will End on 001214 | |
ML20206N858 | 30 April 1998 | North Anna | Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 | Hydrostatic Nondestructive Examination VT-2 Dissimilar Metal Weld Scaffolding Grace period Unidentified leakage |
ML20217K793 | 24 April 1998 | Brunswick | Discusses CP&L 971117 Request for Approval to Implement Alternative Rules of ASME Section XI Code Case N-535. Forwards Safety Evaluation Supporting Proposed Use of Code Case N-535 | |
ML20217K846 | 24 April 1998 | Brunswick | Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 | Incorporated by reference |
ML20217H306 | 16 April 1998 | Brunswick | Rev 0 to ISI Program for Class 1,2 & 3 Components & Supports | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking Dissimilar Metal Weld Scaffolding |
ML20217E930 | 25 March 1998 | North Anna | Requests Permission to Utilize Code Case N-535 in ASME Section XI ISI Program,Per 10CFR50.55a(a)(3).Code Case N-535 Interprets Interval Insp Scheduling Requirements | |
ML18022B035 | 26 January 1998 | Harris | Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 High Energy Line Break Eddy Current Testing Liquid penetrant Dissimilar Metal Weld Thermal fatigue Water hammer |
BSEP-97-0459, Requests Approval to Use Alternative Requirements for ISI Delineated in ASME Section XI Code Case N-535.Alternative Is Needed to Extend Third Period of Second ten-yr ISI Interval to Coincide W/End of Bsep,Unit 1,refueling Outage 11 | 17 November 1997 | Brunswick | Requests Approval to Use Alternative Requirements for ISI Delineated in ASME Section XI Code Case N-535.Alternative Is Needed to Extend Third Period of Second ten-yr ISI Interval to Coincide W/End of Bsep,Unit 1,refueling Outage 11 | Incorporated by reference |
B16672, Provides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in Ltr | 28 August 1997 | Millstone | Provides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in Ltr | Safe Shutdown Hydrostatic Nondestructive Examination VT-2 Scaffolding |
ML20140F474 | 30 April 1997 | North Anna | Forwards Safety Evaluation Accepting Licensee 951207 Proposed Alternative in Request for Relief SPT-16 Re Unit 2 Second 10-yr Interval Inservice Insp Program | |
ML20140F481 | 30 April 1997 | North Anna | Safety Evaluation Accepting Licensee 951207 Proposed Alternative in Request for Relief SPT-16 Re Second 10-yr Interval Inservice Insp Program for Unit 2 | Hydrostatic Incorporated by reference Through-Wall Leak |
ML20134G656 | 6 February 1997 | North Anna | Forwards Addl Info Re Second Interval ISI Program ASME Relief Request | Hydrostatic |
ML20133M274 | 15 January 1997 | Duane Arnold | Forwards SE for Third 10-year Interval Inservice Insp Program Plan & Associated Relief Requests for Duane Arnold Energy Ctr | |
ML20133M292 | 15 January 1997 | Duane Arnold | Safety Evaluation of Third Ten Year Interval Inservice Insp Program Plan Request to Use Code N-535 Ies Utilities Inc, Central Iowa Power Cooperative,Corn Belt Power Cooperative, Duane Arnold Energy Center | Incorporated by reference |
NG-96-2341, Withdraws Relief Requests NDE-R024,NDE-R025 & NDE-R026 for DAEC Third 10-yr Interval Inservice Insp Program | 31 October 1996 | Duane Arnold | Withdraws Relief Requests NDE-R024,NDE-R025 & NDE-R026 for DAEC Third 10-yr Interval Inservice Insp Program | |
NG-96-1807, Responds to RAI on Third 10-yr Interval ISI Program Plan & Associated Requests for Relief | 30 September 1996 | Duane Arnold | Responds to RAI on Third 10-yr Interval ISI Program Plan & Associated Requests for Relief | Safe Shutdown Hydrostatic VT-2 Scram Discharge Volume Intergranular Stress Corrosion Cracking Thermal fatigue Water hammer |
ML20117K879 | 10 June 1996 | North Anna | Submits Addl Info for Second Interval ISI Programs Re SPT-16 for Unit 2 | Hydrostatic |
ML20108B617 | 26 April 1996 | Duane Arnold | Forwards Rev 0 to Third Ten-Yr Insp Interval ISI Plan for DAEC Palo,Ia. Util Request Approval of Relief Requests & Plan by 961010 | Hydrostatic VT-2 Thermal fatigue |
ML20108B627 | 15 March 1996 | Duane Arnold | Rev 0 to Third Ten-Yr Insp Interval ISI Plan for DAEC Palo, Ia | Safe Shutdown Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Intergranular Stress Corrosion Cracking Stress corrosion cracking Earthquake Commercial Grade Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Thermal fatigue |
ML20095B946 | 7 December 1995 | North Anna | Requests Use of ASME Section XI Code Cases N-522 & N-535 for Third Interval ISI Programs | |
ML18153A546 | 7 December 1995 | Surry | Requests Use of ASME Section XI Code Cases N-522 & N-535 for Third Interval ISI Programs | |
ML20129H004 | 13 October 1995 | Duane Arnold | Weld Ref Sys | Hydrostatic VT-2 Pressure Boundary Leakage Thermal fatigue |
ML18151A210 | 31 July 1994 | Surry | ISI Program,Interval 3,931014-031013, Rev 1 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leak Through-Wall Leakage Unidentified leakage Thermal fatigue |
ML18151A245 | 31 July 1994 | Surry | ISI Program,Interval 3,940510-040509, for Surry Power Station,Unit 2,rev 1 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld Scaffolding Unidentified leakage Thermal fatigue |