AEP-NRC-2016-73, Submittal of Annual Report of Loss-of-Coolant Accident Evaluation Model Changes

From kanterella
Jump to navigation Jump to search
Submittal of Annual Report of Loss-of-Coolant Accident Evaluation Model Changes
ML16243A462
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/26/2016
From: Scarpello M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2016-73
Download: ML16243A462 (7)


Text

m INOIANA Indiana Michigan Power MICHIGAN* Cook Nuclear Plant POWER One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com August 26, 2016 AEP-NRC-2016-73 10 CFR 50.46 Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 ANNUAL REPORT OF LOSS-OF-COOLANT ACCIDENT EVALUATION MODEL CHANGES Pursuant to 10 CFR 50.46, Indiana Michigan Power Company (l&M), the licensee for Donald C. Cook Nuclear Plant (CNP), is transmitting an. annual report of loss-of-coolant accident (LOCA) evaluation model changes affecting the peak cladding temperature (PCT) for CNP Unit 1 and Unit 2. l&M is providing, as an enclosure to this letter, the Unit 1 and Unit 2 Large Break and Small Break LOCA Analyses-of-Record PCT values and error assessments for calendar year 2015.

There are no new or revised commitments in this letter. Should you have any questions, please contact me at (269) 466-2649.

Sincer~<;1

~~K.Sc;ef Regulatory Affairs Manager JMT/mll

Enclosure:

. Donald C. Cook Nuclear Plant Units 1 and 2, Large and Small Break Loss-of-Coolant

  • Accident Peak Clad Temperature Summary c: R. J. Ancona - MPSC A W. Dietrich, NRC Washington, D.C.

MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosures

ENCLOSURE TO AEP-NRC-2016-73 DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 LARGE AND SMALL BREAK LOSS-OF-COOLANT ACCIDENT PEAK CLAD TEMPERATURE

SUMMARY

Abbreviations:

ADAMS Agencywide Documents Access and Management System CNP Donald C. Cook Nuclear Plant OF Degrees Fahrenheit ECCS Emergency Core. Cooling System EM Evaluation Model FdH Nuclear Enthalpy Rise Hot Channel Factor FQ Heat Flux Hot Channel Factor HHSI High Head Safety Injection (Safety Injection System at CNP) l&M Indiana Michigan Power Company LB Large Break LOCA Loss of Coolant Accident MWt Megawatts - thermal NRC Nuclear Regulatory Commission PCT Peak Cladding Temperature RHR Residual Heat Removal SB Small Break SGTP Steam Generator Tube Plugging 10 CFR Title 10 of the Code of Federal Regulations TCD Thermal Conductivity Degradation Summary:

By letter dated March 19, 2012, (ADAMS Accession No. ML12088A104), and supplemented by letter dated June 11, 2012, (ADAMS Accession No. ML12173A025), l&M, the licensee for CNP Units 1 and 2, submitted a report describing the impact of fuel pellet TCD on the LB LOCA ECCS evaluation model, and an estimate of the effect on the predicted PCT for CNP Units 1 and 2. This report was submitted pursuant to 10 CFR Part 50, Section 50.46, Paragraph (a)(3),

and referred to a letter from Westinghouse Electric Company dated March 7, 2012, (ADAMS Accession No. ML12072A035). The report was subsequently found to be acceptable by NRC letter dated March 7, 2013, (ADAMS Accession No. ML13077A137).

By letter dated August 30, 2013, (ADAMS Accession No. ML13247A174), l&M, submitted a report describing the impact of Revised Heat Transfer Multiplier Distributions on the predicted PCT for CNP Unit 1. This report was submitted pursuant to 10 CFR Part 50, Section 50.46, Paragraph (a)(3). By Westinghouse letter LTR-LIS-13-360, "D. C. Cook Units 1 and 2 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," dated July 31, 2013, Westinghouse Electric Company notified l&M, of significant errors in the EM for the LB LOCA analysis of record for CNP Unit 1. By Westinghouse letter LTR-LIS-13-406, "Additional Information on the Evaluation of Revised Heat Transfer Multiplier Distributions," dated August 14, 2013, Westinghouse Electric Company provided l&M additional detail on the nature

Enclosure to AEP-NRC-2016-73 of the errors and the corrections made. As documented in the subsequent rack-up sheets the error results in a benefit to the calculated PCT.

By letter dated February 27, 2014, (ADAMS Accession No. ML14063A043}, l&M, submitted a report describing the impact of an Error in Burst Strain Application on the predicted PCT for CNP Unit 1. This report was submitted pursuant to 10 CFR Part 50, Section 50.46, Paragraph

  • (a)(3). By Westinghouse letter LTR-LIS-14-44, "D. C. Cook Units 1 and 2 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," dated January 29, 2014, Westinghouse Electric Company notified l&M, of significant errors in the EM for the LB LOCA analysis of record for CNP Unit 1.

The following pages summarize the impact of TCD, peaking factor burndown, heat transfer multiplier distribution revisions, error in burst strain application, decay group uncertainty factors errors, changes to grid blockage ratio and porosity (Unit 2 only), and plant modification evaluations on the CNP Units 1 and 2 LB LOCA analyses of record for the calendar year 2015.

In addition, pages are included that summarize the SB LOCA PCT analyses of record for CNP Units 1 and 2.

    • ~

Enclosure to AEP-NRC-2016-73 CNP UNIT 1 LOCA Peak Clad Temperature Summary for ASTRUM Best Estimate Large Break Evaluation Model: ASTRUM (2004)

Fa= 2.15 FdH = 1.55 SGTP = 10%ca.) Break Size: Split Analysis Date: November 20, 2007 LICENSING BASIS Analysis-of-Record PCT= 2128°F MARGIN ALLOCATIONS (Delta PCT}

A. PREVIOUS 10 CFR 50.46 ASSESSMENTS

1. Evaluation of TCD and Peaking Factor Burndown 384°F(a)
2. Revised Heat Transfer Multiplier Distributions -55°F
3. Error in Burst Strain Application 85°F
4. Decay Group Uncertainty Factors Errors -29°F B. PLANNED PLANT MODIFICATION EVALUATIONS
1. Plant Evaluations associated with TCD -381°F(a)

C. NEW 10 CFR 50.46 ASSESSMENTS

1. None 0°F.

D. OTHER 0°F LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 2132°F Notes:

a. These assessments are coupled via an evaluation of burnup effects which include thermal conductivity degradation, peaking factor burndown and design input changes (e.g., reduction in the maximum allowed steam generator tube plugging from 10% to 2.5% and maximum FdH reduced to 1.545).

Enclosure to AEP-NRC-2016-73 CNP UNIT 1 LOCA Peak Clad Temperature Summary for Appendix K Small Break Evaluation Model: NOTRUMP Fa=2.32 FdH=1.55 SGTP=10% 3.25 inch cold leg break Analysis Date: January 6, 2012 Notes: 3304 MWt (plus 0.34% calorimetric uncertainty)

LICENSING BASIS Analysis-of-Record PCT= 1725°F MARGIN ALLOCATIONS (Delta PCT)

A. PREVIOUS 10 CFR 50.46 ASSESSMENTS

1. None B. PLANNED PLANT MODIFICATION EVALUATIONS C. NEW 10 CFR 50.46 ASSESSMENTS D. OTHER LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 1725°F

Enclosure to AEP-NRC-2016-73 CNP UNIT2 LOCA Peak Clad Temperature Summary for ASTRUM Best Estimate Large Break Evaluation Model: ASTRUM (2004)

Fa= 2.335 FdH = 1.644 SGTP = 103<a.) Break Size: Split Analysis Date: February 9, 2009 LICENSING BASIS Analysis-of-Record PCT= 2107°F MARGIN ALLOCATIONS (Delta PCT)

A. PREVIOUS 10 CFR 50.46 ASSESSMENTS

1. Evaluation of TCD and Peaking Factor Burndown 73°F(a)
2. Changes to Grid Blockage Ratio and Porosity 16°F
3. Revised Heat Transfer Multiplier Distributions -3°F
4. Error in Burst Strain Application 13°F B. PLANNED PLANT MODIFICATION EVALUATIONS
1. Plant Evaluations associated with TCD -239°F(a)

C. NEW 10 CFR 50.46 ASSESSMENTS

1. None 0°F D. OTHER 0°F LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 1967°F Notes:
a. These assessments are coupled via an evaluation of burnup effects which include thermal conductivity degradation, peaking factor burndown and design input changes (e.g., reduction in the maximum allowed steam generator tube plugging from 10% to 1%

and maximum FdH reduced to 1.61).

Enclosure to AEP-NRC-2016-73 CNP UNIT2 LOCA Peak Clad Temperature Summary for Appendix K Small Break Evaluation Model: NOTRUMP Fa=-2.32 FdH = 1.62 SGTP = 10% 4 inch cold leg break Analysis Date: April 25, 2011 Notes: 3600 MWt LICENSING BASIS Analysis-of-Record PCT= 1274°F (a)

MARGIN ALLOCATIONS (Delta PCT)

A. PREVIOUS 10 CFR 50.46 ASSESSMENTS

1. None 0°F B. PLANNED PLANT MODIFICATION EVALUATIONS 0°F C. NEW 10 CFR 50.46 ASSESSMENTS 0°F D. OTHER 0°F LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 1274°F Notes:
a. The 3600 MWt power level used in this analysis bounds the Unit 2 3468 MWt steady state power limit in the operating license.