Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes
ML19246A095
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/29/2019
From: Scarpello M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2019-43
Download: ML19246A095 (9)


Text

a,.

INDIANA MICHIGAN POWER A unit of American Electric Power August 29, 2019 Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 ANNUAL REPORT OF LOSS-OF-COOLANT ACCIDENT EVALUATION MODEL CHANGES Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 lndianaMichiganPower.com AEP-NRC-2019-43 10 CFR 50.46 Pursuant to 10 CFR 50.46, Indiana Michigan Power Company (l&M), the licensee for Don*ald C. Cook Nuclear Plant (CNP), is transmitting an annual report of loss-of-coolant accident (LOCA) evaluation model changes affecting the peak cladding temperature (PCT) for CNP Units 1 and 2. l&M is providing, as Enclosure 1, to this letter, the Units 1 and 2 Large Break and Small Break LOCA Analyses-of-Record PCT values and error assessments for calendar year 2018.

There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.

~;~f Michael K. Scarpello Regulatory Affairs Director BMC/mll

Enclosure:

Donald C. Cook Nuclear Plant Units 1 and 2, Large and Small Break Loss-of-Coolant Accident Peak Clad Temperature Summary c:

R. J. Ancona - MPSC R. F. Kuntz, NRG, Washington, D.C.

EGLE - RMD/RPS NRG Resident Inspector D.. J. Roberts, NRG Region Ill A. J. Williamson - AEP Ft. Wayne, w/o enclosures

Abbreviations:

10 CFR ADAMS CNP OF ECCS EM FdH FQ HHSI l&M LB LOCA MWt NOP/NOT NRC PCT RHR SGTP SB TCD Summary:

ENCLOSURE TO AEP-NRC-2019-43 DONALD G. COOK NUCLEAR PLANT UNITS 1 AND 2 LARGE AND SMALL BREAK LOSS-OF-COOLANT ACCIDENT PEAK CLAD TEMPERATURE

SUMMARY

Title 10 of the Code of Federal Regulations Agencywide Documents Access and Management System Donald C. Cook Nuclear Plant degrees Fahrenheit emergency core cooling system evaluation methodology nuclear enthalpy rise hot channel factor heat flux hot channel factor high head safety injection (Safety Injection System at CNP)

Indiana Michigan Power Company large break loss of coolant accident megawatts - thermal normal operating pressure/normal operating temperature Nuclear Regulatory Commission peak cladding temperature residual heat removal steam generator tube plugging small break thermal conductivity degradation By letter dated March 19, 2012, (ADAMS Accession No. ML12088A104), and supplemented by letter dated June 11, 2012, (ADAMS Accession No. ML12173A025), l&M, the licensee for CNP Units 1 and 2, submitted a report describing the impact of fuel pellet TCD on the LB LOCA ECCS evaluation model, and an estimate of the effect on the predicted PCT for CNP Units 1 and 2. This report was submitted pursuant to 10 CFR Part 50, Section 50.46, Paragraph (a)(3), and referred to a letter from Westinghouse Electric Company dated March 7, 2012 (ADAMS Accession No. ML12072A035). The report was subsequently found to be acceptable by NRC letter dated March 7, 2013 (ADAMS Accession No. ML13077A137).

By Westinghouse letter LTR-LIS-13-360, "D. C. Cook Units 1 and 2 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," dated July 31, 2013, Westinghouse Electric Company notified l&M of significant errors in the EM for the LB LOCA analysis of record for CNP Unit 1.

In a subsequent letter, LTR-LIS-13-406, "Additional Information on the Evaluation of Revised Heat Transfer Multiplier Distributions," dated August 14, 2013, Westinghouse Electric Company provided l&M additional detail on the nature of the errors and the corrections made.

Enclosure to AEP-NRC-2019-43 Page 2 Pursuant to 10 CFR Part 50, Section 50.46, Paragraph (a)(3), by letter dated August 30, 2013, l&M submitted a report to the NRG describing the impact of Revised Heat Transfer Multiplier Distributions on the predicted PCT for CNP Unit 1 (ADAMS Accession No. ML13247A174). As documented in the subsequent rack-up sheets, the error results in a benefit to the calculated PCT.

By Westinghouse letter LTR-LIS-14-44, "D. C. Cook Units 1 and 2 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," dated January 29, 2014, Westinghouse Electric Company notified l&M of significant errors in the EM for the LB LOCA analysis of record for CNP Unit 1.

Pursuant to 10 CFR Part 50, Section 50.46, Paragraph (a)(3), by letter dated February 27, 2014, l&M submitted a report to the NRG describing the impact of an Error in Burst Strain Application on the predicted PCT for CNP Unit 1 (ADAMS Accession No. ML14063A043).

By letter dated May 20, 2016 (ADAMS Accession No. ML16145A291), l&M submitted a report of significant changes to the EGGS EM as a result of CNP Unit 1 returning to NOP/NOT. This report was submitted pursuant to 10 CFR Part 50, Section 50.46.

By letter dated May 4, 2018 (ADAMS Accession No.ML18130A580), l&M submitted a report of a significant change in calculated PCT for the CNP Unit 2 Small Break LOCA analysis as a result of the reactor vessel upflow conversion modification. This report was submitted pursuant to 10 CFR Part 50, Section 50.46 within 30-days of reactor start-up.

The following pages summarize the impact of TCD, peaking factor burndown, heat transfer multiplier distribution revisions, error in burst strain application, decay group uncertainty factors errors, changes to grid blockage ratio and porosity (Unit 2 only), and plant modification evaluations on the CNP Units 1 and 2 LB LOCA analyses of record. Pages are included that also summarize the SB LOCA PCT analyses of record for CNP Units 1 and 2. In addition, the impact on the SB and LB LOCA PCT analyses of record from the upflow conversion in Unit 2 is addressed.

Enclosure to AEP-NRC-2019-43 CNP UNIT 1 LOCA Peak Clad Temperature Summary for ASTRUM Best Estimate Large Break Applicable to U1 C28 Evaluation Model: ASTRUM (2004)

Fo= 2.15 FdH = 1.55 SGTP = 10%

Break Size: Split Analysis Date: November 20, 2007 Notes: Post-Analysis evaluation for FQ of 2.09 and FdH of 1.53 LICENSING BASIS Analysis-of-Record MARGIN ALLOCATIONS (Delta PCT)

A.

PREVIOUS 10 CFR 50.46 ASSESSMENTS B.

C.

D.

1. Return to NOP/NOT Including Pellet Thermal Conductivity Degradation and Peaking Factor Burndown
2. Revised Heat Transfer Multiplier Distributions for NOP/NOT Conditions
3. Error in Burst Strain Application
4. Decay Group Uncertainty Factors Errors PLANNED PLANT MODIFICATION EVALUATIONS
1. Design Input Changes with Respect to Plant Operation for Return to NOP/NOT Evaluation NEW 10 CFR 50.46 ASSESSMENTS OTHER LICENSING BASIS PCT+ MARGIN ALLOCATIONS Notes:

PCT= 2128°F 404°F(a)

-91°F 85°F

-29°F

-489°F(a) 0°F 0°F PCT= 2008°F Page 3

a. These assessments are coupled via an evaluation of burnup effects which include thermal conductivity degradation, peaking factor burndown and design input changes.

Enclosure to AEP-NRC-2019-43 CNP UNIT 1 LOCA Peak Clad Temperature Summary for Appendix K Small Break Applicable to U1 C28 Evaluation Model:

NOTRUMP Fa=2.32 FdH=1.55 SGTP=10%

3.25 inch cold leg break Analysis Date: January 6, 2012 Notes: 3304 MWt (plus 0.34% calorimetric uncertainty)

LICENSING BASIS Analysis-of-Record PCT= 1725°F MARGIN ALLOCATIONS (Delta PCT)

A.

PREVIOUS 10 CFR 50.46 ASSESSMENTS 0°F B.

PLANNED PLANT MODIFICATION EVALUATIONS 0°F C.

NEW 10 CFR 50.46 ASSESSMENTS 0°F D.

OTHER 0°F LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 1725°F Page4

Enclosure to AEP-NRC-2019-43 CNP UNIT2 LOCA Peak Clad Temperature Summary for ASTRUM Best Estimate Large Break Applicable to U2C23 Evaluation Model: ASTRUM (2004)

Fa= 2.335 FdH = 1.644 SGTP = 10%

Analysis Date: February 9, 2009 Break Size: Split Notes: Post-Analysis evaluation of 1.5% SGTP and FdH of 1.61 LICENSING BASIS Analysis-of-Record MARGIN ALLOCATIONS (Delta PCT)

A.

B.

C.

D.

PREVIOUS 10 CFR 50.46 ASSESSMENTS

1. Evaluation of TCD and Peaking Factor Burndown
2. Changes to Grid Blockage Ratio and Porosity
3. Revised Heat Transfer Multiplier Distributions
4. Error in Burst Strain Application PLANNED PLANT MODIFICATION EVALUATIONS
1. Plant Evaluations associated with TCD
2. Evaluation of 12 Stainless Steel Filler Rods in 2 Reconstituted Fuel Assemblies NEW 10 CFR 50.46 ASSESSMENTS OTHER LICENSING BASIS PCT+ MARGIN ALLOCATIONS Notes:

PCT= 2107°F 73°F(a) 16°F

-3°F 13°F

-239°F(a) 1°F(b) 0°F PCT= 1968°F Page 5

a. These assessments are coupled via an evaluation of burnup effects which include thermal conductivity degradation, peaking factor burndown and design input changes.
b. This PCT impact is only applicable to the Unit 2 Cycle 23, which began December 2016 and ended in March 2018.

Enclosure to AEP-NRC-2019-43 CNP UNIT 2 LOCA Peak Clad Temperature Summary for ASTRUM Best Estimate Large Break Applicable to U2C24 Evaluation Model: ASTRUM (2004)

Fa= 2.335 FdH = 1.644 SGTP = 10%

Analysis Date: February 9, 2009 Break Size: Split Notes: Post-Analysis evaluation of 1.5% SGTP and FdH of 1.61 LICENSING BASIS Analysis-of-Record MARGIN ALLOCATIONS (Delta PCT)

A B.

C.

D.

PREVIOUS 10 CFR 50.46 ASSESSMENTS

1. Evaluation of TCD and Peaking Factor Burndown
2. Changes to Grid Blockage Ratio and Porosity
3. Revised Heat Transfer Multiplier Distributions
4. Error in Burst Strain Application PLANNED PLANT MODIFICATION EVALUATIONS 1. Plant Evaluations associated with TCD
2. Upflow Conversion NEW 10 CFR 50.46 ASSESSMENTS OTHER LICENSING BASIS PCT+ MARGIN ALLOCATIONS Notes:

PCT= 2107°F 73°F(a) 16°F

-3°F 13°F

-239°F(a) 37°F 0°F 0°F PCT= 2004°F Page6

a. These assessments are coupled via an evaluation of burnup effects which include thermal conductivity degradation, peaking factor burndown and design input changes.

Enclosure to AEP-NRC-2019-43 CNP UNIT 2 LOCA Peak Clad Temperature Summary for Appendix K Small Break Applicable to U2C23 Evaluation Model: NOTRUMP Fa= 2.32 FdH = 1.62 SGTP = 10% 4 inch cold leg break Analysis Date: April 25, 2011 Page?

Notes: The 3600 MWt power level used in this analysis bounds the Unit 2 3468 MWt steady state power limit in the operating license.

LICENSING BASIS Analysis-of-Record PCT= 1274°F (a)

MARGIN ALLOCATIONS (Delta PCT)

A.

PREVIOUS 10 CFR 50.46 ASSESSMENTS 0°F B.

PLANNED PLANT MODIFICATION EVALUATIONS 0°F C.

NEW 10 CFR 50.46 ASSESSMENTS 0°F D.

OTHER 0°F LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 1274°F Notes:

a. Analysis models RHR injection flow diversion to RHR spray and HHSI cross-tie valves open during cold leg recirculation.

Enclosure to AEP-NRC-2019-43

. CNP UNIT2 LOCA Peak Clad Temperature Summary for Appendix K Small Break Applicable to U2C24 Evaluation Model: NOTRUMP Fa= 2.32 FdH = 1.62 SGTP = 10% 4 inch cold leg break Analysis Date: April 25, 2011 Page 8 Notes: The 3600 MWt power level used in this analysis bounds the Unit 2 3468 MWt steady state power limit in the operating license.

LICENSING BASIS Analysis-of-Record PCT= 1274°F (a)

MARGIN ALLOCATIONS (Delta PCT)

A.

PREVIOUS 10 CFR 50.46 ASSESSMENTS 0°F B.

PLANNED PLANT MODIFICATION EVALUATIONS

1. Upflow Conversion 75°F C.

NEW 10 CFR 50.46 ASSESSMENTS 0°F D.

OTHER 0°F LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 1349°F Notes: