AEP-NRC-2013-90, 2013 Steam Generator Tube Inspection Report
| ML13317A074 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/11/2013 |
| From: | Gebbie J American Electric Power, Indiana Michigan Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| AEP-NRC-2013-90 | |
| Download: ML13317A074 (76) | |
Text
INDIANA MICHIGAN POWERO A unit of American Electric Power Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 Indiana Michigan Power.com November 11, 2013 AEP-NRC-2013-90 10 CFR 50.4 Docket No.:
50-315 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 1 2013 STEAM GENERATOR TUBE INSPECTION REPORT Technical Specification (TS) 5.6.7 of Appendix A, to the Donald C. Cook Nuclear Plant (CNP) Unit 1 Operating License requires a report to be submitted within 180 days after initial entry into Mode 4 following the completion of an inspection performed in accordance with TS 5.5.7, Steam Generator (SG) Program. CNP Unit 1 entered Mode 4 on May 15, 2013. This report.details specific attributes of the inspection in accordance with TS 5.6.7.
Consistent with these requirements, Indiana Michigan Power Company, the licensee for CNP Unit 1, is submitting the Unit 1 2013 SG Tube Inspection Report as an enclosure to this letter.
There are no new regulatory commitments made in this submittal. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely, Joel P. Gebbie Site Vice President TLC/amp
Enclosure:
Unit 1 2013 Steam Generator Tube Inspection Report c:
J.T. King - MPSC S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson - NRC Region III T. J. Wengert - NRC Washington DC
,INUC) ý
ýAAL
Page 1 Enclosure to AEP-NRC-2013-90 Unit 1 2013 Steam Generator Tube Inspection Report Introduction In April of 2013, steam generator (SG) inservice inspections were conducted at the Donald C. Cook Nuclear Plant (CNP) Unit 1. Mode 4 was entered on May 15, 2013, and in accordance with the 180-day reporting requirements of Technical Specification (TS) 5.6.7, the results of the inspection are provided herein.
Unit 1 SG Description The four replacement Babcock & Wilcox model 51R SGs were initially placed in service in December of 2000.
Each of the replacement SGs contains 3496 thermally treated alloy 690 tubes with an outside diameter of 0.875 inches and a nominal wall thickness of 0.049 inches. The tubes are arranged in a triangular pitch pattern of 85 rows and 107 columns.
The tube support structure consists of eight stainless steel (SA-240-410S-modified) lattice grid assemblies and four sets of fan bar (also called flat bar) restraints. Each lattice grid consists of interlocking high and low bars that form a lattice pattern to provide lateral restraint in the straight portion of the tubes. The fan bar restraints are made of the same stainless steel material and offer support in the U-bend area.
The tubesheet is a nominal 21.25 inches thick and is made of ASME SA-508 Class 3a low alloy steel forging material with Alloy 82 cladding on the primary side. All tubes are hydraulically expanded into the tubesheet holes and flush seal welded at the primary face. The expansion includes the entire depth of the tubesheet for both the hot and cold leg sides.
The Unit 1 SGs have accumulated 116.86 effective full power months of operation since being placed in service and 102.30 effective full power months of operation in the first sequential inspection period as defined in the TS 5.5.7.d.2. The SGs operated 16.67 effective full power months since they were all last inspected.
The next planned inspection of these SGs will occur at the end of the current cycle (Fall 2014).
Enclosure to AEP-NRC-2013-90 Page 2 A.
The scope of inspections performed on each SG Primary Side Eddy Current Inspection Scope A 100% bobbin coil probe examination, encompassing the full tube length of all in-service tubes, was completed in all four SGs.
A 20% (nominal) array probe hot and cold leg top of tubesheet examination, extending from the tube end to the first support, was performed in all four SGs.
Special interest +PointTM probe examinations were performed in each SG.
These inspections included:
Historical and new dings/dents > 2 volts Historical and new bobbin wear indications > 20%
)
Select historical bobbin wear indications < 20%
)
Historical and new possible loose part indications and bounding tubes
)
All indication codes (i.e., I-codes)
)
All proximity indications
)
Any bulge indications - none reported
)
Any lack of expansion indications (no hydraulic expansion [NHE]) - none reported
)
Any permeability indications (permeability variation [PVN]) - none reported The following table provides the applicable tube or locations counts for the above inspections:
EDDY CURRENT EXAMINATION SUMMMARY Scope Probe SG 11 SG 12 SG 13 SG 14 Tube Tube Tube Tube Count Count Count Count Full Length Bobbin 3486 3495 3473 3488 Hot Leg Top of Tubesheet Array 741 760*
752*
742 Cold Leg Top of Tubesheet Array 741 743*
736*
742 n rloticoia ieg aeita in examination counts in SG -L ana -,3 is aue to adnering numoer of historical possible loose part/bounding locations that were included in these examination populations.
Special Interest SG 11 SG 12 SG 13 SG 14 Special Interest Probe SG 11 Locations Examined SG 12 Locations Examined SG 13 Locations Examined SG 14 Locations Examined Historical Possible Loose Part
+PointTM 8
28 71 and Bounding Tubes
____8_8_1_
New Possible Loose Parts and
+PointTM 69 25 159 20 Bounding Tubes Hot Leg Indications
+PointTM 6
7 17 10 Cold Leg Indications
+PointTM 6
11 19 5
U-bend Indications
+PointTM 77 52 29 38
Enclosure to AEP-NRC-2013-90 Page 3 In addition to the tubing examinations, the following SG inspection related activities were also performed:
Visual Plug Examination - 100% of the installed tube plugs were inspected using a remote camera to confirm plug location and condition. No abnormal conditions were identified during this examination.
Visual Channel Head Examination - Remote visual inspections were performed in each of the hot and cold leg channel heads to monitor the integrity of the divider plate and divider plate attachment welds, tubesheet/bowl cladding and the nozzle dam rings. No abnormal conditions were identified during this examination.
Secondary Side Inspections/Foreign Object Search and Retrieval Visual inspections were completed on each SG at the top of the tubesheet.
Areas examined included the divider lane (i.e., no-tube lane) and bundle annulus.
No abnormal conditions were identified.
In addition, foreign object search and retrieval efforts were employed to remove as many objects from the SGs as possible.
Where foreign objects could not be removed and there was a potential for wear, the tubes were plugged or stabilized/plugged, depending on the flow region and wear risk.
B.
Degradation mechanisms found The only degradation mechanism detected during the inspection was wear. The source of the degradation was support structures (fan bars and lattice grids) and a foreign object.
The table below summarizes the number of wear indications recorded in each SG during the inspection for the various mechanisms. The specific indications and their associated percent throughwall (% TW) depths are discussed in Section D of this report.
INDICATION COUNT Wear Mechanism SG 11 SG 12 SG 13 SG 14 Totals Fan Bar 659 480 429 794 2,362 Lattice Grid 15 20 24 18 77 Foreiqn Obiect 0
0 1
0 1
Enclosure to AEP-NRC-2013-90 Page 4 Fan Bar Wear The number of new fan bar wear indications showed a significant decrease over the previous examination. During the previous (2011) examination, a total of 2,013 fan bar wear indications were reported. During the follow-up 2013 inspection, a total of 453 new fan bar wear indications were reported. Taking into account the new indications and that some of the 2011 indications were previously removed from service, the overall inservice population for fan bar indication among the four SGs is 2,362.
The maximum depth of fan bar wear reported was 32% TW. The following table summarizes the fan bar wear depths recorded.
FAN BAR WEAR No. of Tubes/No. of Indications Depth SG 11 SG 12 SG 13 SG 14
<20% TW 218/599 157/438 179/408 293/767
>20% TW 37/60 23/42 13/21 20/27 Growth rates were essentially the same for all four generators with a maximum growth rate of 7.92% TW/effective full power year (EFPY).
The maximum average growth rate was 2.19%
TW/EFPY. The largest upper 95% growth rate among the four SGs was 5.76% TW/EFPY.
None of the fan bar indications exceeded the TS plugging limit or the condition monitoring limit.
No tubes were plugged for fan bar wear.
Lattice Grid Wear Lattice grid wear showed a slight increase in the number of indications from the previous inspection.
The 2011 examination reported 33 lattice grid wear indications, of which 32 remained in service. During the 2013 inspection, an additional 45 lattice grid wear indications were reported.
The maximum depth of lattice grid wear was 18% TW. The following table summarizes the lattice grid wear depths recorded:
LATTICE GRID WEAR No. of Tubes/ No. of Indications
Enclosure to AEP-NRC-2013-90 Page 5 For the population of lattice grid wear indications, the maximum growth was 1.44% TW/EFPY and the maximum average growth rate was 0.24% TW/EFPY. The largest upper 95% growth rate was 1.44% TW/EFPY.
None of the lattice grid indications exceeded the TS plugging limit or the condition monitoring limit. No tubes were plugged for lattice grid wear.
Foreigqn Object Wear One indication of foreign object related wear was detected during the inspection. SG 13 had probable foreign object wear within the second hot leg support (02H) lattice intersection with tube R31/C37. The wear indication was sized at 5% TW.
This indication did not exceed the TS plugging limit or condition monitoring limit. This tube was plugged and stabilized as the object could not be removed and continued wear was considered likely.
Enclosure to AEP-NRC-2013-90 Page 6 C.
Nondestructive examination techniques utilized for each degradation mechanism The table below summarizes the nondestructive examination techniques for each degradation mechanism, potential degradation mechanism and also those degradation mechanisms judged as improbable (i.e., outside diameter stress corrosion cracking [ODSCC],
primary water stress corrosion cracking [PWSCC]):
SUMMARY
OF INSPECTION TECHNIQUES Bobbin 96004.1 (R13)
Wear at Tube Supports, Anti-Vibration Bars, Vertical and Diagonal Straps Freespan Volumetric Wear Bobbin/Differential Mix Amplitude Analysi Detection Sizing for service for wear at lattice grids or fan bars Tube Wear at Lattice
+PointTa/Differential Mix Amplitude Grids/Fan Bars (confirm not Analysis
+Point'm 10908.4 (RI)
Detection of Anti-Vibration crack-like)
Detection Bar Wear Indications
- Foreign part wear with part Sizing for information present Single Frequency Amplitude Analysis
+PointM 21998.1 (R4)
Volumetric Indications N/A Detection Sizing for information
+Point'a 27901.1 -
Volumetric Indication of Single Frequency Amplitude Analysis 27907.1 Various Geometries Sizing for service (R1) 21409.1 (R7)
Axial ODSCC at Tube Axial ODSCC in the
+PointTM Single Frequency Phase
+PointTM 128425 (R3)
Support Plates, Freespan, presence of Fan Bars, Analysis 128432 (R2)
Sludge Pile, Tubesheet Lattice Grid Supports Detection Crevice Sizing for information Circumferential ODSCC in
+PointTM Single Frequency Phase
+PointTM Circumferential ODSCC at Expanded Tubesheet, Analysis 21410.1 (R6)
Expansion Transitions Sludge Pile, Lattice Grids, Detection Fan Bars, U-bends &
Sizing for information
____________________Denting
Enclosure to AEP-NRC-2013-90 Page 7
+PointTM 20510.1 (R7)
Circumferential PWSCC at Expansion Transitions N/A
+Point'. Single FreqL Analysis Detection Sizing for information
+PointTM Single Frequency Phase
+PointTm 20511.1 (R8)
Axial PWSCC at N/A Analysis Expansion Transitions Detection Sizing for information X-Probe 20402.1 (R5)
Axial ODSCC at Supports N/A Detection Axial ODSCC at Freespan X-Probe 20403.1 (R5) not Associated with N/A Detection Deposits Circumferential ODSCC at Foreign object wear X-Probe 20400.1 (R5) the top of tubesheet and detection Detection expansion transitions X-Probe 20500.1 (R4)
Circumferential PWSCC N/A Detection
_-Probe_
20500.1 (R4) at expansion transitions N/ADetection Axial PWSCC at X-Probe 20501.1 (R4) expansion transitions N/A Detection Axial PWSCC at supports X-Probe 20502.1 (R4) with dents no greater than N/A Detection 2 volts EPRI - Electric Power Research Institute ETSS - Examination Technique Specification Sheet
Enclosure to AEP-NRC-2013-90 Page 8 D.
Location, orientation (if linear), and measured sizes (if available) of service induced indications Please refer to the following attachments for the inspection records of service induced indications arising from tube support structures. : SG 11 Fan Bar/Lattice Grid Wear Percent Throughwall Indications : SG 12 Fan Bar/Lattice Grid Wear Percent Throughwall Indications : SG 13 Fan Bar/Lattice Grid Wear Percent Throughwall Indications : SG 14 Fan Bar/Lattice Grid Wear Percent Throughwall Indications Foreign object wear was reported in SG 13 only and affected a single tube. The sizing information related to that indication is provided below:
SG 13 FOREIGN OBJECT SIZING SGI13 31 1
37 1
0.26
- 0. 24 5%
E.
Number of tubes plugged during the inspection outage for each degradation mechanism During the inspection, a total of ten tubes were plugged, five of which were also stabilized. The table below provides the distribution of the tubes removed from service during the 2013 inspection based on the associated damage mechanism. "Foreign Object Bounding" refers to tubes administratively removed from service to ensure continued tube integrity due to the nearby presence of a non-retrievable foreign object(s).
TUBES PLUGGED BY DEGRADATION MECHANISM
Enclosure to AEP-NRC-2013-90 Page 9 Stabilization was performed on select tubes based upon the assessed wear risk presented from non-retrievable objects. The following table provides details on the specific tubes removed from service:
TUBES REMOVED FROM SERVICE 13 31 37 5% max depth foreign object wear at the 2 nd hot leg support - foreign object could not be removed (plugged and stabilized) 13 55 15 Bounding foreign object which could not be removed (plugged/stabilized) 13 54 16 Bounding foreign object which could not be removed (plugged/stabilized) 13 56 16 Bounding foreign object which could not be removed (plugged/stabilized) 13 55 17 Bounding foreign object which could not be removed (plugged/stabilized) 13 12 40 Bounding foreign object which could not be removed (plugged) 13 11 41 Bounding foreign object which could not be removed (plugged) 13 13 41 Bounding foreign object which could not be removed (plugged) 13 10 42 Bounding foreign object which could not be removed (plugged) 13 12 42 Bounding foreign object which could not be removed (plugged)
F.
The number and percentage of tubes plugged to date, and the effective plugging percentage in each SG The following table identifies the current total number and the percentage of tubes plugged for each SG:
Total 13,984 52 0.372
Enclosure to AEP-NRC-2013-90 Page 10 G.
The results of condition monitoring, including the results of tube pulls and in-situ testing Evaluation of the indications found during the 2013 inspection indicated that the condition monitoring requirements for structural and leakage integrity, as specified in Unit 1 TS 5.5.7, were satisfied.
Degradation specific condition monitoring limits were applied to each degradation mode.
degradation exceeded the TS plugging limit of 40% TW or the condition monitoring limits.
No AVERAGE DEPTH FAN BAR WEAR CONDITION MONITORING LIMIT Fan Bar Condition Monitoring Limit 96004.1 100 90 80 70
~60
£50 40 30 20 10 0
0 0.5 1.5 2
2.5 3
3.5 4
Inches AVERAGE DEPTH LATTICE GRID WEAR CONDITION MONITORING LIMIT
-C C
100 90 80 70 60 50 40 30 20 10 0
Lattice Grid Condition Monitoring Limit 96004.1 IX I,
. {
L iA 0
(Q5 1
L5 2
Inches 2.5 3
&5 4
Enclosure to AEP-NRC-2013-90 Page 11 FOREIGN OBJECT CONDITION MONITORING LIMIT Foreign Object Wear Condition Monitoring Limit 10908.4 100 90 80 70
~60 50 40O 30 20 10 0
0 0.5 1
1.5 2
2.5 3
3.5 4
Inches No detectable primary-to-secondary leakage was detected during the postulated to occur during the current operating interval.
previous cycle or is The inspection found no indications that met the criteria for in-situ pressure testing and no tube pulls were performed.
Attachment I to Enclosure to AEP-NRC-2013-90 Unit 1 2013 Steam Generator Tube Inspection Report SG 11 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/15/13 11:53:37 Customer Name: DC COOK Unit 1 Component: S/G 11 Page 1 of 16 TWD Indications QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 1
73 0.13 118 P2 TWD 6 FB5
+1.21 08C TEH LOCOK LAR 36 HOT 720CL BOBBIN 1
77 0.13 75 P2 TWD 6 08H
+0.54 08C TEH LAR 36 HOT 720CL BOBBIN 1
89 0.09 86 P2 TWD 4 07C
-1.50 TEC TEH LAR 27 HOT 720CL BOBBIN 1
99 0.10 103 P2 TWD 5 08C
+0.73 TEC TEH LAR 27 HOT 720CL BOBBIN 2
70 0.10 90 P2 TWD 4 07C
-1.49 08C TEC LAR 6
COLD 720UL BOBBIN 3
33 0.15 113 P2 TWO 7 OSC
+1.27 08C TEC LAR 7
COLD 720CL BOBBIN 3
51 0.16 107 P2 TWD 7 06C
-1.62 08C TEC LAR 7
COLD 720CL BOBBIN 3
79 0.20 74 P2 TWD 9 05C
-1.62 08C TEC LAR 7
COLD 720CL BOBBIN 13 31 0.09 110 P2 TWD 4 06N
+0.56 TEC TEN LAR 33 NOT 720CL BOBBIN 29 49 0.13 93 P2 TWD 6 07N
+0.53 TEC TEN LAR 15 NOT 720UL BOBBIN 32 24 0.14 91 P2 TWD 5 03H
+0.55 TEC TEH LAR 20 HOT 720UL BOBBIN 34 36 0.46 122 P2 TWO 18 04N
-1.45 TEC TEN LAR 17 NOT 720UL BOBBIN 34 48 0.09 92 P2 TWD 4 03H
-1.09 TEC TEH LAR 15 HOT 720UL BOBBIN 38 54 0.10 67 P2 TWD 4 FB4
+0.00 TEC TEN 9
NOT 720UL BOBBIN 41 17 0.16 130 P2 TWD 7 03H
+47.84 TEC TEH LAR 22 HOT 720UL BOBBIN 41 45 0.13 89 P2 TWO 6 FB4
-1.09 TEC TEN 17 NOT 720UL BOBBIN 42 10 0.27 132 P2 TWD 10 03H
-1.70 TEC TEH LAR 21 HOT 720UL BOBBIN 43 17 0.19 130 P2 TWD 8 04H
-1.68 TEC TEH LAR 21 HOT 720UL BOBBIN 44 50 0.08 143 P2 TWD 3 FB3
+1.60 TEC TEH 15 HOT 720UL BOBBIN 45 63 0.14 134 P2 TWD 6 FB4
-1.22 TEC TEH 15 HOT 720UL BOBBIN 46 66 0.14 84 P2 TWD 6 FB4
-1.01 TEC TEH 3
HOT 720UL BOBBIN 47 79 0.06 119 P2 TWO 3 FB6
-0.83 TEC TEN 14 NOT 720UL BOBBIN 50 54 0.12 80 P2 TWO 5 FBS
-0.13 TEC TEN 10 NOT 720UL BOBBIN 52 52 0.13 85 P2 TWO 5 FB4
+0.52 TEC TEN 6
NOT 720UL BOBBIN 42 60 0.2O 109 P2 TWD 16 FB3
-2.03 TEC TEH 6
HOT 720UL BOBBIN 53 49 0.16 95 P2 TWO 7 FB5
-1.17 TEC TEN 5
NOT 720UL BOBBIN 0.21 114 P2 TWD 9 FB4
+1.14 TEC TEH 5
HOT 720UL BOBBIN 54 56 0.09 73 P2 TWD 4 FB4
-0.97 TEC TEH 5
HOT 720UL BOBBIN 0.12 116 P2 TWD 5 FBS
+1.45 TEC TEH 5
HOT 720UL BOBBIN 0.11 74 P2 TWD 5 FB6
-1.19 TEC TEH 5
HOT 720UL BOBBIN 47 47 0.09 120 P2 TWD 4 FB2
-2.24 TEC TEH 6
HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:37 Component: S/G 11 Page 2 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 57 51 0.14 38 P2 TWD 6 FB5
+1.57 TEC TEH 6
HOT 720UL BOBBIN 58 42 0.13 62 P2 TWD 5 FB4
-1.09 TEC TEH 6
HOT 720UL BOBBIN 58 48 0.18 115 P2 TWD 7 FB4
-1.14 TEC TEH 5
HOT 720UL BOBBIN 0.14 138 P2 TWD 6 FB7
+2.46 TEC TEH 5
HOT 720UL BOBBIN 58 52 0.12 114 P2 TWO 5 FB4
-1.12 TEC TEN 5
NOT 720UL BOBBIN 58 72 0.11 106 P2 TWD 5 FB4
-1.08 TEC TEH 3
HOT 720UL BOBBIN 59 47 0.12 117 P2 TWD 5 FB3
+1.30 TEC TEH 3
HOT 720UL BOBBIN 59 51 0.11 78 P2 TWO 5 PBS
+1.34 TEC TEN 5
NOT 720UL BOBBIN 59 57 0.19 126 P2 TWD 8 FB4
+1.14 TEC TEH 5
HOT 720UL BOBBIN 0.18 99 P2 TWO 8 FB5
+0.97 TEC TEH 5
HOT 720UL BOBBIN 59 59 0.12 139 P2 TWO 5 FB5
-1.10 TEC TEH 5
HOT 720UL BOBBIN 59 61 59 69 0.13 123 P2 TWD 6 0.26 116 P2 TWD 10 FB5
+1.08 TEC TEH FB4
+1.06 TEC TEH 60 54 0.47 122 P2 TWD 17 FB4
+0.00 TEC TEH 0.34 129 P2 TWD 13 FB5
+0.00 TEC TEH 0.16 112 P2 TWD 7 FB6
+0.00 TEC TEH 60 56 0.32 117 P2 TWD 11 FB5
+1.09 TEC TEH 0.16 113 P2 TWD 6 FB4
-1.09 TEC TEH 0.14 130 P2 TWD 5 FB3
-1.09 TEC TEH 60 58 0.17 91 P2 TWD 6 FBI
-2.13 TEC TEH 60 62 0.12 132 P2 TWD 5 FB4
-1.09 TEC TEH 61 53 0.20 76 P2 TWD 8 FB4
+0.99 TEC TEH 0.12 118 P2 TWD 5 FB5
+1.45 TEC TEH 61 55 0.13 119 P2 TWD 5 FB6
+1.84 TEC TEH 61 57 0.11 84 P2 TWD 5 FB5
+0.70 TEC TEH 0.15 90 P2 TWO 6 FB4
-1.09 TEC TEH 61 61 0.12 128 P2 TWD 5 FB6
-1.09 TEC TEH 0.19 113 P2 TWD 7 FB5
+1.14 TEC TEH 0.20 123 P2 TWD 8 FB5
-1.09 TEC TEH 0.41 117 P2 TWD 14 FB4
+1.11 TEC TEH 0.19 89 P2 TWD 7 FB4
-1.09 TEC TEH 0.11 132 P2 TWD 4 FB3
+1.11 TEC TEH 0.09 156 P2 TWD 4 FB3
-1.09 TEC TEH 61 63 0.12 98 P2 TWO 5 FB4
-0.99 TEC TEH 5
HOT 720UL BOBBIN 3
NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 4
HOT 5
NOT 5
HOT 9
HOT 6
NOT 6
NOT 6
NOT 6
NOT 6
NOT 6
HOT 6
NOT 6
HOT 6
NOT 3
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 7200L BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 61 79 0.10 69 P2 TWD 4 FB4
+0.94 TEC TEH 62 42 0.12 101 P2 TWO 5 FB6
-1.07 TEC TEH 0.18 88 P2 TWD 7 FB5
+1.13 TEC TEH 0.20 113 P2 TWO 8 FB4
-1.09 TEC TEH 13 HOT 720UL BOBBIN 6
NOT 720UL 6
HOT 720UL 6
HOT 720UL BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 11:53:37 Component:
S/G 11 Page 3 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE
-- -- -= = -= = = = -- -- - -.
62 44 0.14 133 P2 TWD 5 FB5
+1.05 TEC TEH 0.24 96 P2 TWD 9 FB4
-1.09 TEC TEH 0.12 124 P2 TWD 5 FB3
-1.09 TEC TEH 62 48 0.19 108 P2 TWD 8 FB5
+1.21 TEC TEH 0.12 132 P2 TWD 5 FB5
-1.10 TEC TEH 0.27 120 P2 TWD 11 FB4
-1.08 TEC TEH 0.12 120 P2 TWD 5 FB3
-1.23 TEC TEH 62 54 0.11 59 P2 TWD 5 FB6
-0.24 TEC TEH 0.13 75 P2 TWD 6 FB5
+0.00 TEC TEH 0.19 121 P2 TWD 8 FB4
+0.00 TEC TEH 62 56 0.07 105 P2 TWD 3 FB4
-1.01 TEC TEH 0.21 131 P2 TWD 9 FB4
+1.17 TEC TEH 0.22 132 P2 TWD 9 FB5
-1.08 TEC TEH 0.19 128 P2 TWD 8 FB5
+1.14 TEC TEH 0.26 111 P2 TWD 10 FB6
-1.08 TEC TEH 0.12 92 P2 TWD 5 FB3
-1.23 TEC TEH 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 5----NOT------------------BOBBIN-------
5 HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 9
NOT 720UL BOBBIN 9
HOT 720UL BOBBIN 9
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN S
NOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 62 60 0.20 113 P2 TWD 8 FB5
-1.10 TEC TEH 5
HOT 720UL BOBBIN 62 68 0.11 119 P2 TWD 5 FB4
+1.41 TEC TEH 3
HOT 720UL BOBBIN 63 45 0.29 97 P2 TWD 11 FB4
+1.16 TEC TEH 6
HOT 720UL BOBBIN 0.14 119 P2 TWD 5 FB3
+1.23 TEC TEH 6
HOT 720UL BOBBIN 63 53 0.24 107 P2 TWD 10 FB4
-1.10 TEC TEH 5
HOT 720UL BOBBIN 63 69 0.14 127 P2 TWD 6 FB4
+1.04 TEC TEH 3
HOT 720UL BOBBIN 64 46 0.15 110 P2 TWD 6 FB4
-1.05 TEC TEH 5
HOT 720UL BOBBIN 0.16 84 P2 TWD 7 FB5
+1.19 TEC TEH 5
HOT 720UL BOBBIN 64 50 0.23 72 P2 TWD 9 FB5
+1.16 TEC TEH 6
HOT 720UL BOBBIN 0.14 121 P2 TWD 5 FB4
-1.10 TEC TEH 6
HOT 720UL BOBBIN 64 52 0.12 75 P2 TWD 5 FB4
-1.03 TEC TEH 6
HOT 720UL BOBBIN 64 54 0.08 142 P2 TWD 4 FB5
-0.44 TEC TEH 10 HOT 720UL BOBBIN 64 60 0.13 72 P2 TWD 5 64 66 0.16 128 P2 TWD 7 65 45 0.30 129 P2 TWD 12 0.31 119 P2 TWD 12 0.39 117 P2 TWD 14 0.16 136 P2 TWD 7 0.17 141 P2 TWD 7 FB5
+1.05 TEC TEH 6
HOT 720UL BOBBIN FB4
+1.08 TEC TEH 4
HOT 720UL BOBBIN FB6
-1.36 TEC TEH 5
HOT 720UL BOBBIN FB5
-1.21 TEC TEH 5
HOT 720UL BOBBIN FB4
+1.12 TEC TEH 5
HOT 720UL BOBBIN FB4
-1.14 TEC TEH 5
HOT 720UL BOBBIN FB3
+1.23 TEC TEH 5
HOT 720UL BOBBIN 65 49 0.17 98 P2 0.16 151 P2 0.11 107 P2 0.38 106 P2 0.11 92 P2 TWD TWD TWD TWD TWD 7
7 5
14 5
FB6
+1.25 TEC TEH FB5
+1.14 TEC TEH FB5
-1.21 TEC TEH FB4
+1.14 TEC TEH FB3
+1.25 TEC TEH S
NOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 65 51 0.30 99 P2 TWD 11 FB6
+1.01 TEC TEH 6
HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:37 Component:
S/G 11 Page 4 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.25 100 P2 TWD 9 FB5
+1.03 TEC TEH 6
HOT 720UL BOBBIN 65 55 0.10 127 P2 TWD 4 FB5
+0.90 TEC TEH 9
HOT 720UL BOBBIN 65 57 0.14 124 P2 TWD 5 FB3
-1.07 TEC TEH 6
HOT 720UL BOBBIN 0.35 106 P2 TWD 12 FB4
-1.09 TEC TEH 6
HOT 720UL BOBBIN 0.49 111 P2 TWD 16 FB4
+1.07 TEC TEH 6
HOT 720UL BOBBIN 0.66 108 P2 TWD 20 FB5
-1.09 TEC TEH 6
HOT 720UL BOBBIN 0.13 115 P2 TWD 5 FB6
-1.09 TEC TEN 6
HOT 720UL BOBBIN 0.21 135 P2 TWD 8 FB6
+1.07 TEC TEH 6
HOT 720UL BOBBIN 0.09 135 P2 TWD 4 FB5
+0.70 TEC TEH 6
HOT 720UL BOBBIN 65 59 0.20 0.28 130 P2 TWD 8 FB6 114 P2 TWD 10 FB4
-1.09
+1.05 TEC TEH TEC TEH 6
HOT 6
HOT 720UL BOBBIN 720UL BOBBIN 65 61 0.33 121 P2 TWD 13 FB6
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.18 135 P2 TWD 8 FB5
+1.14 TEC TEH 4
HOT 720UL BOBBIN 0.28 115 P2 TWD 11 FB5
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.35 116 P2 TWD 14 FB4
+1.03 TEC TEH 4
HOT 720UL BOBBIN 0.18 114 P2 TWD 8 FB4
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.39 127 P2 TWD 15 FB3
+1.38 TEC TEH 4
HOT 720UL BOBBIN 65 63 0.18 107 P2 TWO 8 FB6
+1.09 TEC TEN 23 NOT 720UL BOBBIN 0.21 113 P2 TWD 9 FB5
+1.09 TEC TEH 23 HOT 720UL BOBBIN 0.10 141 P2 TWD 9 FB3
+1.37 TEC TEH 23 HOT 720UL BOBBIN 65 65 0.14 113 P2 TWO 6 FB5
-1.09 TEC TEN 23 NOT 720UL BOBBIN 0.16 124 P2 TWO 7 FB4
+0.96 TEC TEN 23 NOT 720UL BOBBIN 0.11 109 P2 TWD 5 FB3
+0.89 TEC TEH 23 HOT 720UL BOBBIN 65 67 0.12 100 P2 TWD 6 FB3
+1.03 TEC TEH 3
HOT 720UL BOBBIN 0.10 61 P2 TWD 4 FB5
+1.03 TEC TEH 3
HOT 720UL BOBBIN 0.09 69 P2 TWD 4 FB6
+1.03 TEC TEH 3
HOT 720UL BOBBIN 66 38 0.12 117 P2 TWO 5 FB3
-1.09 TEC TEN 6
NOT 720UL BOBBIN 66 46 0.17 116 P2 TWD 7 FB36
+1.13 TEC TEH 6
HOT 720UL BOBBIN 0.79 110 P2 TWO 22 FBS
+1.11 TEC TEN 6
HOT 720UL BOBBIN 0.18 106 P2 TWD 7 FB5
-1.00 TEC TEH 6
HOT 720UL BOBBIN 0.31 97 P2 TWD 11 FB4
+1.05 TEC TEH 6
HOT 720UL BOBBIN 0.35 112 P2 TWO 12 FB4
-1.09 TEC TEN 6
NOT 720UL BOBBIN 0.22 135 P2 TWD 8 FB3
-1.09 TEC TEH 6
HOT 720UL BOBBIN 66 48 0.22 121 P2 TWD 9 FB4
-1.10 TEC TEH 5
HOT 720UL BOBBIN 0.19 86 P2 TWD 8 FB5
+1.12 TEC TEH 5
HOT 720UL BOBBIN 0.15 90 P2 TWD 6 FB3
-1.28 TEC TEH 5
HOT 720UL BOBBIN 66 52 0.27 108 P2 TWD 11 FB5
-1.03 TEC TEH 5
HOT 0.19 134 P2 TWD 8 FB6
-1.10 TEC TEH 5
HOT 66 54 0.31 125 P2 TWD 12 FB6
+0.00 TEC TEH 9
HOT 0.70 123 P2 TWD 21 FB5
+0.00 TEC TEH 9
HOT 0.78 124 P2 TWD 23 FB4
+0.00 TEC TEH 9
HOT 0.14 90 P2 TWD 6 FB3
+0.00 TEC TEH 9
HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 66 56 0.17 0.17 0.22 0.22 107 P2 TWO 7 FB3
+1.-14 TEC TEN 107 P2 TWD 7 FB4
+1.06 TEC TEH 126 P2 TWD 9 FB5
-1.08 TEC TEH 127 P2 TWD 9 FB5
+1.17 TEC TEH 5
NOT 5
HOT 5
HOT 5
HOT
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:37 Component:
S/G 11 Page 5 of 16 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT 0.13 107 P2 TWD 6 FB7
+1.38 TEC 66 58 0.12 0.11 0.29 0.15 0.11 0.17 122 126 124 102 103 135 P2 P2 P2 P2 P2 P2 TWD TWD TWD TWD TWD TWD 5
5 11 6
5 7
FB3 FB4 FB4 FB5 FB5 FB6
-1.01
-1.01
+1.08
-1.01
+1.01
+1.12
-1.05
-0.66
+0.64 TEC TEC TEC TEC TEC TEC TEC TEC TEC EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE TEH 5
HOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN TEN S
NOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN TEH 5
HOT 720UL BOBBIN 66 60 0.10 79 P2 TWD 4 FB4 0.09 98 P2 TWD 4 FB5 0.09 111 P2 TWD 4 FB5 66 62 0.34 131 P2 TWD 13 FB3
-1.01 TEC TEH 3
HOT 720UL BOBBIN 0.43 131 P2 TWD 15 FB4
-1.06 TEC TEH 3
HOT 720UL BOBBIN 0.48 125 P2 TWD 16 FB5
+1.03 TEC TEH 3
HOT 720UL BOBBIN 0.24 122 P2 TWD 10 FB6
+1.17 TEC TEH 3
HOT 720UL BOBBIN 66 64 0.25 125 P2 TWD 10 FB4
-1.03 TEC TEH 3
HOT 720UL BOBBIN 0.19 125 P2 TWD 8 FB5
+1.06 TEC TEH 3
HOT 720UL BOBBIN 0.19 110 P2 TWD 8 FB6
+1.10 TEC TEH 3
HOT 720UL BOBBIN 66 66 0.12 100 P2 TWD 5 FB5
+0.96 TEC TEH 23 HOT 720UL BOBBIN 0.24 133 P2 TWD 10 FB4
-1.09 TEC TEH 23 HOT 720UL BOBBIN 66 72 0.12 120 P2 TWD 5 FB4
-1.06 TEC TEH 3
HOT 720UL BOBBIN 67 43 0.11 95 P2 TWD 5 FB5
-1.06 TEC TEH 23 HOT 720UL BOBBIN 0.14 137 P2 TWD 6 FB4
+0.98 TEC TEH 23 HOT 720UL BOBBIN 0.11 102 P2 TWD 5 FB3
+1.15 TEC TEH 23 HOT 720UL BOBBIN 67 45 0.14 93 P2 TWD 5 FB6
-1.09 TEC TEH 6
HOT 720UL BOBBIN 0.16 91 P2 TWD 6 FB5
-1.07 TEC TEH 6
HOT 720UL BOBBIN 0.14 72 P2 TWD 6 FB4
+1.01 TEC TEH 6
HOT 720UL BOBBIN 0.18 126 P2 TWD 7 FB3
-1.09 TEC TEH 6
HOT 720UL BOBBIN 67 47 0.16 132 P2 TWD 7 FB4
+1.03 TEC TEH 5
HOT 720UL BOBBIN 67 49 0.15 84 P2 TWD 6 FB5
-1.09 TEC TEH 6
HOT 720UL BOBBIN 67 51 0.14 133 P2 TWD 6 FB4
+1.06 TEC TEH 5
HOT 720UL BOBBIN 67 55 0.12 108 P2 TWD 5 FB6
-1.07 TEC TEH 10 HOT 720UL BOBBIN 0.20 109 P2 TWD 9 FB4
-1.09 TEC TEH 10 HOT 720UL BOBBIN 67 57 0.12 133 P2 TWD 5 FB5
+0.92 TEC TEH 5
HOT 720UL BOBBIN 67 59 0.16 133 P2 TWD 7 FB3
+1.21 TEC TEH 5
HOT 720UL BOBBIN 0.50 128 P2 TWD 17 FB4
+1.17 TEC TEH 5
HOT 720UL BOBBIN 0.18 117 P2 TWD 7 FB5
-1.06 TEC TEH 5
HOT 720UL BOBBIN 67 61 0.19 132 P2 TWD 8 FB3
+1.19 TEC TEH 3
HOT 720UL BOBBIN 0.57 124 P2 TWD 19 FB4
-1.01 TEC TEH 3
HOT 720UL BOBBIN 0.50 124 P2 TWD 17 FB5
-1.08 TEC TEH 3
HOT 720UL BOBBIN 0.23 118 P2 TWD 9 FB6
-1.01 TEC TEH 3
HOT 720UL BOBBIN 67 63 0.37 123 P2 TWD 14 FB6
+1.12 0.39 120 P2 TWD 15 FB5
+1.03 0.12 119 P2 TWD 6 FB4
-1.10 TEC TEN 4
TEC TEH 4
TEC TEH 4
NOT 720UL HOT 720UL HOT 720UL BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:38 Component: S/G 11 Page 6 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 67 67 0.08 150 P2 TWD 4 FB3
+1.21 TEC TEH 4
HOT 720UL BOBBIN 67 69 0.12 133 P2 TWD 5 FB5
+1.06 TEC TEH 3
HOT 720UL BOBBIN 68 40 0.14 140 P2 TWD 6 FB6
+1.23 TEC TEH 5
HOT 720UL BOBBIN 0.20 106 P2 TWD 8 FB4
-1.16 TEC TEH 5
HOT 720UL BOBBIN 0.12 140 P2 TWD 5 FB3
-1.27 TEC TEH 5
HOT 720UL BOBBIN 68 42 0.12 102 P2 TWD 5 FB3
-1.10 TEC TEH 5
HOT 720UL BOBBIN 68 44 0.31 108 P2 TWD 12 FB6
+1.27 0.36 113 P2 TWD 13 FB5
+1.21 0.18 91 P2 TWD 8 FB5
-1.19 0.80 125 P2 TWO 23 FB4
-1.16 0.50 128 P2 TWD 17 FB3
-1.30 68 50 0.21 110 P2 TWD 8 FB6
+1.25 0.19 136 P2 TWD 7 FB6
-1.10 0.21 129 P2 TWD 8 FB5
+1.14 0.58 118 P2 TWD 18 FB5
-1.10 0.37 95 P2 TWD 13 FB4
+1.01 0.36 106 P2 TWD 13 FB4
-1.10 0.30 112 P2 TWD 11 FB3
-1.10 TEC TEH 5
TEC TEH 5
TEC TEH 5
TEC TEH 5
TEC TEH 5
TEC TEN 6
TEC TEH 6
TEC TEH 6
TEC TEH 6
TEC TEH 6
TEC TEH 6
TEC TEH 6
HOT 720UL HOT 720UL HOT 720UL HOT 720UL HOT 720UL NOT 720UL HOT 720UL HOT 720UL HOT 720UL*
HOT 720UL HOT 720UL HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 68 52 0.21 103 P2 TWD 8 FB4
-1.09 TEC TEH 68 54 0.31 131 P2 TWD 12 FB6
-0.07 TEC TEH 0.37 119 P2 TWD 14 FB5
-0.07 TEC TEH 0.88 126 P2 TWD 25 FB4
-0.07 TEC TEH 0.19 129 P2 TWD 8 FB3
+0.00 TEC TEH 68 56 0.15 121 P2 TWD 6 FB5
+1.27 TEC TEH 0.21 110 P2 TWD 8 FB5
-1.09 TEC TEH 0.14 133 P2 TWD 5 FB4
+1.07 TEC TEH 0.09 137 P2 TWD 4 FB3
-1.09 TEC TEH 68 60 0.18 121 P2 TWO 7 FB5
+1.21 TEC TEH 0.28 116 P2 TWD 10 FB5
-1.10 TEC TEH 0.12 126 P2 TWD 5 FB3
-1.10 TEC TEH 68 62 0.28 125 P2 TWD 11 FB6
+1.23 TEC TEH 0.33 117 P2 TWD 13 FB5
+1.09 TEC TEH 0.23 122 P2 TWD 9 FB5
-1.09 TEC TEH 0.24 111 P2 TWD 10 FB4
+1.09 TEC TEH 0.15 138 P2 TWD 6 FB3
-1.07 TEC TEH 68 68 0.21 116 P2 TWD 9 FB6
+1.12 TEC TEH 0.13 105 P2 TWD 6 FB5
+1.07 TEC TEH 0.13 96 P2 TWD 6 FB4
-1.10 TEC TEH 6
HOT 10 NOT 10 HOT 10 HOT 10 HOT 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
NOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
NOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
NOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 69 43 0.16 131 P2 TWD 6 FB5
-1.07 0.16 107 P2 TWD 6 FB4
+1.11 0.14 111 P2 TWD 5 FB3
+1.14 69 45 0.18 118 P2 TWD 7 FB4
+1.05 0.18 121 P2 TWD 7 FB6
+1.08 TEC TEN TEC TEH TEC TEH TEC TEN S
NOT 720UL BOBBIN TEC TEH 5
HOT 720UL BOBBIN 69 47 0.13 92 P2 TWD 5 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 11:53:38 Component: S/G 11 Page 7 of 16 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 0.19 89 P2 TWD 7 FB4
+1.05 69 53 0.14 0.30 0.71 0.23 0.13 0.27 129 P2 TWD 6 FB6
+1.23 101 P2 TWD 11 FB6
-1.09 109 P2 TWD 21 FB5
+0.96 91 P2 TWD 9 FB4
+0.96 71 P2 TWD 5 FB4
-1.03 124 P2 TWD 10 FB2
-2.13 EXT EXT UTIL 1
UTIL 2
CAL # LEG TEC TEH 6
HOT TEC TEN 6
NOT TEC TEH 6
HOT TEC TEH 6
HOT TEC TEH 6
HOT TEC TEH 6
HOT TEC TEH 6
HOT PROBE 720UL 720UL 720UL 720UL 720UL 720UL 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 69 55 0.12 125 P2 TWD 5 FB5
-1.16 TEC TEH 9
HOT 720UL BO 0.15 124 P2 TWD 6 FB4
+1.12 TEC TEH 9
HOT 720UL BO 0.09 96 P2 TWD 4 FB4
-1.16 TEC TEH 9
HOT 720UL BO 69 57 0.15 89 P2 TWD 6 FB5
-1.09 TEC TEH 6
HOT 720UL BO 0.13 62 P2 TWD 5 FB4
+1.03 TEC TEH 6
HOT 720UL BO 69 59 0.42 118 P2 TWO 14 FB6
+1.09 TEC TEN 6
NOT 720UL BC 0.35 132 P2 TWD 12 FB5
+1.01 TEC TEH 6
HOT 720UL BO 0.29 108 P2 TWD 10 FB5
-1.09 TEC TEH 6
HOT 720UL BO 0.68 112 P2 TWD 20 FB4
+1.12 TEC TEH 6
HOT 720UL BO 0.14 93 P2 TWD 6 FB4
-1.09 TEC TEH 6
HOT 720UL BO 0.23 124 P2 TWD 9 FB3
+1.25 TEC TEH 6
HOT 720UL BC 0.15 138 P2 TWD 6 FB3
-1.07 TEC TEH 6
HOT 720UL BO 69 61 0.13 115 P2 TWD 6 FB4
+1.03 TEC TEH 4
HOT 720UL BO 69 65 0.18 137 P2 TWD 7 FB3
+1.12 TEC TEH 3
HOT 720UL BO 0.39 129 P2 TWD 14 FB4
+1.08 TEC TEH 3
HOT 720UL BO 0.19 128 P2 TWD 8 FB5
-1.08 TEC TEH 3
HOT 720UL BO 0.16 120 P2 TWD 7 FB6
-1.08 TEC TEH 3
HOT 720UL BO 69 67 0.11 117 P2 TWD 5 FB4
+1.00 TEC TEH 23 HOT 720UL BO 0.12 121 P2 TWD 5 FB3
+1.09 TEC TEH 23 HOT 720UL BO 69 69 0.38 124 P2 TWD 14 FB4
+1.05 TEC TEH 4
HOT 720UL BO 70 42 0.14 129 P2 TWD 5 FB4
-1.03 TEC TEH 6
HOT 720UL BO 70 46 0.31 135 P2 TWD 11 FB5
+1.01 TEC TEH 6
HOT 720UL BO 0.27 124 P2 TWD 10 FB4
-1.09 TEC TEH 6
HOT 720UL BO BBIN BBIN
'BBIN
)BBIN
)BBIN
'BBIN
'BBIN BBIN BBIN
'BBIN
'BBIN BBIN
'BBIN
'BBIN
- BBIN
'BBIN
'BBIN
'BBIN
'BBIN
'OBIN
- BBIN
'BBIN
'OBIN 70 48 0.14 107 P2 TWD 6 FB4
-1.12 TEC TEH 5
HOT 720UL BOBBIN 70 54 0.21 83 P2 TWD 9 FB6
+0.00 TEC TEH 9
HOT 720UL BOBBIN 0.33 97 P2 TWD 13 FB5
+0.00 TEC TEH 9
HOT 720UL BOBBIN 0.21 93 P2 TWD 8 FB4
+0.00 TEC TEH 9
HOT 720UL BOBBIN 70 56 0.17 133 P2 TWD 7 FB3
-1.08 TEC TEH 5
HOT 720UL BOBBIN 0.20 134 P2 TWD 8 FB4
+1.06 TEC TEH 5
HOT 720UL BOBBIN 0.62 131 P2 TWD 20 FB5
-1.03 TEC TEH 5
HOT 720UL BOBBIN 0.13 76 P2 TWD 6 FB6
-1.10 TEC TEH HOT 720UL 70 60 0.10 122 P2 TWD 4 FB3
-1.10 TEC TEH 5
HOT 720UL 0.16 132 P2 TWD 7 FB5
-1.03 TEC TEH 5
HOT 720UL 0.14 141 P2 TWD 6 FB5
+1.01 TEC TEH 5
HOT 720UL 70 62 0.26 133 P2 TWD 10 FB3
-1.10 TEC TEH 3
HOT 720UL 0.22 131 P2 TWO 9 FB4
-1.08 TEC TEH 3
HOT 720UL 0.30 132 P2 TWD 11 FB4
+1.10 TEC TEH 3
HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:38 Component: S/G 11 Page 8 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 0.15 113 P2 TWD 6 FB5
-1.08 TEC TEH 0.37 127 P2 TWD 13 FB5
+1.01 TEC TEH 0.34 124 P2 TWD 13 FB6
+1.03 TEC TEH 70 64 0.19 125 P2 TWD 8 FB5
+1.20 TEC TEH 0.12 99 P2 TWD 5 FB4
-1.05 TEC TEH 0.12 127 P2 TWD 5 FB3
+1.27 TEC TEH 0.08 88 P2 TWD 4 FB6
+1.24 TEC TEH 2
CAL #
3 3
3 23 23 23 23 LEG HOT HOT HOT HOT HOT HOT HOT PROBE 720UL 720UL 720UL 720UL 720UL 720UL 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 70 66 0.11 117 P2 TWD 5 FB4
+1.06 TEC TEH 70 68 0.17 97 P2 TWD 7 FB4
-1.01 TEC TEH 0.14 97 P2 TWD 6 FB6
+1.10 TEC TEH 71 39 0.14 126 P2 TWD 6 FB3
+1.19 TEC TEH 71 49 0.18 115 P2 TWD 7 FB5
+1.00 TEC TEH 0.17 101 P2 TWD 7 FB5
-1.09 TEC TEH 0.23 80 P2 TWD 9 FB4
+1.18 TEC TEH 0.18 94 P2 TWD 7 FB4
-1.09 TEC TEH 0.14 123 P2 TWD 6 FB3
+1.26 TEC TEH 3
HOT 720UL BOBBIN 3
HOT 720UL 3
HOT 720UL 5
HOT 720UL 6
NOT 720UL 6
HOT 720UL 6
HOT 720UL 6
HOT 720UL 6
HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 71 51 0.39 0.39 0.58 0.54 71 55 0.30 0.33 0.74 0.18 135 P2 TWD 14 FB6
+1.23 138 P2 TWD 14 FB5
+1.10 135 P2 TWD 19 FB4
+1.14 124 P2 TWD 18 FB3
+1.23 129 P2 TWD 12 FB6
-1.01 134 P2 TWD 13 FB5
+1.07 122 P2 TWD 23 FB4
-1.09 140 P2 TWO 8 FB3
-1.24 TEC TEH 5
HOT 720UL BOBBIN TEC TEH 5
HOT 720UL BOBBIN TEC TEH 5
HOT 720UL BOBBIN TEC TEH 5
HOT 720UL BOBBIN TEC TEN 10 NOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN 71 61 71 63 71 67 71 71 71 79 0.44 135 P2 TWD 15 FB3
+1.01 TEC TEH 3
HOT 720UL BOBBIN 0.38 130 P2 TWD 14 FB4
-1.08 TEC TEH 3
HOT 720UL BOBBIN 0.86 123 P2 TWD 24 FB4
+1.12 TEC TEH 3
HOT 720UL BOBBIN 0.59 132 P2 TWD 19 FB5
-1.06 TEC TEH 3
HOT 720UL BOBBIN 0.38 129 P2 TWD 14 FB5
+1.10 TEC TEH 3
HOT 720UL BOBBIN 0.54 127 P2 TWD 18 FB6
-1.08 TEC TEH 3
HOT 720UL BOBBIN 0.17 111 P2 TWO 7 FB6
+1.21 TEC TEH 3
HOT 720UL BOBBIN 0.14 133 P2 TWD 6 FB7
-0.70 TEC TEH 3
HOT 720UL BOBBIN 0.24 135 P2 TWO 10 PB6
-1.10 TEC TEN 4
NOT 720UL BOBBIN 0.36 110 P2 TWD 14 FBS
-1.03 TEC TEH 4
HOT 720UL BOBBIN 0.18 92 P2 TWD 8 FB4
+1.14 TEC TEH 4
HOT 720UL BOBBIN 0.17 113 P2 TWD 8 FB3
+1.18 TEC TEH 4
HOT 720UL BOBBIN 0.10 131 P2 TWD 5 FB6
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.13 95 P2 TWO 6 PBS
-1.1I0 TEC TEN 4
NOT 720UL BOBBIN 0.16 119 P2 TWD 7 FB4
+1.12 TEC TEH 4
HOT 720UL BOBBIN 0.13 110 P2 TWD 6 FB3
+1.23 TEC TEH 4
HOT 720UL BOBBIN 0.15 116 P2 TWD 6 FB4
+1.06 TEC TEH 3
HOT 720UL BOBBIN 0.07 131 P2 TWD 3 FB7
-0.72 TEC TEH 14 HOT 720UL BOBBIN 72 38 0.14 107 P2 TWD 6 FB3
-1.10 TEC TEH 5
HOT 720UL BOBBIN 0.20 118 P2 TWD 8 FB4
-1.05 TEC TEH 5
HOT 720UL BOBBIN 72 44 0.15 136 P2 TWD 7 FB3
-1.10 TEC TEH 5
HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 11:53:38 Customer Name: DC COOK Unit 1 Component: S/G 11 Page 9 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.57 124 P2 TWD 19 FB4
-1.08 TEC TEH 5
HOT 720UL BOBBIN 0.26 136 P2 TWD 10 FB5
+1.19 TEC TEH 5
HOT 720UL BOBBIN 0.16 135 P2 TWD 7 FB6
+1.14 TEC TEH 5
HOT 720UL BOBBIN 72 46 0.20 110 P2 TWD 8 FB6
+1.32 TEC TEH 5
HOT 720UL BOBBIN 0.19 124 P2 TWD 8 FB6
-1.25 TEC TEH 5
HOT 720UL BOBBIN 0.68 119 P2 TWD 21 FB5
+1.10 TEC TEH 5
HOT 720UL BOBBIN 0.14 90 P2 TWD 6 FB5
-1.19 TEC TEH 5
HOT 720UL BOBBIN 0.61 121 P2 TWD 20 FB4
-1.08 TEC TEH 5
HOT 720UL BOBBIN 0.21 102 P2 TWD 9 FB3
-1.25 TEC TEH 5
HOT 720UL BOBBIN 72 50 0.14 83 P2 TWD 6 FB6
+1.03 TEC TEH 6
HOT 720UL BOBBIN 0.22 108 P2 TWD 8 FB5
+0.85 TEC TEH 6
HOT 720UL BOBBIN 0.14 103 P2 TWD 6 FB4
-1.07 TEC TEH 6
HOT 720UL BOBBIN 72 54 0.15 122 P2 TWD 6 FB5
+0.00 TEC TEH 10 HOT 720UL BOBBIN 0.56 125 P2 TWD 19 FB4
+0.00 TEC TEH 10 HOT 720UL BOBBIN 0.18 135 P2 TWD 8 FB3
+0.00 TEC TEH 10 HOT 720UL BOBBIN 72 56 0.32 106 P2 TWD 11 FB6
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.83 i1i P2 TWD 23 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.09 63 P2 TWD 4 FB4
-1.10 TEC TEH 6
HOT 720uL BOBBIN 0.13 123 P2 TWD 5 FB3
-1.10 TEC TEH 6
HOT 720UL BOBBIN 72 58 0.22 132 P2 TWD 8 FB6
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.61 109 P2 TWD 19 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.22 82 P2 TWD 8 FB4
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.19 129 P2 TWD 7 FB3
-1.10 TEC TEH 6
HOT 720UL BOBBIN 72 60 0.14 102 P2 TWD 6 FB4
+1.49 TEC TEH 6
HOT 720UL BOBBIN 0.17 91 P2 TWD 7 FB4
-1.10 TEC TEH 6
HOT 720UL BOBBIN 72 62 0.53 114 P2 TWD 18 FB6
+1.12 TEC TEH 4
HOT 720UL BOBBIN 0.24 133 P2 TWD 10 FB5
+1.16 TEC TEH 4
HOT 720UL BOBBIN 0.10 146 P2 TWD 5 FB5
-1.09 TEC TEH 4
HOT 720UL BOBBIN 0.27 117 P2 TWD 11 FB4
+1.14 TEC TEH 4
HOT 720UL BOBBIN 0.15 115 P2 TWD 6 FB4
-1.09 TEC TEH 4
HOT 720UL BOBBIN 0.25 131 P2 TWD 10 FB3
-1.09 TEC TEH 4
HOT 720UL BOBBIN 72 64 0.13 93 P2 TWD 6 FB6
+1.10 TEC TEH 4
HOT 720UL BOBBIN 0.11 86 P2 TWD 5 FB4
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.12 124 P2 TWD 5 FB3
-1.10 TEC TEH 4
HOT 720UL BOBBIN 72 66 0.16 129 P2 TWD 7 FB5
+1.05 TEC TEH 4
HOT 720UL BOBBIN 0.54 114 P2 TWD 18 FB4
-1.08 TEC TEH 4
HOT 720UL BOBBIN 72 70 0.15 124 P2 TWD 7 FB4
-1.10 TEC TEH 4
HOT 720UL BOBBIN 73 41 0.37 122 P2 TWD 14 FB3
+1.14 TEC TEH 5
HOT 720UL BOBBIN 0.23 129 P2 TWD 9 FB4
+1.08 TEC TEH 5
HOT 720UL BOBBIN 0.19 137 P2 TWD 8 FB5
-1.06 TEC TEH 5
HOT 720UL BOBBIN 73 61 0.29 120 P2 TWD 12 FB6
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.43 123 P2 TWD 16 FB5
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.52 120 P2 TWD 18 FB4
+1.10 TEC TEH 4
HOT 720UL BOBBIN 73 63 0.13 100 P2 TWD 5 FB3
-1.10 TEC TEH 3
HOT 720UL BOBBIN 0.24 115 P2 TWD 10 FB3
+1.23 TEC TEH 3
HOT 720UL BOBBIN 0.12 70 P2 TWD 5 FB4
+1.17 TEC TEH 3
HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:38 Component: S/G 11 Page 10 of 16 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 0.30 117 P2 TWD 11 FB5 0.24 130 P2 TWD 9 FB6 73 65 0.14 139 P2 TWD 6 FB5 0.22 145 P2 TWD 9 FB4 0.18 122 P2 TWD 8 FB3 73 67 0.14 83 P2 TWD 6 FB4 0.11 132 P2 TWD 5 FB3 0.09 25 P2 TWD 4 FB7 EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE
-0.97 TEC TEH 3
HOT 720UL BOBBIN
-1.06 TEC TEH 3
HOT 720UL BOBBIN
-1.03 TEC TEN 23 NOT 720UL BOBBIN
+0.98 TEC TEH 23 HOT 720UL BOBBIN
+1.13 TEC TEH 23 HOT 720UL BOBBIN
+1.18 TEC TEH 23 HOT 720UL BOBBIN
+1.02 TEC TEN 23 NOT 720UL BOBBIN
-1.09 TEC TEH 23 HOT 720UL BOBBIN 73 69 0.19 90 P2 TWD 8 FB4 74 40 0.18 61 P2 TWD 7 FB5 0.17 74 P2 TWD 7 FB4 0.19 78 P2 TWD 7 FB3 74 42 0.22 63 P2 TWD 8 FB4
+1.01 TEC TEH 4
HOT 720UL BOBBIN
+1.16 TEC TEN 6
NOT 720UL BOBBIN
-1.09 TEC TEH 6
HOT 720UL BOBBIN
-1.09 TEC TEH 6
HOT 720UL BOBBIN
-1.09 TEC TEH 6
HOT 720UL BOBBIN 74 44 0.37 99 P2 TWD 13 FB5
+1.12 TEC TEH 6
HOT 720UL BOBBIN 0.57 94 P2 TWD 18 FB4
-1.09 TEC TEH 6
HOT 720UL BOBBIN 0.15 90 P2 TWD 6 FB3
-1.01 TEC TEH 6
HOT 720UL BOBBIN 74 50 0.12 114 P2 TWD 5 FB4
-1.08 TEC TEH 5
HOT 720UL BOBBIN 0.12 81 P2 TWD 5 FB5
+1.12 TEC TEH 5
HOT 720UL BOBBIN 74 56 0.11 90 P2 TWD 5 FB4
-1.10 TEC TEH 5
HOT 720UL BOBBIN 74 58 0.20 105 P2 TWD 8 FB3
-1.05 TEC TEH 5
HOT 720UL BOBBIN 0.51 121 P2 TWD 17 FB4
-1.03 TEC TEH 5
HOT 720UL BOBBIN 0.25 109 P2 TWD 10 FB5
-1.01 TEC TEH 5
HOT 720UL BOBBIN 0.24 123 P2 TWD 10 FB5
+1.16 TEC TEH 5
HOT 720UL BOBBIN 0.13 129 P2 TWD 6 FB6
+1.10 TEC TEH 5
HOT 720UL BOBBIN 74 60 0.15 100 P2 TWD 7 FB3
+1.12 TEC TEH 5
HOT 720UL BOBBIN 0.32 138 P2 TWD 12 FB4
-1.05 TEC TEH 5
HOT 720UL BOBBIN 0.14 86 P2 TWD 6 FB4
+1.08 TEC TEH 5
HOT 720UL BOBBIN 1.11 125 P2 TWD 28 FB5
+1.03 TEC TEH 5
HOT 720UL BOBBIN 0.24 108 P2 TWD 10 FB6
+1.08 TEC TEH 5
HOT 720UL BOBBIN 74 62 0.12 88 P2 TWD 5 FB5
+1.01 TEC TEH 3
HOT 720UL BOBBIN 74 64 0.18 135 P2 TWD 8 FB3
-1.08 TEC TEH 3
HOT 720UL BOBBIN 0.40 130 P2 TWD 14 FB4
-1.10 TEC TEH 3
HOT 720UL BOBBIN 0.26 114 P2 TWD 10 FB5
+1.03 TEC TEH 3
HOT 720UL BOBBIN 0.24 114 P2 TWD 10 FB6
+1.03 TEC TEH 3
HOT 720UL BOBBIN 74 66 0.18 117 P2 TWD 8 FB6
+1.09 TEC TEH 23 HOT 720UL BOBBIN 0.19 126 P2 TWD 8 FB5
+1.07 TEC TEH 23 HOT 720UL BOBBIN 0.43 136 P2 TWD 16 FB4
-1.09 TEC TEH 23 HOT 720UL BOBBIN 74 68 0.20 132 P2 TWO 8 FB4
-1.06 TEC TEN 3
NOT 720UL BOBBIN 74 72 0.12 87 P2 TWD 5 FB4
-1.08 TEC TEH 3
HOT 720UL BOBBIN 75 39 0.13 143 P2 TWD 6 FB6
-1.10 TEC TEH 5
HOT 720UL BOBBIN 75 43 0.30 135 P2 TWD 12 FB6
-1.09 TEC TEH 23 HOT 720UL BOBBIN 0.11 83 P2 TWD 5 FB5
+1.13 TEC TEH 23 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:38 Component: S/G 11 Page 11 of 16 Component: S/C 11 Page 11 of 16 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCAT 0.29 141 P2 TWD 11 FB5 0.28 138 P2 TWD 11 FB4 0.24 131 P2 TWD 10 FB3 75 45 0.13 106 P2 TWD 5 FB6 0.12 122 P2 TWD 5 FB6 0.60 104 P2 TWD 18 FB5 0.15 77 P2 TWD 6 FB5 0.18 129 P2 TWD 7 FB4 0.39 95 P2 TWD 13 FB4 ION
-1.09
+1.11
+1.13 EXT EXT UTIL 1
UTIL 2
CAL # LEG TEC TEN 23 HOT TEC TEH 23 HOT TEC TEH 23 HOT PROBE 720UL 720UL 720UL SCOPE BOBBIN BOBBIN BOBBIN
+1.02 TEC TEH
-1.07 TEC TEH
+1.00 TEC TEH
-1.07 TEC TEH
+1.11 TEC TEH
-1.09 TEC TEH 75 47 0.18 140 P2 TWD 8 FB6
-1.25 TEC TEH 0.31 132 P2 TWD 12 FB5
-1.14 TEC TEH 0.36 131 P2 TWD 13 FB4
+1.21 TEC TEH 0.12 128 P2 TWD 5 FB3
+1.32 TEC TEH 75 49 0.18 143 P2 TWD 7 FB6
+1.09 TEC TEH 0.77 I11 P2 TWD 22 FB5
-1.09 TEC TEH 1.07 99 P2 TWD 26 FB4
+1.01 TEC TEH 0.49 120 P2 TWD 16 FB3
+1.20 TEC TEH 75 51 0.38 106 P2 TWD 14 FB6
+1.21 TEC TEH 0.35 131 P2 TWD 13 FB5
+1.14 TEC TEH 0.21 125 P2 TWD 9 FB4
+1.14 TEC TEH 0.13 100 P2 TWD 6 FB4
-1.10 TEC TEH 0.13 104 P2 TWD 6 FB3
+1.23 TEC TEH 75 53 0.14 93 P2 TWD 6 FB3
+1.17 TEC TEH 0.20 119 P2 TWD 8 FB5
-1.08 TEC TEH 0.20 105 P2 TWD 8 FB5
+1.14 TEC TEH 75 57 0.27 119 P2 TWD 11 FB3
-1.08 TEC TEH 0.64 121 P2 TWD 20 FB4
-1.05 TEC TEH 0.22 109 P2 TWD 9 FB5
-0.92 TEC TEH 0.13 78 P2 TWD 6 FB5
+1.16 TEC TEH 0.16 96 P2 TWD 7 FB6
+1.19 TEC TEH 75 61 0.56 121 P2 TWD 18 FB3
+1.08 TEC TEH 0.71 128 P2 TWD 21 FB4
+1.03 TEC TEH 0.66 123 P2 TWD 21 FB5
-1.03 TEC TEH 0.24 126 P2 TWD 10 FB6
-1.06 TEC TEH 75 63 0.13 147 P2 TWD 6 FB7
-1.10 TEC TEH 0.67 130 P2 TWD 21 FB6
-1.10 TEC TEH 0.47 125 P2 TWD 17 FB5
-1.10 TEC TEH 0.24 122 P2 TWD 10 FB4
+1.05 TEC TEH 0.25 115 P2 TWO 10 FB3
-1.10 TEC TEH 75 65 0.10 80 P2 TWD 5 FB4
+1.08 TEC TEH 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 5
NOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
NOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
NOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
HOT 720UL BOBBIN 5
NOT 5
HOT 5
HOT 5
HOT 5
HOT 3
HOT 3
NOT 3
HOT 3
HOT 4
HOT 4
HOT 4
HOT 4
HOT 4
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 75 67 0.12 74 P2 TWD 6 FB5 0.16 129 P2 TWO 7 FB4
-1.10 TEC TEH
+1.05 TEC TEH 4
NOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 75 69 0.12 137 P2 TWD 5 FB3
+1.08 TEC TEH 3
HOT 0.23 135 P2 TWD 9 FB4
+1.06 TEC TEH 3
HOT 0.10 96 P2 TWO 4 FB5
-1.08 TEC TEH 3
HOT 75 71 0.12 108 P2 TWD 5 FB4
+1.08 TEC TEH 3
HOT 0.15 125 P2 TWD 6 FB6
-1.08 TEC TEH 3
HOT 720UL 720UL 720UL 72DUL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 11:53:38 Component: S/G 11 Page 12 of 16 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 76 44 0.18 0.72 0.94 0.43 0.11 76 46 0.54 0.88 0.17 0.95 0.36 76 48 0.13 0.18 0.29 0.40 0.14 149 P2 TWD 8 FB6
+1.17 TEC TEH 5
HOT 720UL BOBBIN 122 P2 TWD 22 FB5
+1.14 TEC TEH 5
HOT 720UL BOBBIN 127 P2 TWD 26 FB4
-1.10 TEC TEH 5
HOT 720UL BOBBIN 132 P2 TWD 15 FB3
-1.17 TEC TEH 5
HOT 720UL BOBBIN 97 P2 TWD 5 FB4
+1.25 TEC TEH 5
HOT 720UL BOBBIN 116 P2 TWD 18 FB6
+1.23 TEC TEH 5
HOT 720UL BOBBIN 118 P2 TWD 25 FB5
+1.17 TEC TEH 5
HOT 720UL BOBBIN 149 P2 TWD 7 FB5
-1.21 TEC TEH 5
HOT 720UL BOBBIN 127 P2 TWD 26 FB4
-1.08 TEC TEH 5
HOT 720UL BOBBIN 118 P2 TWD 13 FB3
-1.25 TEC TEH 5
HOT 720UL BOBBIN 130 1il 121 99 135 P2 P2 P2 P2 P2 TWD TWD TWO TWD TWD 5
7 11 14 6
FB6 FB6 FB5 FB4 FB3
+1.16
-1.09
+1.05
-1.09
-1.09 TEC TEH 6
TEC TEH 6
TEC TEH 6
TEC TEH 6
TEC TEH 6
HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 76 50 0.11 113 P2 TWD 5 FB6
-1.07 TEC TEH 6
HOT 720UL BOBBIN 0.16 81 P2 TWD 6 FB5
-1.09 TEC TEH 6
HOT 720UL BOBBIN 0.12 104 P2 TWD 5 FB4
-1.03 TEC TEH 6
HOT 720UL BOBBIN 76 52 0.12 Il1 P2 TWD 5 FB6
+1.23 TEC TEH 6
HOT 720UL BOBBIN 0.26 108 P2 TWD 10 FB5
+1.18 TEC TEH 6
HOT 720UL BOBBIN 0.15 133 P2 TWD 6 FB4
+1.03 TEC TEH 6
HOT 720UL BOBBIN 0.23 122 P2 TWD 8 FB4
-1.09 TEC TEH 6
HOT 720UL BOBBIN 76 58 0.14 96 P2 TWO 6 FB6
+1.14 TEC TEH 6
HOT 720UL BOBBIN 0.23 143 P2 TWO 9 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN 76 62 0.25 138 P2 TWO 10 FB6
+1.18 TEC TEH 4
HOT 720UL BOBBIN 0.18 105 P2 TWD 8 FB6
-1.09 TEC TEH 4
HOT 720UL BOBBIN 0.20 110 P2 TWO 9 FB5
+1.01 TEC TEH 4
HOT 720UL BOBBIN 0.10 70 P2 TWD 5 FB4
+1.22 TEC TEH 4
HOT 720UL BOBBIN 0.33 122 P2 TWD 13 FB4
-1.09 TEC TEH 4
HOT 720UL BOBBIN 0.13 131 P2 TWD 6 FB3
-1.09 TEC TEH 4
HOT 720UL BOBBIN 76 68 0.12 78 P2 TWD 5 FB6
-1.10 TEC TEH 4
HOT 720UL BOBBIN 0.29 110 P2 TWD 12 FB4
-1.10 TEC TEH 4
HOT 720UL BOBBIN 76 70 0.19 131 P2 TWD 8 FB4
-1.10 TEC TEH 4
HOT 720UL BOBBIN 77 45 0.18 141 P2 TWD 8 FB6
+1.21 TEC TEH 5
HOT 720UL BOBBIN 0.36 115 P2 TWD 13 FB5
-1.17 TEC TEH 5
HOT 720UL BOBBIN 0.42 126 P2 TWD 15 FB4
+1.12 TEC TEH 5
HOT 720UL BOBBIN 0.17 87 P2 TWD 7 FB3
+1.21 TEC TEH 5
HOT 720UL BOBBIN 77 47 0.13 101 P2 TWD 5 FB4
+1.07 TEC TEH 6
HOT 720UL BOBBIN 0.10 88 P2 TWD 4 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN 77 49 0.18 133 P2 TWD 7 FB3
+1.17 TEC TEH 5
HOT 720UL BOBBIN 0.52 129 P2 TWD 17 FB4
+1.14 TEC TEH 5
HOT 720UL BOBBIN 0.50 123 P2 TWD 17 FB5
-1.10 TEC TEH 5
HOT 720UL BOBBIN 0.23 79 P2 TWD 9 FB6
-1.10 TEC TEH 5
HOT 720UL BOBBIN 77 51 0.23 143 P2 TWD 8 FB6
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.44 115 P2 TWD 15 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.92 111 P2 TWD 24 FB4
+1.01 TEC TEH 6
HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 11:53:38 Customer Name: DC COOK Unit 1 Component: S/G 11 Page 13 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.17 116 P2 TWD 6 FB3
+1.14 TEC TEH 6
HOT 720UL BOBBIN 77 55 0.16 97 P2 TWD 7 FB7
-1.45 TEC TEH 9
HOT 720UL BOBBIN 0.63 126 P2 TWD 20 FB6
-1.31 TEC TEH 9
HOT 720UL BOBBIN 0.23 110 P2 TWD 9 FB5
+1.05 TEC TEH 9
HOT 720UL BOBBIN 0.66 125 P2 TWD 21 FB5
-1.29 TEC TEH 9
HOT 720UL BOBBIN 1.03 119 P2 TWD 27 FB4
+1.05 TEC TEH 9
HOT 720UL BOBBIN 0.36 129 P2 TWD 13 FB3
+1.12 TEC TEH 9
HOT 720UL BOBBIN 0.24 130 P2 TWD 10 FB2
-1.29 TEC TEH 9
HOT 720UL BOBBIN 77 57 0.13 110 P2 TWD 5 FB7
+1.25 TEC TEH 6
HOT 720UL BOBBIN 0.19 78 P2 TWD 7 FB6
+1.05 TEC TEH 6
HOT 720UL BOBBIN 0.38 106 P2 TWD 13 FB6
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.60 101 P2 TWD 18 FB5
+0.92 TEC TEH 6
HOT 720UL BOBBIN 0.13 143 P2 TWD 5 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.50 101 P2 TWD 16 FB4
+1.01 TEC TEH 6
HOT 720UL BOBBIN 0.29 129 P2 TWD 10 FBI
+0.59 TEC TEH 6
HOT 720UL BOBBIN 77 63 0.12 57 P2 TWO 5 FB7
-1.09 TEC TEN 23 NOT 720UL BOBBIN 0.87 114 P2 TWD 25 FB6
-1.09 TEC TEH 23 HOT 720UL BOBBIN 0.79 115 P2 TWD 24 FBS
-1.09 TEC TEH 23 HOT 720UL BOBBIN 0.79 118 P2 TWD 23 FB4
+1.09 TEC TEH 23 HOT 720UL BOBBIN 0.33 122 P2 TWD 13 FB3
+1.22 TEC TEH 23 HOT 720UL BOBBIN 0.21 131 P2 TWD 9 FB3
-1.09 TEC TEH 23 HOT 720UL BOBBIN 0.16 112 P2 TWD 7 FB2
+1.50 TEC TEH 23 HOT 720UL BOBBIN 77 65 0.19 120 P2 TWD 8 FB4
+1.06 TEC TEH 3
HOT 720UL BOBBIN 0.15 112 P2 TWD 6 FB5
-1.01 TEC TEH 3
HOT 720UL BOBBIN 77 67 0.23 102 P2 TWD 10 FB5
-1.09 TEC TEH 23 HOT 720UL BOBBIN 0.50 112 P2 TWD 17 FB4
+0.98 TEC TEH 23 HOT 720UL BOBBIN 0.19 120 P2 TWD 8 FB3
+1.20 TEC TEH 23 HOT 720UL BOBBIN 0.10 112 P2 TWD 4 FB6
-1.31 TEC TEH 23 HOT 720UL BOBBIN 78 46 0.21 132 P2 TWD 9 FB7
+1.32 TEC TEH 5
HOT 720UL BOBBIN 0.20 140 P2 TWD 8 FB6
+1.25 TEC TEH 5
HOT 720UL BOBBIN 0.12 117 P2 TWD 5 FB6
-1.08 TEC TEH 5
HOT 720UL BOBBIN 0.40 101 P2 TWD 14 FB5
+1.17 TEC TEH 5
HOT 720UL BOBBIN 0.72 125 P2 TWD 22 FB5
-1.12 TEC TEH 5
HOT 720UL BOBBIN 0.35 117 P2 TWD 13 FB4
+1.17 TEC TEH 5
HOT 720UL BOBBIN 0.52 128 P2 TWD 17 FB4
-1.14 TEC TEH 5
HOT 720UL BOBBIN 0.30 130 P2 TWD 12 FB3
+1.23 TEC TEH 5
HOT 720UL BOBBIN 0.18 100 P2 TWD 7 FB3
-1.19 TEC TEH 5
HOT 720UL BOBBIN 0.12 122 P2 TWD 5 FB2
-1.38 TEC TEH 5
HOT 720UL BOBBIN 78 56 0.10 65 P2 TWD 4 FB5
+1.03 TEC TEH 5
HOT 720UL BOBBIN 78 60 0.08 113 P2 TWD 3 FB3
+1.16 TEC TEH 5
HOT 720UL BOBBIN 0.11 90 P2 TWD 5 FB5
+1.03 TEC TEH 5
HOT 720UL BOBBIN 78 62 0.48 128 P2 TWD 16 FB3
-1.03 TEC TEH 3
HOT 720UL BOBBIN 0.18 136 P2 TWD 8 FB3
+1.19 TEC TEH 3
HOT 720UL BOBBIN 1.41 127 P2 TWD 32 FB4
-1.08 TEC TEH 3
HOT 720UL BOBBIN 0.87 118 P2 TWD 24 FB5
+1.06 TEC TEH 3
HOT 720UL BOBBIN 0.13 118 P2 TWD 5 FB6
-1.08 TEC TEH 3
HOT 720UL BOBBIN 0.32 145 P2 TWD 12 FB6
+1.03 TEC TEH 3
HOT 720UL BOBBIN 78 66 0.17 115 P2 TWD 7 FB3
+1.12 TEC TEH 3
HOT 720UL BOBBIN 0.20 108 P2 TWD 8 FB4
-1.01 TEC TEH 3
HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 11:53:38 Component:
S/G 11 Page 14 of 16 Component: S/C 11 Page 14 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT 0.25 123 P2 TWD 10 FB4
+1.06 TEC TEH 0.31 136 P2 TWD 12 FB5
+1.03 TEC TEH 0.18 98 P2 TWD 7 FB6
+1.10 TEC TEH 78 68 0.43 111 P2 TWD 15 FB4
-1.04 TEC TEH 0.17 112 P2 TWD 7 FB5
+1.08 TEC TEH 78 70 0.12 149 P2 TWD 5 FB4
-1.01 TEC TEH UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 3
NOT 720UL BOBBIN 3
HOT 720UL BOBBIN 3
HOT 720UL BOBBIN 3
NOT 720UL BOBBIN 3
HOT 720UL BOBBIN 3
HOT 720UL BOBBIN 3
NOT 720UL--
BOBBIN--
3 NOT 720UL BOBBIN 78 72 0.15 86 P2 TWD 6 FB4
-1.08 79 39 0.15 125 P2 TWD 6 FB6
-1.23 0.21 128 P2 TWD 9 FB5
-1.23 0.17 128 P2 TWD 7 FB4
+1.12 0.21 120 P2 TWD 9 FB3
+1.19 TEC TEH TEC TEN TEC TEH TEC TEH TEC TEH 5
HOT 720UL 5
HOT 720UL 5
HOT 720UL 5
HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN 79 43 0.28 125 P2 TWD 11 FB3
+1.14 TEC TEH 5
HOT 720UL BOBBIN 0.44 125 P2 TWD 16 FB4
+1.10 TEC TEH 5
HOT 720UL BOBBIN 0.60 121 P2 TWD 19 FB5
-1.06 TEC TEH 5
HOT 720UL BOBBIN 0.39 125 P2 TWD 14 FB6
-1.10 TEC TEH 5
HOT 720UL BOBBIN 79 47 0.15 102 P2 TWD 7 FB4
+1.10 TEC TEH 5
HOT 720UL BOBBIN 79 49 0.09 51 P2 TWD 4 FB4
+1.09 TEC TEH 6
HOT 720UL BOBBIN 79 51 0.18 108 P2 TWD 7 FB7
+1.25 TEC TEH 5
HOT 720UL BOBBIN 0.33 136 P2 TWD 13 FB6
+1.21 TEC TEH 5
HOT 720UL BOBBIN 0.22 121 P2 TWD 9 FB6
-1.25 TEC TEH 5
HOT 720UL BOBBIN 0.12 109 P2 TWD 5 FB5
+1.14 TEC TEH 5
HOT 720UL BOBBIN 0.56 119 P2 TWD 18 FB5
-1.12 TEC TEH 5
HOT 720UL BOBBIN 0.83 129 P2 TWD 24 FB4
+1.03 TEC TEH 5
HOT 720UL BOBBIN 0.79 119 P2 TWD 23 FB3
+1.21 TEC TEH 5
HOT 720UL BOBBIN 79 59 0.32 135 P2 TWD 12 FB3
+1.03 TEC TEH 5
HOT 720UL BOBBIN 0.95 119 P2 TWD 26 FB4
+1.10 TEC TEH 5
HOT 720UL BOBBIN 0.54 124 P2 TWD 18 FB5
-1.01 TEC TEH 5
HOT 720UL BOBBIN 0.17 131 P2 TWD 7 FB6
-1.10 TEC TEH 5
HOT 720UL BOBBIN 79 61 0.23 134 P2 TWD 9 FB3
+1.12 TEC TEH 3
HOT 720UL BOBBIN 0.60 123 P2 TWD 19 FB4
+1.01 TEC TEH 3
HOT 720UL BOBBIN 0.78 124 P2 TWD 23 FB5
-1.08 TEC TEH 3
HOT 720UL BOBBIN 79 63 0.08 128 79 65 0.17 127 0.17 123 0.33 110 0.24 116 P2 TWD 4 FB4
+0.96 TEC TEH P2 TWD 7 FB6
-1.10 TEC TEH P2 TWD 7 FB5
-1.10 TEC TEH P2 TWD 13 FB4
+1.03 TEC TEH P2 TWD 10 FB3
+1.12 TEC TEH 4
NOT 720UL 4
HOT 720UL 4
NOT 720UL 4
HOT 720UL 4
HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 79 71 0.10 131 P2 TWD 4 FB4
+0.99 TEC TEH 3
HOT 720UL BOBBIN 80 42 0.44 105 P2 TWD 16 FB6
+1.19 TEC TEH 5
HOT 720UL BOBBIN 0.90 121 P2 TWD 25 FB5
+1.17 TEC TEH 5
HOT 720UL BOBBIN 0.12 83 P2 TWD 5 FB5
-1.06 TEC TEH 5
HOT 720UL BOBBIN 1.13 129 P2 TWD 28 FB4
-1.03 TEC TEH 5
HOT 720UL BOBBIN 1.01 123 P2 TWD 27 FB3
-1.14 TEC TEH 5
HOT 720UL BOBBIN 80 44 0.25 125 P2 TWD 10 FB3
-1.10 TEC TEH 5
HOT 720UL BOBBIN 0.73 121 P2 TWD 22 FB4
-1.10 TEC TEH 5
HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 11:53:38 Component: S/G 11 Page 15 of 16 Component: S/G 11 Page 15 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 0.22 107 P2 TWD 9 FB5
+1.10 80 48 0.24 99 P2 TWD 9 FB7
-1.09 0.17 111 P2 TWD 6 FB6
+1.18 0.87 112 P2 TWD 23 FB6
-1.09 0.30 125 P2 TWD 11 FB5
+1.07 0.26 127 P2 TWD 10 FB5
-1.09 1.39 106 P2 TWD 30 FB4
-1.05 0.55 112 P2 TWD 17 FB3
-1.07 EXT TEC TEC TEC TEC TEC TEC TEC TEC EXT UTIL 1
UTIL 2
CAL # LEG TEH 5
HOT TEN 6
NOT TEH 6
HOT TEH 6
HOT TEH 6
HOT TEH 6
HOT TEH 6
HOT TEH 6
HOT PROBE SCOPE 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 80 54 0.17 91 P2 TWD 7 FB5
+0.00 TEC TEH 9
HOT 720UL BOBBIN 0.10 121 P2 TWD 5 FB6
+0.13 TEC TEH 9
HOT 720UL BOBBIN 0.08 66 P2 TWD 4 FB4
+0.09 TEC TEH 9
HOT 720UL BOBBIN 80 60 0.14 126 P2 TWD 5 FB7
+1.12 TEC TEH 6
HOT 720UL BOBBIN 0.63 117 P2 TWD 19 FB6
+0.99 TEC TEH 6
HOT 720UL BOBBIN 0.67 I11 P2 TWD 20 FB5
+0.96 TEC TEH 6
HOT 720UL BOBBIN 0.13 115 P2 TWD 5 FB5
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.41 104 P2 TWD 14 FB4
+1.21 TEC TEH 6
HOT 720UL BOBBIN 0.64 105 P2 TWD 19 FB4
-1.10 TEC TEH 6
HOT 720UL BOBBIN 0.20 117 P2 TWD 8 FB3
+1.16 TEC TEH 6
HOT 720UL BOBBIN 81 55 0.14 142 P2 TWD 6 FB5
+1.05 TEC TEH 9
HOT 720UL BOBBIN 81 57 0.20 0.35 0.51 0.79 0.54 0.81 0.33 0.95 0.15 81 61 0.19 0.11 0.11 0.35 0.83 0.20 81 63 0.27 1.07 0.30 0.52 0.81 0.36 86 P2 TWD 8 FB7
-1.07 TEC TEH 98 P2 TWD 12 FB6
+1.03 TEC TEH 107 P2 TWD 16 FB6
-1.09 TEC TEH 112 P2 TWD 22 FB5
+1.03 TEC TEH 99 P2 TWD 17 FB5
-1.09 TEC TEH 98 P2 TWD 22 FB4
+1.07 TEC TEH 124 P2 TWD 12 FB4
-1.09 TEC TEH 107 P2 TWO 25 FB3
-1.09 TEC TEH 131 P2 TWD 6 FB2
+1.34 TEC TEH 145 P2 TWD 8 FB7
-1.09 TEC TEH 154 P2 TWD 5 FB6
+1.20 TEC TEH 119 P2 TWD 5 FB6
-1.09 TEC TEH 142 P2 TWD 13 FB5
-1.09 TEC TEH 107 P2 TWD 24 FB4
+1.09 TEC TEH 106 P2 TWD 8 FB3
+1.09 TEC TEH 134 P2 TWD 11 FB7
-1.09 TEC TEH 112 P2 TWD 28 FB6
-1.09 TEC TEH 118 P2 TWD 12 FB5
+1.24 TEC TEH 138 P2 TWD 18 FB5
-1.09 TEC TEH 111 P2 TWD 24 FB4
+1.11 TEC TEH 143 P2 TWD 14 FB3
-1.09 TEC TEH 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 6
HOT 720UL BOBBIN 4
NOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 4
HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 NOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 82 46 0.20 151 P2 TWD 8 FB7 0.33 116 P2 TWD 12 FB6 0.20 148 P2 TWD 8 FB6 0.94 108 P2 TWD 26 FB5 0.24 80 P2 TWD 10 FB5 1.20 120 P2 TWD 29 FB4 0.48 125 P2 TWD 17 FB3 0.10 164 P2 TWD 5 FB4 82 50 0.23 103 P2 TWD 9 FB7 0.53 130 P2 TWD 18 FB6
+1.32
+1.32
-1.21
+1.12
-1.17
-1.12
-1.19
+1.19 TEC TEC TEC TEC TEC TEC TEC TEC TEH TEH TEH TEH TEH TEH TEH TEH 55 5
5 5
5 5
5 HOT HOT HOT HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
+1.36 TEC TEN
+1.21 TEC TEH 5
HOT 720UL 5
HOT 720UL
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 11:53:39 Component: S/G 11 Page 16 of 16 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE 0.20 84 P2 TWD 8 FB6
-1.30 1.20 127 P2 TWD 29 FB5
+1.17 0.25 148 P2 TWD 10 FB5
-1.19 0.19 72 P2 TWD 8 FB4
+1.23 1.04 117 P2 TWD 27 FB4
-1.17 0.63 106 P2 TWD 20 FB3
-1.19 82 52 0.40 131 P2 TWD 14 FB7
-1.27 0.20 76 P2 TWD 8 FB6
+1.32 0.52 126 P2 TWD 18 FB6
-1.23 1.07 121 P2 TWD 28 FB5
+1.12 0.28 97 P2 TWD 11 FB5
-1.16 0.14 145 P2 TWD 6 FB4
+1.14 1.03 131 P2 TWD 27 FB4
-1.01 0.88 125 P2 TWD 25 FB3
-1.19 82 60 0.23 137 P2 TWD 9 FB4
-1.01 TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL TEC TEH 5
HOT 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH 5
5 5
5 HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 0.19 93 P2 TWD 8 FB5
+1.01 TEC TEH 0.25 104 P2 TWD 10 FB6
+1.03 TEC TEH 83 49 0.12 93 P2 TWD 5 FB6
+1.14 TEC TEH 5
HOT 5
HOT 5
HOT 6
HOT Total Tubes
- 233 Total Records:
674 to Enclosure to AEP-NRC-2013-90 Unit 1 2013 Steam Generator Tube Inspection Report SG 12 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/15/13 10:37:25 Customer Name:
DC COOK Unit 1 Component: S/G 12 Page 1 of 12 TWD Indications QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 1
47 0.15 53 P2 TWD 7 07C
-0.93 TEC TEH LAR 36 HOT 720CL BOBBIN 0.06 103 P2 TWD 3 07C
+1.13 TEC TEH LAR 36 HOT 720CL BOBBIN 1
63 0.20 136 P2 TWD 7 06C
+1.05 08C TEC LAR 5
COLD 720UL BOBBIN 1
67 0.20 97 P2 TWD 7 07C
-1.61 08C TEC LAR 5
COLD 720UL BOBBIN 1
87 0.23 109 P2 TWD 9 07C
-1.01 08C TEC LAR 4
COLD 720UL BOBBIN 2
50 0.13 50 P2 TWD 7 07C
-1.43 TEC TEN LAR 42 NOT 720CL BOBBIN 3
77 0.10 78 P2 TWD 4 06C
+1.25 TEC TEH LAR 34 HOT 720CL BOBBIN 24 10 0.11 74 P2 TWD 6 EB5
+1.65 TEC TEN 29 NOT 720UL BOBBIN 29 57 0.17 71 P2 TWD 7 016
+0.77 TEC TEH LAR 24 HOT 720UL BOBBIN 31 21 0.12 147 P2 TWD 6 FB6
-1.01 TEC TEH 29 HOT 720UL BOBBIN 31 35 0.20 133 P2 TWD 9 03H
-0.61 TEC TEN LAR 21 HOT 720UL BOBBIN 34 58 0.11 141 P2 TWD 7 04H
-0.80 TEC TEH LAR 24 HOT 720UL BOBBIN 37 51 0.09 153 P2 TWD 4 05W
+0.57 TEC TEH LAR 21 HOT 720UL BOBBIN 0.11 143 P2 TWD 9 07H
+0.59 TEC TEH LAR 21 HOT 720UL BOBBIN 37 61 0.11 39 P2 TWO 6 FB4
+1.08 TEC TEN 23 HOT 720UL BOBBIN 38 52 0.11 51 P2 TWD 5 FB4
-1.07 TEC TEH 22 HOT 720UL BOBBIN 39 45 0.21 126 P2 TWD 9 FB3
+0.65 TEC TEH 22 HOT 720UL BOBBIN 42 64 0.18 102 P2 TWD 7 03H
+0.59 TEC TEH LAR 24 HOT 720UL BOBBIN 42 74 0.07 84 P2 TWO 3 FB6
-0.79 TEC TEN 24 NOT 720UL BOBBIN 43 63 0.16 108 P2 TWO 7 FB3
-1.99 TEC TEN 24 NOT 720UL BOBBIN 45 51 0.20 163 P2 TWO 9 FB4
+0.99 TEC TEN 21 NOT 720UL BOBBIN 46 48 0.13 29 P2 TWD 6 FB5
+1.06 TEC TEH 8
HOT 720UL BOBBIN 0.17 35 P2 TWD 7 FB4
-1.21 TEC TEH 8
HOT 720UL BOBBIN 46 64 0.16 128 P2 TWD 6 FB3
+0.84 TEC TEH 21 HOT 720UL BOBBIN 46 66 0.15 107 P2 TWD 6 FB5
+1.08 TEC TEH 11 HOT 720UL BOBBIN 46 68 0.13 25 P2 TWD 5 FB4
-1.12 TEC TEH 11 HOT 720UL BOBBIN 47 67 0.12 40 P2 TWD 5 FB5
-1.2S TEC TEH 11 HOT 720UL BOBBIN 0.12 30 P2 TWD S FB4
+1.08 TEC TEH 21 HOT 720UL BOBBIN 48 48 0.09 136 P2 TWO 4 04N
+0.42 TEC TEN LAR 7
NOT 720UL BOBBIN 49 51 0.19 49 P2 TWD 8 FB5
-1.04 TEC TEH 7
HOT 720UL BOBBIN 0.18 91 P2 TWD 8 FB4
+0.95 TEC TEH 7
HOT 720UL BOBBIN 49 71 0.22 126 P2 TWD 9 FB4
+1.10 TEC TEH 11 HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 10:37:25 Component: S/G 12 Page 2 of 12 Component: SIG 12 Page 2 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG 50 24 0.16 154 P2 TWD 8 04H
+0.53 TEC TEH LAR 29 HOT 53 67 0.14 141 P2 TWD 6 03H
-1.65 TEC TEH LAR 11 HOT 54 54 0.09 60 P2 TWD 4 FB5
+0.00 TEC TEH 20 HOT 54 60 0.07 156 P2 TWD 3 FB4
+0.51 TEC TEH 9
HOT 55 47 0.11 35 P2 TWD 5 FB4
+1.17 TEC TEH 8
HOT 55..87.0.17...99..P2...T.....7.....N...0.46......TEC.......TEN........LAR.......26......NOT....
55 87 0.17 99 P2 TWD 7 03H
.+0.46 TEC TEH LAR 26 HOT PROBE SCOPE 720UL BOBBIN
.BOBBIN............
720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 56 56 0.23 45 P2 TWD 9 FB6
-1.42 TEC TEH 10 HOT 0.21 128 P2 TWD 8 FB5
+1.16 TEC TEH 10 HOT 0.16 137 P2 TWD 7 FB5
-1.12 TEC TEH 10 HOT 0.34 142 P2 TWD 12 FB4
+1.18 TEC TEH 10 HOT 0.28 136 P2 TWD 11 FB4
-1.16 TEC TEH 10 HOT 0.23 79 P2 TWO 9 FB3
+1.25 TEC TEH 10 HOT 56 86 0.40 123 P2 TWO 14 03H
+0.90 TEC TEH LAR 25 HOT 57 53 0.46 117 P2 TWD 16 FB4
-1.37 TEC TEH 7
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 57 55 0.29 119 P2 TWD 11 FB4
+1.46 TEC TEH 20 HOT 720UL BOBBIN 57 59 0.18 121 P2 TWD 7 FB5
+1.07 TEC TEH 10 HOT 720UL BOBBIN 0.23 67 P2 TWD 9 FB4
-1.23 TEC TEH 10 HOT 720UL BOBBIN 58 46 0.11 37 P2 TWD 5 FB4
-1.19 TEC TEH 8
HOT 720UL BOBBIN 58 48 0.11 42 P2 TWD 4 FB5
+0.64 TEC TEH 8
HOT 720UL BOBBIN 58 52 0.14 0.19 0.13 0.14 58 54 0.32 0.68 0.59 0.29 59 45 0.13 0.11 0.16 0.11 0.17 95 P2 TWO 6 FB5 92 P2 TW 8
FB4 130 P2 TWD 6 FB4 119 P2 TWD 6 FB3 87 P2 TWD 12 FB6 108 P2 TWD 21 FB5 101 P2 TWD 19 FB4 106 P2 TWD 11 FB3
+1.02 TEC
+0.93 TEC
-1.30 TEC
+1.13 TEC
-0.04 TEC
-0.04 TEC
-0.07 TEC
-0.07 TEC TEH TEH TEH TEH TEH TEH TEH TEH 7
HOT 720UL 7
HOT 720UL 7
HOT 720UL 7
HOT 720UL 20 NOT 720UL 20 HOT 720UL 20 HOT 720UL 20 HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 112 55 81 54 96 P2 TWD 6 FB6
-1.39 P2 TWD 5 FB5
+1.02 P2 TWD 7 FB5
-1.37 P2 TWD 5 FB4
+1.08 P2 TWD 7 FB4
-1.39 TEC TEN TEC TEH TEC TEH TEC TEH TEC TEH 7
NOT 7
HOT 7
HOT 7
HOT 7
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 59 63 0.11 76 P2 TWD 5 FB6
-1.41 TEC TEH 9
HOT 720UL BOBBIN 0.32 108 P2 TWD 13 FB5
-1.24 TEC TEH 9
HOT 720UL BOBBIN 0.20 76 P2 TWD 9 FB4
+1.04 TEC TEH 9
HOT 720UL BOBBIN 0.12 126 P2 TWD 6 FB3
+1.08 TEC TEH 9
HOT 720UL BOBBIN 60 48 0.22 115 P2 TWO 9 FB4
-1.13 TEC TEH 7
HOT 720UL BOBBIN 0.10 43 P2 TWD 5 FB3
-1.24 TEC TEH 7
HOT 720UL BOBBIN 60 54 0.08 20 P2 TWD 4 FB3
-0.70 TEC TEH 19 HOT 720UL BOBBIN 60 60 0.08 52 P2 TWI) 4 FB5
-1.12 TEC TEH 10 HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 10:37:25 Component: S/G 12 Page 3 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.14 155 P2 TWD 6 FB4
+1.25 TEC TEH 10 HOT 720UL BOBBIN 60 66 0.13 125 P2 TWD 6 03H
-1.73 TEC TEH LAR 12 HOT 720UL BOBBIN 61 47 0.13 127 P2 TWD 6 FB4
+1.15 TEC TEH 7
HOT 720UL BOBBIN 61 49 0.10 88 P2 TWD 5 FB5
-1.22 TEC TEH 7
HOT 720UL BOBBIN 61 51 0.31 116 P2 TWD 12 FB6
+1.08 TEC TEH 0.26 107 P2 TWD 10 FB5
+1.08 TEC TEH 0.31 115 P2 TWD 12 FB5
-1.24 TEC TEH 0.36 97 P2 TWD 13 FB4
+1.06 TEC TEH 0.29 120 P2 TWD 11 FB4
-1.22 TEC TEH 0.21 116 P2 TWD 9 FB3
+1.24 TEC TEH 0.12 128 P2 TWD 5 FB3
-1.30 TEC TEH 61 55 0.21 127 P2 TWD 9 FB6
-1.33 TEC TEH 0.25 132 P2 TWD 10 FB5
-1.22 TEC TEH 0.15 117 P2 TWD 7 FB4
+1.02 TEC TEH 0.41 92 P2 TWD 15 FB4
-1.22 TEC TEH 62 46 0.23 90 P2 TWD 9 FB6
+1.19 TEC TEH 0.35 99 P2 TWD 12 FB5
+1.19 TEC TEH 0.14 73 P2 TWD 5 FB5
-1.16 TEC TEH 0.58 103 P2 TWD 18 FB4
+1.16 TEC TEH 0.32 79 P2 TWD 12 FB4
-1.16 TEC TEH 0.37 102 P2 TWD 13 FB3
-1.32 TEC TEH 62 50 0.43 126 P2 TWD 15 FB6
+1.08 TEC TEH 0.53 120 P2 TWD 18 FB5
+0.91 TEC TEH 0.13 128 P2 TWD 6 FB5
-1.22 TEC TEH 0.43 108 P2 TWD 15 FB4
+1.06 TEC TEH 0.48 117 P2 TWD 16 FB4
-1.28 TEC TEH 0.21 90 P2 TWD 9 FB3
+1.24 TEC TEH 62 52 0.59 118 P2 TWD 19 FB4
-1.17 TEC TEH 0.19 92 P2 TWD 8 FB3
-1.35 TEC TEH 0.21 128 P2 TWO 9 FB6
+1.15 TEC TEH 0.27 97 P2 TWD 11 FB6
-1.39 TEC TEH 0.34 103 P2 TWD 13 FB5
+1.08 TEC TEH 0.80 126 P2 TWD 23 FB5
-1.28 TEC TEH 0.56 115 P2 TWD 18 FB4
+0.97 TEC TEH 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 20 NOT 720UL BOBBIN 20 HOT 720UL BOBBIN 20 HOT 720UL BOBBIN 20 HOT 720UL BOBBIN B
HOT 720UL BOBBIN 8
NOT 720UL BOBBIN 8
HOT 720UL BOBBIN 8
HOT 720UL BOBBIN 8
HOT 720UL BOBBIN 8
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
NOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
NOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 62 66 0.32 129 P2 TWD 12 03H
-1.70 TEC TEH LAR 63 43 0.12 40 P2 TWD 5 FB4
+1.19 TEC TEH 63 47 0.13 Il1 P2 TWD 5 FB6
+1.21 TEC TEH 0.13 102 P2 TWD 5 FB5
+1.30 TEC TEH 0.28 95 P2 TWD 10 FB5
-1.12 TEC TEH 0.47 92 P2 TWD 15 FB4
+1.16 TEC TEH 0.15 127 P2 TWD 6 FB3
+1.27 TEC TEH 63 53 0.13 124 P2 TWD 5 FB6
+1.16 TEC TEH 0.38 88 P2 TWD 13 FB6
-1.05 TEC TEH 0.75 95 P2 TWD 21 FB5
-1.01 TEC TEH 0.34 79 P2 TWD 12 FB4
+1.14 TEC TEH 0.54 93 P2 TWD 17 FB4
-1.01 TEC TEH 0.15 133 P2 TWD 6 FB3
+1.27 TEC TEH 11 HOT 720UL BOBBIN 7
HOT 720UL BOBBIN 8
8 8
8 8
8 8
8 8
8 8
HOT HOT HOT HOT HOT HOT HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 10:37:25 Component: S/G 12 Page 4 of 12 Component: S/C 12 Page 4 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG 0.37 108 P2 TWD 13 FB3
-1.05 TEC TEH 8
HOT PROBE SCOPE 720UL BOBBIN 63 55 0.10 69 P2 TWD 5 FB4
+1.56 64 38 0.12 79 P2 TWD 5 FB4
-1.13 64 44 0.33 119 P2 TWD 12 FB5
+1.10 0.46 119 P2 TWD 16 FB4
-1.19 0.12 108 P2 TWD 5 FB3
-1.39 64 48 0.17 77 P2 TWD 7 FB4
-1.10 64 52 0.15 63 P2 TWD 6 FB5
+1.12 0.44 68 P2 TWD 15 FB4
+1.10 TEC TEH 19 HOT 720UL BOBBIN TEC TEN 7
NOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEN 7
NOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN 64 54 0.14 59 0.82 107 0.55 90 64 56 0.15 66 0.59 ii 0.20 134 1.09 116 0.36 102 0.73 104 0.47 127 0.14 133 0.14 86 P2 TWD 7 FB6 P2 TWD 24 FB5 P2 TWD 19 FB4 P2 TWD 6 FB7 P2 TWD 18 FB6 P2 TWD 8 FB6 P2 TWD 26 FB5 P2 TWD 13 FB5 P2 TWD 21 FB4 P2 TWD 16 FB4 P2 TWD 6 FB3 P2 TWD 6 FB3
+0.00
+0.00
+0.00
+1.49
+1.09
-1.23
+1.05
-1.12
+1.16
-1.07
+1.09
-1.16 TEC TEH TEC TEH TEC TEH 19 HOT 720UL 19 HOT 720UL 19 HOT 720UL TEC TEC TEC TEC TEC TEC TEC TEC TEC TEH TEH TEH TEH TEH TEH TEH TEH TEH 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 64 66 0.14 157 P2 TWD 6 FB4
-1.29 TEC TEH 12 HOT 720UL BOBBIN 65 41 0.17 89 P2 TWD 7 FB4
+1.21 TEC TEH 8
HOT 720UL BOBBIN 65 47 0.15 91 P2 TWD 6 FB6
-1.26 TEC TEH 0.17 100 P2 TWD 7 FB5
+1.06 TEC TEH 0.18 98 P2 TWD 8 FB5
-1.33 TEC TEH 0.24 102 P2 TWD 10 FB4
+1.08 TEC TEH 0.17 107 P2 TWD 7 FB4
-1.17 TEC TEH 0.15 134 P2 TWD 7 FB3
+1.17 TEC TEH 65 51 0.28 100 P2 TWD 11 FB5
+0.95 TEC TEH 0.11 58 P2 TWD 5 FB4
+1.04 TEC TEH 0.15 90 P2 TWD 6 FB4
-1.15 TEC TEH 65 61 0.08 63 P2 TWD 4 FB2
-1.99 TEC TEH 66 40 0.20 91 P2 TWD 8 FB6
+1.23 TEC TEH 0.54 95 P2 TWD 17 FB5
+1.16 TEC TEH 0.33 79 P2 TWD 12 FB4
-1.16 TEC TEH 0.17 102 P2 TWD 7 FB3
-1.27 TEC TEH 7
7 7
7 7
7 HOT HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 7
HOT 720UL 7
HOT 720UL 7
HOT 720UL 10 HOT 720UL 8
HOT 720UL 8
HOT 720UL 8
HOT 720UL 8
HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 66 44 0.14 46 P2 TWD 5 FB4
-1.10 TEC TEH 8
HOT 720UL BOBBIN 66 58 0.11 137 P2 TWD 5 FB5
-1.30 TEC TEH 9
HOT 720UL BOBBIN 0.19 97 P2 TWD 8 FB4
+0.99 TEC TEH 9
HOT 720UL BOBBIN 66 60 0.10 127 P2 TWD 5 FB6
-1.28 TEC TEH 9
HOT 720UL BOBBIN 0.19 136 P2 TWD 8 FB5
+1.08 TEC TEH 9
HOT 720UL BOBBIN 0.30 130 P2 TWD 12 FB5
-1.28 TEC TEH 9
HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 10:37:25 Component:
S/G 12 Page 5 of 12 Component: SIG 12 Page 5 of 12 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 0.50 134 P2 TWD 18 FB4
+0.99 0.26 139 P2 TWD 11 FB3
+0.97 66 66 0.21 52 P2 TWD 8 FB5
-1.21 0.14 56 P2 TWD 6 FB4
+1.10 66 74 0.13 58 P2 TWD 7 FB4
-1.23 67 39 0.15 72 P2 TWD 6 FB4
+1.18 67 41 0.17 80 P2 TWD 7 FB5
-1.26 0.17 87 P2 TWD 7 FB4
+1.17 0.18 86 P2 TWD 8 FB4
-1.19 67 43 0.11 59 P2 TWD 5 FB6
-1.21 0.30 100 P2 TWD 12 FB5
-1.19 0.23 96 P2 TWD 9 FB4
+1.08 0.14 73 P2 TWD 6 FB3
+1.17 EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE TEC TEH 9
HOT 720UL BOBBIN TEC TEH 9
HOT 720UL BOBBIN
.................. TEC.......TEN.......11.....HOT......................BOBBIN........
TEC TEH 11 HOT 720UL BOBBIN TEC TEH 11 HOT 720UL BOBBIN TEC TEH 13 HOT TEC TEH TEC TEN TEC TEH TEC TEH TEC TEH TEC TEN TEC TEH TEC TEH 8
HOT 7
NOT 7
HOT 7
HOT 7
HOT 7
NOT 7
HOT 7
HOT 720UL BOBBIN BOBBIN...........
720UL BOBBIN BOBBIN...........
720UL BOBBIN 720UL BOBBIN 720UL BOBBIN BOBBIN...........
720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 67 45 0.12 76 P2 TWD 5 FB4
+1.08 TEC 67 47 0.20 85 P2 TWD 8 FB7
-1.47 TEC 0.12 78 P2 TWD 5 FB6
+1.28 TEC 0.38 92 P2 TWD 13 FB6
-1.28 TEC 0.62 98 P2 TWD 19 FB5
+1.17 TEC 0.27 98 P2 TWD 10 FB5
-1.17 TEC 0.53 93 P2 TWD 17 FB4
+1.28 TEC 0.23 99 P2 TWD 9 FB3
+1.28 TEC TEH 7
HOT 720UL BOBBIN TEH 8
HOT 720UL BOBBIN TEH 8
HOT 720UL BOBBIN TEH 8
HOT 720UL BOBBIN TEH 8
HOT 720UL BOBBIN TEH 8
HOT 720UL BOBBIN TEH 8
HOT 720UL BOBBIN TEH 8
HOT 720UL BOBBIN 67 49 0.20 105 P2 TWD 8 FB6
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.13 80 P2 TWD 5 FB6
-1.25 TEC TEH 8
HOT 720UL BOBBIN 0.15 77 P2 TWD 6 FB5
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.62 98 P2 TWD 18 FB5
-1.21 TEC TEH 8
HOT 720UL BOBBIN 0.36 74 P2 TWD 13 FB4
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.20 65 P2 TWD 8 FB4
-1.19 TEC TEH 8
HOT 720UL BOBBIN 0.21 121 P2 TWD 8 FB3
+1.23 TEC TEH 8
HOT 720UL BOBBIN 67 53 0.19 118 P2 TWD 7 FB6
+1.25 TEC TEH 8
HOT 720UL BOBBIN 0.32 117 P2 TWD 11 FB6
-1.08 TEC TEH 8
HOT 720UL BOBBIN 0.77 97 P2 TWD 21 FB5
-1.06 TEC TEH 8
HOT 720UL BOBBIN 0.67 77 P2 TWD 19 FB4
+1.08 TEC TEH 8
HOT 720UL BOBBIN 0.46 98 P2 TWD 15 FB4
-1.08 TEC TEH 8
HOT 720UL BOBBIN 0.36 85 P2 TWD 13 FB3
+1.34 TEC TEH 8
HOT 720UL BOBBIN 67 55 0.20 76 P2 TWD 9 FB6
+1.05 TEC TEH 19 HOT 720UL BOBBIN 0.32 118 P2 TWD 13 FB6
-1.32 TEC TEH 19 HOT 720UL BOBBIN 0.29 109 P2 TWD 12 FB5
+1.19 TEC TEH 19 HOT 720UL BOBBIN 0.74 109 P2 TWD 23 FB5
-1.10 TEC TEH 19 HOT 720UL BOBBIN 0.50 123 P2 TWD 18 FB4
+1.05 TEC TEH 19 HOT 720UL BOBBIN 0.49 101 P2 TWD 17 FB4
-1.21 TEC TEH 19 HOT 720UL BOBBIN 0.21 131 P2 TWD 9 FB3
-1.25 TEC TEH 19 HOT 720UL BOBBIN 67 57 0.22 120 P2 TWD 9 FB6
-1.28 TEC TEH 9
HOT 720UL BOBBIN 0.12 80 P2 TWD 6 FB5
+1.03 TEC TEH 9
HOT 720UL BOBBIN 0.23 141 P2 TWD 10 FB5
-1.21 TEC TEH 9
HOT 720UL BOBBIN 0.17 88 P2 TWD 8 FB4
+0.99 TEC TEH 9
HOT 720UL BOBBIN 0.18 106 P2 TWD 8 FB4
-1.23 TEC TEH 9
HOT 720UL BOBBIN 67 59 0.10 50 P2 TWD 5 FB6
+1.26 TEC TEH 9
HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 10:37:25 Component:
S/G 12 Page 6 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG 0.11 98 P2 TWD 5 FB5
-0.97 TEC TEH 9
HOT 0.23 114 P2 TWD 10 FB4
+1.08 TEC TEH 9
HOT 67 61 0.28 127 P2 TWD 12 FB6
+1.28 TEC TEH 9
HOT 0.11 108 P2 TWD 5 FB6
-1.43 TEC TEH 9
HOT 1.10 122 P2 TWD 28 FB5
-1.10 TEC TEH 9
HOT 0.44 105 P2 TWD 16 FB4
+1.01 TEC TEH 9
HOT 0.26 118 P2 TWD 11 FB4
-1.17 TEC TEH 9
HOT 0.19 142 P2 TWD 8 FB3
-1.36 TEC TEH 9
HOT 67 63 0.48 133 P2 TWD 17 FB6
-1.32 TEC TEH 9
HOT 0.11 77 P2 TWD 5 FB5
+1.06 TEC TEH 9
HOT 0.70 120 P2 TWD 22 FB5
-1.21 TEC TEH 9
HOT 0.25 141 P2 TWD 11 FB4
+1.10 TEC TEH 9
HOT 0.26 121 P2 TWD 11 FB4
-1.23 TEC TEH 9
HOT 0.27 129 P2 TWD 11 FB3
-1.26 TEC TEH 9
HOT 67 65 0.15 141 P2 TWD 6 FB6
-1.36 TEC TEH 12 HOT 0.43 96 P2 TWD 15 FB5
-1.18 TEC TEH 12 HOT 0.33 115 P2 TWD 12 FB4
+0.98 TEC TEH 12 HOT 0.14 52 P2 TWD 6 FB3
+1.16 TEC TEH 12 HOT PROBE SCOPE 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 67 67 0.16 153 P2 TWD 7 FB4
+1.09 TEC TEH 12 HOT 720UL BOBBIN 0.12 42 P2 TWD 5 FB5
-1.09 TEC TEH 12 HOT 720UL BOBBIN 67 69 0.18 57 P2 TWD 7 FB5
-1.14 TEC TEH 11 HOT 720UL BOBBIN 0.18 109 P2 TWD 7 FB4
+1.08 TEC TEH 11 HOT 720UL BOBBIN 67 77 0.11 114 P2 TWD 5 FB7
-0.88 TEC TEH 14 HOT 720UL BOBBIN 68 40 0.32 109 P2 TWD 12 FB5
+1.06 TEC TEH 7
HOT 720UL BOBBIN 0.44 114 P2 TWD 15 FB4
-1.21 TEC TEH 7
HOT 720UL BOBBIN 68 42 0.10 61 P2 TWD 5 FB6
-1.35 TEC TEH 7
HOT 720UL BOBBIN 0.19 105 P2 TWD 8 FB5
+1.17 TEC TEH 7
HOT 720UL BOBBIN 0.37 119 P2 TWD 14 FB4
-1.11 TEC TEH 7
HOT 720UL BOBBIN 68 44 0.26 122 P2 TWO 10 FB6
+i.Ii TEC TEH 7
HOT 720UL BOBBIN 0.09 42 P2 TWD 4 FB6
-1.28 TEC TEH 7
HOT 720UL BOBBIN 0.70 121 P2 TWD 21 FB5
+1.06 TEC TEH 7
HOT 720UL BOBBIN 0.22 113 P2 TWD 9 FB5
-1.26 TEC TEH 7
HOT 720UL BOBBIN 0.22 I1i P2 TWD 9 FB4
+1.04 TEC TEH 7
HOT 720UL BOBBIN 0.90 112 P2 TWD 24 FB4
-1.22 TEC TEH 7
HOT 720UL BOBBIN 0.11 42 P2 TWD 5 FB3
+1.22 TEC TEH 7
HOT 720UL BOBBIN 0.27 97 P2 TWO 11 FB3
-1.46 TEC TEH 7
HOT 720UL BOBBIN 68 56 0.15 29 P2 TWD 6 FB4
+1.03 TEC TEH 10 HOT 720UL BOBBIN 68 64 0.27 0.11 0.16 0.12 68 66 0.20 68 68 0.17 0.16 0.14 105 P2 TWD 10 FB5
-1.08 TEC TEH 11 HOT 720UL BOBBIN 42 P2 TWO 5 FB4
+1.04 TEC TEH 11 HOT 720UL BOBBIN 107 P2 TWO 7 FB4
-1.21 TEC TEH 11 HOT 720UL BOBBIN 142 P2 TWD 5 FB3
+1.19 TEC TEH 11 HOT 720UL BOBBIN 75 P2 TWD 8 FB5
-1.18 TEC TEH 12 HOT 720UL BOBBIN 46 P2 TWD 7 FB5
+0.79 TEC TEH 12 HOT 720UL BOBBIN 118 P2 TWO 7 FB4
-1.33 TEC TEH 12 HOT 720UL BOBBIN 139 P2 TWD 6 FB3
+1.36 TEC TEH 12 HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 10:37:26 Component:
S/G 12 Page 7 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 68 70 0.13 53 P2 TWD 5 FB6
+1.15 TEC TEH 11 HOT 720UL BOBBIN 0.20 69 P2 TWD 8 FB5
+1.01 TEC TEH 11 HOT 720UL BOBBIN 0.13 53 P2 TWD 5 FB4
+1.10 TEC TEH 11 HOT 720UL BOBBIN 0.18 38 P2 TWD 7 FB4
-1.34 TEC TEH 11 HOT 720UL BOBBIN 68 76 0.10 121 P2 TWD 4 FB6
-0.66 TEC TEH 14 HOT 720UL BOBBIN 69 39 0.10 94 P2 TWD 5 FB4
+0.99 TEC TEH 7
HOT 720UL BOBBIN 69 41 0.11 107 P2 TWD 4 FB5
-1.10 TEC TEH 8
HOT 720UL BOBBIN 0.18 73 P2 TWD 7 FB4
+1.10 TEC TEH 8
HOT 720UL BOBBIN 0.14 59 P2 TWD 5 FB3
+1.25
-1.17
+1.02 TEC TEH HOT 720UL BOBBIN 69 49 0.26 100 P2 TWD 10 FB5 0.16 75 P2 TWD 7 FB4 69 51 0.38 0.11 0.46 0.13 0.32 0.30 0.11 69 53 0.14 0.23 0.51 0.91 0.71 0.77 0.73 0.13 0.13 109 P2 TWD 14 FB6
-1.24 124 P2 TWD 5 FB5
+1.08 116 P2 TWD 16 FB5
-1.22 83 P2 TWD 6 FB4
+1.08 114 P2 TWD 12 FB4
-1.28 102 P2 TWD 12 FB3
+1.02 71 P2 TWD 5 FB7
-1.37 91 P2 TWD 6 FB7
-1.55 113 P2 TWD 9 FB6
+1.13 118 P2 TWD 17 FB6
-1.26 120 P2 TWD 25 FB5
-1.22 116 P2 TWD 21 FB4
+1.02 123 P2 TWD 22 FB4
-1.33 119 P2 TWD 22 FB3
+1.08 101 P2 TWD 6 FB3
-1.46 142 P2 TWD 6 FB2
-1.52 TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEN 7
NOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEN 7
NOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEN 12 NOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEN 12 NOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN 69 59 0.21 109 P2 TWD 8 FB5
-1.10 69 69 0.29 0.14 0.26 0.15 69 71 0.20 124 P2 TWD 11 FB5
+0.96 134 P2 TWD 6 FB4
+1.05 126 P2 TWD 10 FB4
-1.23 80 P2 TWD 6 FB3
+1.31 52 P2 TWD 8 FB4
+1.06 69 73 0.12 63 P2 TWD 6 FB4
+0.99 TEC TEH 13 HOT 720UL BOBBIN 70 48 0.17 0.15 70 52 0.18 0.12 0.18 0.85 0.13 0.11 53 P2 TWD 7 FB5
+1.10 48 P2 TWD 6 FB4
+1.10 110 P2 TWD 8 FB6
+1.02 104 P2 TWD 5 FB5
+1.22 117 P2 TWD 8 FB5
-1.15 110 P2 TWD 23 FB4
+1.06 71 P2 TWD 6 FB3
+1.15 102 P2 TWD 5 FB3
-1.31 TEC TEH TEC TEH TEC TEN TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH 8
HOT 8
HOT 7
NOT 7
HOT 7
HOT 7
HOT 7
HOT 7
HOT 20 HOT 20 HOT 20 HOT 20 HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 70 54 0.22 89 P2 TWD 9 FB7 0.70 93 P2 TWD 21 FB6 1.23 101 P2 TWD 29 FB5 0.84 80 P2 TWD 24 FB4
-0.07 TEC TEN
-0.13 TEC TEH
-0.09 TEC TEH
-0.09 TEC TEH
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 10:37:26 Component: S/G 12 Page 8 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.26 82 P2 TWD 11 FB3
+0.00 TEC TEH 20 HOT 720UL BOBBIN 70 60 0.17 138 P2 TWD 8 FB6
-1.25 TEC TEH 9
HOT 720UL BOBBIN 0.54 120 P2 TWD 19 FB5
+0.99 TEC TEH 9
HOT 720UL BOBBIN 0.54 128 P2 TWD 19 FB4
-1.08 TEC TEH 9
HOT 720UL BOBBIN 70 62 0.32 0.57 0.08 0.54 0.26 105 121 ill 117 146 P2 P2 P2 P2 P2 TWD 1 TWD 1 TWD 4 TWD 1 TWD 1 TWD 1 TWD 2 TWD 2 TWD 7 TWD 7 70 64 0.41 105 P2 0.81 113 P2 0.84 129 P2 0.16 101 P2 0.16 37 P2 2
FB6
+1.21 TEC TEH 10 HOT 720UL BOBBIN 8
FB5
+1.18 TEC TEH 10 HOT 720UL BOBBIN FB5
-1.16 TEC TEH 10 HOT 720UL BOBBIN 7
FB4
-1.16 TEC TEH 10 HOT 720UL BOBBIN 0
FB3
-1.36 TEC TEH 10 HOT 720UL BOBBIN 4
PB6
+1.03 TEC TEN 12 NOT 720UL BOBBIN 2
FBS
+1.01 TEC TEH 12 HOT 720UL BOBBIN 3
FB4
-1.25 TEC TEH 12 HOT 720UL BOBBIN FB3
-1.40 TEC TEH 12 HOT 720UL BOBBIN FB3
+1.16 TEC TEH 12 HOT 720UL BOBBIN FB5
+0.99 TEC TEH 12 HOT 720UL BOBBIN FB4
-1.18 TEC TEH 12 HOT 720UL BOBBIN 70 70 0.18 123 P2 TWD 7 0.22 92 P2 TWD 9 70 74 0.09 86 P2 TWD 5 FB6
-0.79 TEC TEH 13 HOT 720UL BOBBIN 71 53 0.20 115 P2 TWD 8 FB4
+1.41 TEC TEH 8
HOT 720UL BOBBIN 71 71 0.12 73 P2 TWD 5 0.18 97 P2 TWD 7 0.14 86 P2 TWD 6 FB5 FB4 FB3 71 75 0.09 0.15 58 P2 TWD 5 FB5 113 P2 TWD 8 FB4
-1.25 TEC TEH 12 HOT 720UL BOBBIN
+1.07 TEC TEH 12 HOT 720UL BOBBIN
-1.25 TEC TEH 12 HOT 720UL BOBBIN
-1.17 TEC TEN 13 NOT 720UL BOBBIN
+0.90 TEC TEH 13 HOT 720UL BOBBIN
+1.04 TEC TEH 7
HOT 720UL BOBBIN
-1.26 TEC TEH 7
HOT 720UL BOBBIN
-1.30 TEC TEH 7
HOT 720UL BOBBIN 72 40 0.36 119 P2 TWD 13 FB5 0.48 115 P2 TWD 16 FB4 0.12 70 P2 TWD 5 FB3 72 44 0.11 109 P2 TWD 5 FB6
+1.15 TEC 0.31 115 P2 TWD 12 FB5
+0.97 TEC 0.38 118 P2 TWD 14 FB4
-1.24 TEC 0.17 104 P2 TWD 7 FB3
-1.37 TEC 72 46 0.10 149 P2 TWD 4 FB2
+0.64 TEC 72 50 0.15 75 P2 TWD 6 FB6
-1.25 TEC 0.42 87 P2 TWD 14 FB5
+1.08 TEC 0.27 74 P2 TWD 10 FB4
+1.12 TEC 0.41 86 P2 TWD 14 FB4
-1.10 TEC 0.12 114 P2 TWD 5 FB3
+1.21 TEC TEH TEH TEH TEH TEN TEN TEN TEH TEH TEH 7
HOT 7
HOT 7
HOT 7
HOT 7
HOT 8
NOT 8
HOT 8
HOT 8
HOT 8
HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 72 52 0.63 0.69 0.58 1.31 0.21 0.47 0.78 0.71 0.30 97 94 94 92 96 108 102 99 103 P2 P2 P2 P2 P2 P2 P2 P2 P2 TWD 19 TWD 20 TWD 18 TWD 28 TWD 8 TWD 15 TWD 21 TWD 20 TWD 11 FB6 FB5 FB4 FB4 FB7 FB6 FB5 FB3 FB2
+1.19
+1.12
+1.19
-1.10
-1.45
-1.28
-1.21
-1.23
+1.45 TEC TEC TEC TEC TEC TEC TEC TEC TEC TEH TEH TEH TEH TEH TEH TEH TEH TEH 8
8 8
8 8
8 8
8 8
HOT HOT HOT HOT HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 10:37:26 Component: S/G 12 Page 9 of 12 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 72 66 0.11 49 P2 TWD 5 FB5
-1.21 TEC TEH 11 HOT 720UL BOBBIN 0.11 27 P2 TWD 4 FB4
+1.01 TEC TEH 11 HOT 720UL BOBBIN 73 43 0.13 45 P2 TWD S FB4
+1.12 TEC TEN 8
NOT 720UL BOBBIN 73 45 0.11 125 P2 TWD 5 FB6
-1.32 TEC TEH 8
HOT 720UL BOBBIN 0.18 113 P2 TWD 7 FB5
-1.12 TEC TEH 8
HOT 720UL BOBBIN 0.13 95 P2 TWD 5 FB4
+1.12 TEC TEH 8
HOT 720UL BOBBIN 0.17 89 P2 TWD 7 FB3
+1.21 TEC TEH 8
HOT 720UL BOBBIN 73 47 0.21 93 P2 TWD 9 FB6
-1.28 0.11 31 P2 TWD 5 FB5
+1.17 0.17 59 P2 TWD 7 FB5
-1.15 0.16 53 P2 TWD 7 FB3
+1.24 73 51 0.20 ' 56 P2 TWD 8 FB6
-1.11 0.45 106 P2 TWD 16 FB5
-1.06 0.14 48 P2 TWD 6 FB4
+1.19 0.41 114 P2 TWD 15 FB4
-1.24 0.11 55 P2 TWD 5 FB3
+1.30 0.33 114 P2 TWD 13 FB3
-1.30 73 57 0.13 70 P2 TWD 5 FB6
+1.25 0.47 107 P2 TWD 16 FB6
-1.20 0.15 70 P2 TWD 6 FB5
+1.11 0.59 114 P2 TWD 18 FB5
-1.09 0.28 94 P2 TWD 11 FB4
+1.11 0.32 112 P2 TWD 12 FB4
-1.31 0.12 123 P2 TWD 5 FB3
-1.27 TEC TEH 7
HOT TEC TEH 7
HOT TEC TEH 7
HOT TEC TEH 7
HOT TEC TEN 7
NOT TEC TEH 7
HOT TEC TEH 7
HOT TEC TEH 7
HOT TEC TEH 7
HOT TEC TEH 7
HOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720OUt 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 73 61 0.10 64 P2 TWD 4 FB5
-1.14 TEC TEH 10 HOT 720UL BOBBIN 0.13 87 P2 TWD 5 FB4
+1.10 TEC TEH 10 HOT 720UL BOBBIN 73 63 0.24 116 P2 TWD 9 FB5
-1.25 TEC TEH 10 HOT 720UL BOBBIN 0.20 124 P2 TWD 8 FB4
+1.07 TEC TEH 10 HOT 720UL BOBBIN 73 65 0.30 93 P2 TWO 11 FB6
-1.23 TEC TEN 11 NOT 720UL BOBBIN 0.38 94 P2 TWD 13 FBS
-1.23 TEC TEH 11 HOT 720UL BOBBIN 0.37 91 P2 TWD 13 FB4
+1.06 TEC TEH 11 HOT 720UL BOBBIN 0.19 27 P2 TWD 7 FB3
+1.17 TEC TEH 11 HOT 720UL BOBBIN 73 67 0.14 52 P2 TWD 6 FB6
-1.40 TEC TEH 11 HOT 720UL BOBBIN 0.25 104 P2 TWD 10 FB5
+1.03 TEC TEH 11 HOT 720UL BOBBIN 0.34 103 P2 TWD 12 FB5
-1.21 TEC TEH 11 HOT 720UL BOBBIN 0.38 118 P2 TWD 13 FB4
+0.97 TEC TEH 11 HOT 720UL BOBBIN 0.36 74 P2 TWD 13 FB4
-1.16 TEC TEH 11 HOT 720UL BOBBIN 0.28 75 P2 TWD 11 FB3
-1.34 TEC TEH 11 HOT 720UL BOBBIN 73 69 0.20 86 P2 TWD 8 FB5
-1.18 TEC TEH 12 HOT 720UL BOBBIN 0.27 102 P2 TWD 10 FB4
+1.05 TEC TEH 12 HOT 720UL BOBBIN 74 44 0.29 124 P2 TWD 11 FB5
+0.97 TEC TEH 8
HOT 720UL BOBBIN 0.53 85 P2 TWD 17 FB4
-1.12 TEC TEH 8
HOT 720UL BOBBIN 74 46 0.11 50 P2 TWD 5 FB6
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.44 89 P2 TWD 15 FB5
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.21 59 P2 TWD 8 FB4
-1.08 TEC TEH 8
HOT 720UL BOBBIN 74 58 0.22 116 P2 TWD 9 FB5
-1.14 TEC TEH 9
HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 10:37:26 Component: S/G 12 Page 10 of 12 QUERY: QueryMl ROW COL VOLTS DEG 0.18 87 74 60 0.20 129 0.29 129 0.27 113 0.52 136 0.36 131 0.38 114 0.26 118 CHN IND %TW LOCATION EXT EXT UT P2 TWD 8 FB4
-1.17 TEC TEH P2 TWD 9 FB6
+1.14 TEC TEH P2 TWD 12 FB6
-1.28 TEC TEH P2 TWD 11 FB5
+1.12 TEC TEH P2 TWD 18 FB5
-1.19 TEC TEH P2 TWD 14 FB4
+1.03 TEC TEH P2 TWD 15 FB4
-1.30 TEC TEH P2 TWD 11 FB3
+1.14 TEC TEH IL 1
UITIL 2
CAL # LEG PROBE 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 74 62 0.14 80 P2 TWD 6 FB4
-1.40 0.12 92 P2 TWD 5 FB5
+0.96 74 68 0.17 48 P2 TWD 7 FB4
-1.14 75 37 0.16 134 P2 TWD 6 FB5
-1.16 0.18 103 P2 TWD 7 FB4
+1.08 0.14 88 P2 TWD 6 FB3
+1.14 TEC TEN 10 NOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 11 HOT 720UL BOBBIN TEC TEN 8
NOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN 75 39 0.11 101 P2 TWD 5 FB4
+1.10 TEC TEH 8
HOT 720UL BOBBIN 75 53 0.42 93 P2 TWD 14 FB6
+1.14 TEC TEH 8
HOT 720UL BOBBIN 0.21 63 P2 TWO 8 FB6
-1.05 TEC TEH 8
HOT 720UL BOBBIN 0.64 90 P2 TWD 19 FB5
-1.08 TEC TEH 8
HOT 720UL BOBBIN 0.87 108 P2 TWD 23 FB4
-1.08 TEC TEH 8
HOT 720UL BOBBIN 0.77 94 P2 TWD 21 FB3
-1.08 TEC TEH 8
HOT 720UL BOBBIN 75 67 0.17 115 P2 TWD 7 FB6
-1.37 TEC TEH 12 HOT 720UL BOBBIN 0.46 126 P2 TWD 16 FB5
-1.13 TEC TEH 12 HOT 720UL BOBBIN 0.68 121 P2 TWD 20 FB4
+1.09 TEC TEH 12 HOT 720UL BOBBIN 0.18 88 P2 TWD 7 FB3
-1.35 TEC TEH 12 HOT 720UL BOBBIN 75 69 0.20 94 P2 TWD 8 FB4
+1.08 TEC TEH 11 HOT 720UL BOBBIN 76 38 0.11 76 P2 TWD 5 FB4
-1.10 TEC TEH 7
HOT 720UL BOBBIN 76 40 0.24 111 P2 TWD 10 FB5
+1.04 TEC TEH 76 60 0.18 102 P2 TWD 7 FB5
+1.12 TEC TEH 0.20 62 P2 TWD 8 FB4
-1.09 TEC TEH 76 62 0.12 44 P2 TWD 6 FB4
-1.10 TEC TEH 7
NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 9
HOT 720UL BOBBIN 76 64 0.16 89 0.56 115 0.11 101 1.44 104 1.49 116 0.13 125 0.22 58 76 66 0.09 72 0.15 56 76 68 0.09 140 0.50 133 0.53 137 0.12 138 P2 TWD 7 FB7
+1.28 P2 TWD 18 FB6
+0.88 P2 TWD 5 FB6
-1.19 P2 TWD 30 FB5
+0.99 P2 TWD 30 FB4
-1.10 P2 TWD 5 FB3
+1.34 P2 TWD 9 FB3
-1.32 P2 TWD 4 FB5
+1.08 P2 TWD 6 FB4
+1.03 P2 TWD 4 FB6
+1.09 P2 TWD 16 FB5
+1.07 P2 TWD 17 FB4
-1.16 P2 TWD 5 FB3
+1.16 TEC TEH 11 HOT 720UL TEC TEH 11 HOT 720UL TEC TEH 11 HOT 720UL TEC TEH 11 HOT 720UL TEC TEH 11 HOT 720UL TEC TEH 11 HOT 720UL TEC TEH 11 HOT 720UL TEC TEN 11 NOT 720UL TEC TEN 11 NOT 720UL TEC TEN 12 NOT 720UL TEC TEH 12 HOT 720UL TEC TEH 12 HOT 720UL TEC TEH 12 HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 10:37:26 Component: S/G 12 Page 11 of 12 Component: S/G 12 Page 11 of 12 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 76 70 0.13 119 P2 TWD 5 FB4
-1.10 76 72 0.12 97 P2 TWD 5 FB5
+1.03 0.23 92 P2 TWD 9 FB4
-1.27 EXT EXT UTIL 1
UTIL 2
TEC TEH CAL # LEG PROBE SCOPE 11 HOT 720UL BOBBIN 14 HOT 720UL BOBBIN 14 HOT 720UL BOBBIN TEC TEH TEC TEH 77 37 0.17 108 P2 TWD 7 FB5
-1.13 TEC TEH 7
HOT 720UL BOBBIN 0.11 72 P2 TWD 5 FB4
+1.00 TEC TEH 7
HOT 720UL BOBBIN 77 39 0.15 125 P2 TWD 6 FB5
-1.28 TEC TEH 7
HOT 720UL BOBBIN 0.13 88 P2 TWD 6 FB4
+1.00 TEC TEH 7
HOT 720UL BOBBIN 77 43 0.17 90 P2 TWD 7 FB7
-1.45 TEC TEH 8
HOT 720UL BOBBIN 0.53 103 P2 TWD 17 FB6
-1.16 TEC TEH 8
HOT 720UL BOBBIN 1.43 93 P2 TWD 29 FB5
-1.14 TEC TEH 8
HOT 720UL BOBBIN 0.93 83 P2 TWD 24 FB4
+1.12 TEC TEH 8
HOT 720UL BOBBIN 0.64 97 P2 TWD 19 FB3
+1.21 TEC TEH 8
HOT 720UL BOBBIN 0.11 139 P2 TWD 5 FB2
+1.45 TEC TEH 8
HOT 720UL BOBBIN 77 57 0.24 88 P2 TWO 9 FB6
+1.16 TEC TEH 10 HOT 720UL BOBBIN 0.55 114 P2 TWD 17 FB5
+1.12 TEC TEH 10 HOT 720UL BOBBIN 0.25 103 P2 TWD 10 FB5
-1.07 TEC TEH 10 HOT 720UL BOBBIN 0.25 118 P2 TWD 10 FB4
+1.18 TEC TEH 10 HOT 720UL BOBBIN 0.46 103 P2 TWD 15 FB4
-1.16 TEC TEH 10 HOT 720UL BOBBIN 0.34 98 P2 TWD 12 FB3
-1.20 TEC TEH 10 HOT 720UL BOBBIN 77 61 0.45 119 P2 TWD 15 FB6
-1.31 TEC TEH 10 HOT 720UL BOBBIN 0.70 102 P2 TWD 20 FB5
+0.99 TEC TEH 10 HOT 720UL BOBBIN 0.25 126 P2 TWD 10 FB5
-1.18 TEC TEH 10 HOT 720UL BOBBIN 0.24 110 P2 TWD 9 FB4
+1.09 TEC TEH 10 HOT 720UL BOBBIN 0.49 100 P2 TWD 16 FB4
-1.14 TEC TEH 10 HOT 720UL BOBBIN 0.86 116 P2 TWD 23 FB3
+1.20 TEC TEH 10 HOT 720UL BOBBIN 77 63 0.12 120 P2 TWD 5 FB4
+1.18 TEC TEH 10 HOT 720UL BOBBIN 77 65 0.14 122 P2 TWD 6 FB6
-1.17 TEC TEH 11 HOT 720UL BOBBIN 0.23 52 P2 TWD 9 FB5
-1.12 TEC TEH 11 HOT 720UL BOBBIN 0.17 77 P2 TWD 7 FB4
+1.03 TEC TEH 11 HOT 720UL BOBBIN 77 67 0.21 0.55 0.96 0.49 0.70 0.12 78 44 0.21 0.23 1.48 0.23 0.84 0.28 0.29 78 54 0.22 0.18 0.11 78 64 0.21 0.17 95 P2 TWD 8 FB7
-1.41 TEC TEH 11 HOT 720UL BOBBIN 113 P2 TWD 17 FB6
-1.36 TEC TEH 11 HOT 720UL BOBBIN i11 P2 TWD 24 FB5
-1.21 TEC TEH 11 HOT 720UL BOBBIN 109 P2 TWD 16 FB4
+1.12 TEC TEH 11 HOT 720UL BOBBIN 115 P2 TWD 20 FB3
-1.32 TEC TEH 11 HOT 720UL BOBBIN 59 P2 TWD 5 FB2
-1.49 TEC TEH 11 HOT 720UL BOBBIN 94.. P2.. TWD...8 6..
+1. 12........TEC.........TEN 8.....NOT..
BOBBIN 94 P2 TWD 8 FB6
+1.12 TEC TEH 8
HOT 720UL BOBBIN 55 P2 TWD 9 FB6
-1.10 TEC TEH 8
HOT 720UL BOBBIN 95 P2 TWD 30 FB5
+1.05 TEC TEH 8
HOT 720UL BOBBIN 49 P2 TWD 9 FB4
+0.97 TEC TEH 8
HOT 720UL BOBBIN 91 P2 TWD 22 FB4
-1.23 TEC TEH 8
HOT 720UL BOBBIN 69 P2 TWD 10 FB3
+1.25 TEC TEH 8
HOT 720UL BOBBIN 118 P2 TWD 11 FB3
-1.32 TEC TEH 8
HOT 720UL BOBBIN 60.. P2.. TWO...9....
6...
- 0. 0.....TEC........
TEN.........19.......NOT...
BOBBIN 60 P2 TWD 9 FB6
+0.00 TEC TEH 19 HOT 720UL BOBBIN 57 P2 TWD 8 FB5
+0.00 TEC TEH 19 HOT 720UL BOBBIN 33 P2 TWD 5 FB4
+0.00 TEC TEH 19 HOT 720UL BOBBIN 106 P2 TWD 8 FB4
-1.16 TEC TEH 12 HOT 720UL BOBBIN 116 P2 TWD 7 FB3
+1.36 TEC TEH 12 HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 10:37:26 Component: S/G 12 Page 12 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 0.12 55 P2 TWD 5 FB6 0.22 112 P2 TWD 9 FB5 78 66 0.34 119 P2 TWD 12 FB5 0.50 111 P2 TWD 17 FB4 79 49 0.12 70 P2 TWD 5 FB5 0.12 26 P2 TWD 5 FB4 79 51 0.59 85 P2 TWD 18 FB4 0.30 95 P2 TWD 11 FB6 0.44 90 P2 TWD 14 FB5 EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE
+1.10 TEC TEH 12 HOT 720UL
+1.10 TEC TEH 12 HOT 720UL
+1.00 TEC TEH 12 HOT 720UL
-1.26 TEC TEH 12 HOT 720UL
+1.19 TEC TENH.
8 NOT 720UL
+1.03 TEC TEH 8
HOT 720UL
+1.10 TEC TEH 8
HOT 720UL
-1.21 TEC TEN 8
NOT 720UL
-1.16 TEC TEH 8
HOT 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 79 55 0.09 83 P2 TWD 5 FB4
+1.52 TEC TEH 19 HOT 720UL BOBBIN 79 61 0.73 133 P2 TWD 22 FB6
-1.19 0.96 124 P2 TWD 26 FB5
-1.17 0.66 124 P2 TWD 21 FB4
+0.97 0.07 157 P2 TWD 3 FB4
-1.26 0.37 126 P2. TWD 14 FB3
-1.34 80 50 0.16 123 P2 TWD 6 FB6
+1.19 0.12 75 P2 TWD 5 FB6
-1.47 0.13 45 P2 TWD 5 FB5
+1.06 0.14 27 P2 TWD 6 FB4
-1.25 TEC TEC TEC TEC TEC TEC TEC TEC TEC TEH TEH TEH TEH TEH TEH TEH TEH TEH 9
HOT 720UL BOBBIN 9
HOT 720UL BOBBIN 9
HOT 720UL BOBBIN 9
HOT 720UL BOBBIN 9
HOT 720UL BOBBIN 8
NOT 720UL BOBBIN 8
HOT 720UL BOBBIN 8
HOT 720UL BOBBIN 8
HOT 720UL BOBBIN Total Tubes
- 175 Total Records: 500 to Enclosure to AEP-NRC-2013-90 Unit 1 2013 Steam Generator Tube Inspection Report SG 13 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/16/13 18:15:24 Customer Name:
DC COOK Unit 1 Component: S/G 13 Page 1 of 12 TWD Indications QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 1
35 0.19 0
P2 TWD 8 05C
+1.20 08C TEC LAR 2
COLD 720UL BOBBIN 1
59 0.14 0
P2 TWD 7 05C
+1.11 08C TEC LAR 1
COLD 720UL BOBBIN 0.14 0
P2 TWD 6 06C
+1.15 08C TEC LAR 1
COLD 720UL BOBBIN 0.15 0
P2 TWD 7 06C
-1.54 08C TEC LAR 1
COLD 720UL BOBBIN 1
69 0.17 116 P2 TWD 9 08H
+1.35 08C TEH LAR 36 HOT 720CL BOBBIN 1
71 0.15 102 P2 TWD 8 FB8
+1.34 08C TEH 36 HOT 720CL BOBBIN 0.18 137 P2 TWD 9 08C
+1.30 08C TEH LAR 36 HOT 720CL BOBBIN 0.20 0
P2 TWD 9 05C
-1.37 08C TEC 1
COLD 720UL BOBBIN 0.12 0
P2 TWD 5 06C
+1.04 08C TEC LAR 1
COLD 720UL BOBBIN 0.14 0
P2 TWD 6 06C
-1.39 08C TEC LAR 1
COLD 720UL BOBBIN 1
81 0.08 129 P2 TWD 4 FBI
+0.75 08C TEH 36 HOT 720CL BOBBIN 1
103 0.12 132 P2 TWD 6 08H
+0.40 08C TEH LAR 40 HOT 720CL BOBBIN 2
74 0.14 87 P2 TWD 7 07C
-1.55 TEC TEH LAR 31 HOT 720CL BOBBIN 2
86 0.12 95 P2 TWO 6 06C
-1.51 TEC TEN LAR 35 NOT 720CL BOBBIN 2
88 0.09 146 P2 TWD 4 07C
-1.51 TEC TEH LAR 35 HOT 720CL BOBBIN 3
31 0.14 0
P2 TWD 6 05C
+0.89 08C TEC LAR 1
COLD 720UL BOBBIN 0 20 0
P2 TWD 9 06C
+0.89 08C TEC LAR 1
COLD 720UL BOBBIN 3
67 0.12 85 P2 TWO 6 08C
-1.42 TEC TEN LAR 29 NOT 720CL BOBBIN 3
69 0.14 122 P2 TWD 7 04C
+1.34 TEC TEN LAR 31 NOT 720CL BOBBIN 3
79 0.15 89 P2 TWO 7 07C
-1.49 TEC TEN LAR 31 NOT 720CL BOBBIN 3
83 0.13 107 P2 TWD 6 07C
-1.58 TEC TEH LAR 31 HOT 720CL BOBBIN 3
89 0.11 126 P2 TWD 5 07C
-1.47 TEC TEH LAR 34 HOT 720CL BOBBIN 4
78 0.19 55 P2 TWD 9 08C
-1.53 TEC TEH LAR 31 HOT 720CL BOBBIN 12 92 0.10 101 P2 TWO 5 EBB
-0.70 TEC TEN 33 NOT 720CL BOBBIN 27 101 0.13 129 P2 TWD 7 F06
-1.23 TEC TEH 17 HOT 720CL BOBBIN 30 70 0.23 71 P2 TWO 11 FBS
+1.05 TEC TEN 25 NOT 720UL BOBBIN 33 65 0.08 98 P2 TWD 5 FB4
-1.51 TEC TEH 24 HOT 720UL BOBBIN 37 43 0.11 124 P2 TWO 6 FB4
+1.43 TEC TEN 23 NOT 720UL BOBBIN 38 54 0.14 17 P2 TWO 7 FB4
+0.00 TEC TEN 12 NOT 720UL BOBBIN 42 42 0.21 123 P2 TWD 10 0H
-1.64 TEC TEH LAR 23 HOT 720UL BOBBIN 43 69 0.09 160 P2 TWD 5 FB4
+1.31 TEC TEH 2S HOT 720UL BOBBIN 44 48 0.12 142 P2 TWD 5 FB6
+1.99 TEC TEH 22 HOT 720UL BOBBIN 44 S6 0.11 144 P2 TWD 5 04N
-1.82 TEC TEH LAR 23 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/16/13 18:15:24 Component: S/G 13 Page 2 of 12 QUERY: QueryMl ROW COL VOLTS 44 66 0.11 46 74 0.13 48 54 0.11 DEG CHN IND %TW LOCATION 141 P2 TWD 5 FB4
+1.25 116 P2 TWD 5 FB6
+1.86 33 P2 TWD 5 FB4
+0.00 EXT EXT UTIL 1
UTIL 2
TEC TEH TEC TEH TEC TEH CAL # LEG 22 HOT 10 HOT 12 HOT PROBE SCOPE 720UL BOBBIN 7200L BOBBIN 720UL BOBBIN 48 56 0.13 50 P2 TWD 6 FB4 48 62 0.08 85 P2 TWD 5 FB4 48 66 0.10 161 P2 TWD 4 FB4 49 63 0.26 86 P2 TWD 12 FB5 0.17 45 P2 TWD 9 FBS 0.14 143 P2 TWD 8 FB4 0.26 122 P2 TWD 13 FB4 50 66 0.07 137 P2 TWD 4 FB6
+1.12 TEC TEH 8
HOT 720UL BOBBIN
-1.39 TEC TEH
-1.24 TEC TEN
+1.04 TEC TEH
-1.28 TEC TEN
+1.17 TEC TEH
-1.35 TEC TEH 9
HOT 8
HOT 9
HOT 9
HOT 9
HOT 9
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN
-0.82 52 44 0.23 131 P2 TWD 11 FB3
+0.60 52 92 0.11 124 P2 TWD 6 FB6
+1.12 53 49 0.22 114 P2 TWD 11 FB5
-1.17 53 51 0.13 50 P2 TWD 7 FB4
+1.08 53 61 0.13 129 P2 TWD 7 03H
-1.82 TEC TEN 9
NOT 720UL BOBBIN TEC TEH 7
HOT 720UL BOBBIN TEC TEH 15 HOT 720UL BOBBIN TEC TEN 7
NOT TEC TEH 7
HOT TEC TEH LAR 9
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 53 63 0.20 152 P2 TWD 10 0.11 43 P2 TWD 6 0.14 145 P2 TWD 7 FB5 FB4 FB4
+0.90 TEC TEN 9
NOT 720UL BOBBIN
+1.04 TEC TEH 9
HOT 720UL BOBBIN
-1.30 TEC TEH 9
HOT 720UL BOBBIN 54 52 0.35 0.21 54 60 0.14 0.24 54 72 0.12 0.12 55 41 0.12 0.19 81 P2 TWD 13 FB5
+1.10 TEC TEH 8
HOT 720UL BOBBIN 51 P2 TWD 9 FB4
-1.12 TEC TEH 8
HOT 720UL BOBBIN 142 P2 TWD 6 FB5
+1.10 TEC TEH 8
HOT 720UL BOBBIN 129 P2 TWD 10 FB4
-1.24 TEC TEH 8
HOT 720UL BOBBIN 36 P2 TWD 5 FB6
-0.87 TEC TEH 10 HOT 720UL BOBBIN 27 P2 TWD 5 FB4
-1.08 TEC TEH 10 HOT 720UL BOBBIN 76 P2 TWD 6 FB6
+1.77 TEC TEH 6
HOT 720UL BOBBIN 48 P2 TWD 8 FB4
+1.03 TEC TEH 6
HOT 720UL BOBBIN 55 55 0.11 30 P2 TWD 5 FB4
+0.98 TEC TEH 12 HOT 720UL BOBBIN 55 63 0.10 80 P2 TWD 4 FB5
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.22 134 P2 TWD 9 FB4
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.13 46 P2 TWD 6 FB4
-1.21 TEC TEH 8
HOT 720UL BOBBIN 56 56 0.09 97 P2 TWD 4 FB4
-0.64 TEC TEH 8
HOT 720UL BOBBIN 56 70 0.09 94 P2 TWD 5 FB4
-1.19 TEC TEH 9
HOT 720UL BOBBIN 56 72 0.13 59 P2 TWD 7 FB6
-0.84 TEC TEH 11 HOT 720UL BOBBIN 57 41 0.23 143 P2 TWD 11 FB7
+2.26 TEC TEH 7
HOT 720UL BOBBIN 0.16 147 P2 TWD 9 FB5
-1.20 TEC TEH 7
HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/16/13 18:15:24 Component: S/G 13 Page 3 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.11 153 P2 TWD 6 FB4
+1.11 TEC TEH 7
HOT 720UL BOBBIN 57 57 0.10 144 P2 TWD 5 FB5
+0.93 TEC TEH 9
HOT 720UL BOBBIN 0.09 82 P2 TWD 5 FB4
-1.17 TEC TEH 9
HOT 720UL BOBBIN 0.08 159 P2 TWD 4 FB4
+1.10 TEC TEH 9
HOT 720UL BOBBIN 57 59 0.15 56 P2 TWD 8 FB4
+1.17 TEC TEH 9
HOT 720UL BOBBIN 58 58 0.13 46 P2 TWD 5 FB4
+1.10 TEC TEH 8
HOT 720UL BOBBIN 0.11 96 P2 TWD 5 FB3
-1.33 TEC TEH 8
HOT 720UL BOBBIN 58 62 0.10 84 P2 TWD 4 FB4
+1.17 TEC TEH 8
HOT 720UL BOBBIN 58 64 0.37 92 P2 TWD 13 FB5
+1.06 0.10 123 P2 TWD 4 FB5
-1.22 0.30 118 P2 TWD 11 FB4
-1.20 58 66 0.17 55 P2 TWD 9 FB4
-1.24 58 68 0.12 123 P2 TWD 7 FB4
-1.28 58 70 0.13 61 P2 TWD 6 FB4
-1.17 TEC TEN 8
NOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 9
HOT 720UL BOBBIN TEC TEN 9
NOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN 58 72 0.15 54 P2 TWD 6 FB4
-1.10 TEC TEH 10 HOT 720UL BOBBIN 59 51 0.11 142 P2 TWD 5 FB5
-1.15 TEC TEH 6
HOT 720UL BOBBIN 59 57 0.18 81 P2 TWD 7 FB5
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.12 87 P2 TWD 5 FB5
-1.10 TEC TEH 8
HOT 720UL BOBBIN 59 65 0.09 67 59 67 0.08 55 0.08 125 0.30 142 0.12 139 P2 TWD 4 FB4
+1.01 TEC TEN 8
NOT 720UL BOBBIN P2 TWD 4 FB6
+1.38 TEC TEH 8
HOT 720UL BOBBIN P2 TWO 4 PBS
-1.29 TEC TEN 8
NOT 720UL BOBBIN P2 TWD 11 FB4
+1.08 TEC TEH 8
HOT 720UL BOBBIN P2 TWD 5 FB3
+1.33 TEC TEH 8
HOT 720UL BOBBIN 59 69 0.12 160 P2 TWD 5 FB4
+1.10 TEC TEH 8
HOT 720UL BOBBIN 60 54 0.12 61 P2 TWD 6 FB6
+0.00 TEC TEH 12 HOT 720UL BOBBIN 0.23 119 P2 TWD 10 FB5
+0.00 TEC TEH 12 HOT 720UL BOBBIN 0.23 37 P2 TWD 10 FB4
+0.00 TEC TEH 12 HOT 720UL BOBBIN 0.16 56 P2 TWD 7 FB3
+0.00 TEC TEH 12 HOT 720UL BOBBIN 60 56 0.09 65 P2 TWD 4 FB6
-1.38 TEC TEH 8
HOT 720UL BOBBIN 0.12 125 P2 TWD 5 FB4
-1.17 TEC TEH 8
HOT 720UL BOBBIN 60 62 0.09 102 P2 TWD 5 FB5
-1.19 TEC TEH 9
HOT 720UL BOBBIN 0.22 147 P2 TWD 11 FB5
+1.08 TEC TEH 9
HOT 720UL BOBBIN 0.29 101 P2 TWD 13 FB4
-1.15 TEC TEH 9
HOT 720UL BOBBIN 60 68 0.13 143 P2 TWD 6 FB4
-1.13 TEC TEH 8
HOT 720UL BOBBIN 61 41 0.11 150 P2 TWO 6 FB4
+1.04 TEC TEN 7
NOT 720UL BOBBIN 61 51 0.12 143 P2 TWD 7 FB4
+1.11 TEC TEH 7
HOT 720UL BOBBIN 61 59 0.20 130 P2 TWD 10 FB6
+1.15 TEC TEH 9
HOT 720UL BOBBIN 0.34 115 P2 TWD 15 FB5
+1.04 TEC TEH 9
HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/16/13 18:15:24 Component: S/G 13 Page 4 of 12 QUERY:
QueryMl ROW COL VOLTS 0.14 0.24 0.24 0.11 0.11 DEG 144 139 ill 141 80 CHN P2 P2 P2 P2 P2 IND TWD TWD TWD TWD TWD
%TW 7
12 12 6
6 LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE FB5
-1.30 TEC FB4
+1.15 TEC FB4
-1.17 TEC FB3
+1.30 TEC FB3
-1.37 TEC FO6
+1.28 TEC FB5
+1.06 TEC FB5
-1.30 TEC FB4
+1.02 TEC TEH TEH TEH TEH TEH 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
NOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL 9
HOT 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 61 63 0.10 60 P2 TWD 6 0.18 60 P2 TWD 9 0.12 93 P2 TWD 7 0.20 69 P2 TWD 10 TEH TEH TEH TEH 61 69 0.18 80 P2 TWD 9 FB4
+0.95 TEC TEH 61 71 0.08 156 P2 TWD 5 FB4
+1.08 TEC TEH 9
HOT 720UL BOBBIN 62 50 0.11 34 P2 TWD 5 FB5
+0.97 TEC TEH 6
HOT 720UL BOBBIN 0.11 69 P2 TWD 5 FB4
-1.15 TEC TEH 6
HOT 720UL BOBBIN 62 52 0.28 63 P2 TWD 11 FB4
-1.19 TEC TEH 8
HOT 720UL BOBBIN 62 54 0.17 42 P2 TWD 8 FB4
+0.00 TEC TEH 13 HOT 720UL BOBBIN 62 56 0.11 152 P2 TWD 6 FB6
-1.30 TEC TEH 9
HOT 720UL BOBBIN 0.18 125 P2 TWD 9 FB5
+0.99 TEC TEH 9
HOT 720UL BOBBIN 0.19 70 P2 TWD 10 FB4
-1.17 TEC TEH 9
HOT 720UL BOBBIN 62 58 0.14 46 P2 TWD 6 FB5
-1.12 TEC TEH 8
HOT 720UL BOBBIN 0.29 112 P2 TWD 11 FB4
+1.19 TEC TEH 8
HOT 720UL BOBBIN 62 62 0.13 125 P2 TWD 5 FB4
-1.08 TEC TEH 8
HOT 720UL BOBBIN 62 64 0.18 95 P2 TWD 7 FB6
+1.12 TEC TEH 8
HOT 720UL BOBBIN 0.62 118 P2 TWD 19 FB5
+1.14 TEC TEH 8
HOT 720UL BOBBIN 0.24 80 P2 TWD 9 FB4
-1.19 TEC TEH 8
HOT 720UL BOBBIN 0.20 95 P2 TWD 8 FB3
-1.37 TEC TEH 8
HOT 720UL BOBBIN 62 66 0.11 116 P2 TWD 6 FB6
+1.26 TEC TEH 9
HOT 720UL BOBBIN 0.21 117 P2 TWD 11 FB6
-1.28 TEC TEH 9
HOT 720UL BOBBIN 0.19 139 P2 TWD 10 FB5
+1.12 TEC TEH 9
HOT 720UL BOBBIN 0.26 130 P2 TWD 13 FB5
-1.21 TEC TEH 9
HOT 720UL BOBBIN 0.17 99 P2 TWD 9 FB4
+1.12 TEC TEH 9
HOT 720UL BOBBIN 0.47 117 P2 TWD 19 FB4
-1.19 TEC TEH 9
HOT 720UL BOBBIN 0.18 142 P2 TWD 9 FB3
+1.19 TEC TEH 9
HOT 720UL BOBBIN 62 68 0.09 156 P2 TWO 5 FB4
-1.15 TEC TEN 9
NOT 720UL BOBBIN 62 70 0.11 138 P2 TWD 5 FB4
-1.17 TEC TEH 8
HOT 720UL BOBBIN 62 72 0.12 59 P2 TWD 5 FBS
+0.96 TEC TEH 10 HOT 720UL BOBBIN 62 74 0.08 59 P2 TWD 4 FB7
-0.95 TEC TEH 10 HOT 720UL BOBBIN 0.07 138 P2 TWD 4 FB6
-0.86 TEC TEH 11 HOT 720UL BOBBIN 63 45 0.13 81 P2 TWD 6 FB3
+1.22 TEC TEH 6
HOT 720UL BOBBIN 63 51 0.10 82 P2 TWD 5 FB5
-1.13 TEC TEH 6
HOT 720UL BOBBIN 63 55 0.53 118 P2 TWD 18 FB5
+1.18 TEC TEH 0.17 49 P2 TWD 8 FB5
-1.11 TEC TEH 12 NOT 720UL BOBBIN 12 HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:24 Customer Name: DC COOK Unit 1 Component: S/G 13 Page 5 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE
.======
======= 1
============T=E
TEN-
=
12 HOT--
BOBBIN-
-=----
0.39 142 P2 TWD 15 FB4
-1.09 TEC TEH 12 HOT 720UL BOBBIN 0.10 141 P2 TWD 5 FB3
-1.42 TEC TEH 12 HOT 720UL BOBBIN 63 57 0.23 101 P2 TWD 9 FB5
+1.15 TEC TEH 8
HOT 720UL BOBBIN 0.33 93 P2 TWD 12 FB4
-1.19 TEC TEH 8
HOT 720UL BOBBIN 63 59 0.11 33 P2 TWD 5 FB6
+1.30 TEC TEH 8
HOT 720UL BOBBIN 0.32 86 P2 TWD 12 FB5
+1.07 TEC TEH 8
HOT 720UL BOBBIN 0.34 89 P2 TWD 13 FB5
-1.14 TEC TEH 8
HOT 720UL BOBBIN 0.32 131 P2 TWD 12 FB4
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.29 130 P2 TWD 11 FB4
-1.17 TEC TEH 8
HOT 720UL BOBBIN 0.11 123 P2 TWD 5 FB3
+1.21 TEC TEH 8
HOT 720UL BOBBIN 0.13 137 P2 TWO 5 FB3
-1.28 TEC TEH 8
HOT 720UL BOBBIN 63 61 0.35 136 P2 TWD 13 FB6
-1.38 TEC TEH 8
HOT 720UL BOBBIN 0.58 124 P2 TWD 18 FB5
-1.15 TEC TEH 8
HOT 720UL BOBBIN 0.78 114 P2 TWD 22 FB4
+1.08 TEC TEH 8
HOT 720UL BOBBIN 0.18 121 P2 TWD 8 FB3
+1.31 TEC TEH 8
HOT 720UL BOBBIN 63 63 0.16 139 P2 TWD 7 FB6
-1.49 TEC TEH 8
HOT 720UL BOBBIN 0.24 134 P2 TWD 9 FB5
-1.17 TEC TEH 8
HOT 720UL BOBBIN 0.11 43 P2 TWD 5 FB4
+1.10 TEC TEH 8
HOT 720UL BOBBIN 0.27 84 P2 TWD 10 FB4
-1.19 TEC TEH 8
HOT 720UL BOBBIN 0.10 121 P2 TWD 4 FB3
-1.24 TEC TEH 8
HOT 720UL BOBBIN 63 65 0.11 126 P2 TWO 5 PB4
+1.17 TEC TEN 8
NOT 720UL BOBBIN 63 69 0.13 128 P2 TWD 5 FB4
+1.06 TEC TEH 8
HOT 720UL BOBBIN 63 73 0.10 31 P2 TWO 4 PB6
-0.80 TEC TEN 10 NOT 720UL BOBBIN 0.11 46 P2 TWO 5 PB4
+0.99 TEC TEN 10 NOT 720UL BOBBIN 64 50 0.14 121 P2 TWD 7 FB4
-1.22 TEC TEH 7
HOT 720UL BOBBIN 64 58 0.12 57 P2 TWD 7 FB4
-1.19 TEC TEH 9
HOT 720UL BOBBIN 0.11 147 P2 TWO 6 PFB
-1.21 TEC TEH 9
HOT 720UL BOBBIN 64 64 0.07 103 P2 TWO 4 PB4
-1.23 TEC TEN 9
NOT 720UL BOBBIN 64 68 0.19 102 P2 TWD 8 FB4
-1.20 TEC TEH 8
HOT 720UL BOBBIN 64 70 0.18 141 P2 TWO 9 PB4
-1.10 TEC TEN 9
NOT 720UL BOBBIN 64 72 0.15 55 P2 TWD 7 FB4
-1.21 TEC TEH 11 HOT 720UL BOBBIN 0.09 92 P2 TWO 5 FB6
-0.73 TEC TEN 11 NOT 720UL BOBBIN 65 45 0.20 82 P2 TWO 10 PB6
-1.31 TEC TEN 7
NOT 720UL BOBBIN 0.17 50 P2 TWO 9 FB5
-1.28 TEC TEH 7
HOT 720UL BOBBIN 0.10 145 P2 TWD 6 FB4
+1.13 TEC TEH 7
HOT 720UL BOBBIN 65 47 0.12 145 P2 TWO 7 PB4
+1.11 TEC TEN 7
NOT 720UL BOBBIN 65 55 0.86 120 P2 TWO 25 PB5
+0.90 TEC TEN 13 NOT 720UL BOBBIN 0.25 87 P2 TWD 11 FB4
-1.31 TEC TEH 13 HOT 720UL BOBBIN 0.11 143 P2 TWO 5 PB4
+1.03 TEC TEN 13 NOT 720UL BOBBIN 65 57 0.18 56 P2 TWD 9 FB4
-1.33 TEC TEH 9
HOT 720UL BOBBIN 0.10 32 P2 TWD 6 FB5
-1.28 TEC TEH 9
HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/16/13 18:15:24 Component: S/G 13 Page 6 of 12 QUERY: QueryMl ROW COL VOLTS 65 59 0.28 0.53 0.51 0.13 65 63 0.22 0.14 0.22 0.10 DEG 89 106 131 102 CHN P2 P2 P2 P2 IND TWD TWD TWD TWD TWD TWD TWD TWD
%TW 13 20 20 7
LOCATION FB6
+1.24 FB5
+1.04 FB4
+1.08 FB3
+1.26 EXT EXT UTIL 1
UTIL 2
CAL # LEG TEC TEH 9
HOT TEC TEH 9
HOT TEC TEH 9
HOT TEC TEH 9
HOT PROBE 720UL 7200L 720UL 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN 154 P2 46 P2 108 P2 72 P2 11 8
11 6
65 67 0.11 127 P2 TWD 6 0.28 65 P2 TWD 13 65 69 0.12 76 P2 TWD 7 FB5 FB4 FB4 FB3 FP4 FB5 FB4
+1.06 TEC TEH
+1.15 TEC TEH
-1.32 TEC TEH
+1.19 TEC TEH
+1.17 TEC TEH
-1.21 TEC TEH
+1.13 TEC TEH 9
HOT 9
HOT 9
HOT 9
HOT 9
NOT 9
HOT 9
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 65 71 0.15 126 P2 TWD 8 FB4
+1.21 TEC TEH 9
HOT 720UL BOBBIN 0.06 130 P2 TWD 3 FB3
+1.28 TEC TEH 9
HOT 720UL BOBBIN 66 48 0.20 149 P2 TWD 9 FB4
-1.08 TEC TEH 6
HOT 720UL BOBBIN 0.12 68 P2 TWD 6 FB3
-1.10 TEC TEH 6
HOT 720UL BOBBIN 66 52 0.14 52 P2 TWD 6 FB6
+1.24 TEC TEH 8
HOT 720UL BOBBIN 0.37 110 P2 TWD 13 FB5
+1.08 TEC TEH 8
HOT 720UL BOBBIN 0.53 106 P2 TWD 17 FB4
-1.17 TEC TEH 8
HOT 720UL BOBBIN 66 56 0.11 43 P2 TWD 6 0.14 104 P2 TWD 8 0.81 119 P2 TWD 26 0.66 103 P2 TWD 23 0.28 111 P2 TWD 13 66 60 0.14 59 P2 TWD 6 0.22 85 P2 TWD 9 0.12 120 P2 TWD 5 FB6 FB6 FB5 FB4 FB4 FB6 FB5 FB1
+1.19 TEC TEH 9
HOT
-1.33 TEC TEH 9
HOT
-1.24 TEC TEH 9
HOT
+1.10 TEC TEH 9
HOT
-1.24 TEC TEH 9
HOT
-1.37 TEC TEH 8
HOT
+1.17 TEC TEH 8
HOT
-1.83 TEC TEH 8
HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 66 62 0.13 106 P2 TWD 5 FB6
+1.51 0.12 104 P2 TWD 5 FB5
+1.15 0.44 84 P2 TWD 15 FB5
-1.10 0.13 100 P2 TWD 6 FB4
+1.10 0.26 124 P2 TWD 10 FB4
-1.08 0.12 107 P2 TWD 5 FB3
-1.21 66 66 0.19 112 P2 TWD 10 FB4
-1.17 66 68 0.13 80 P2 TWD 7 FB5
+1.17 0.15 145 P2 TWD 8 FB4
-1.15 0.11 151 P2 TWD 6 FB3
-1.32 TEC TEC TEC TEC TEC TEC TEH TEH TEH TEH TEH TEH 8
8 8
8 8
8 HOT HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN TEC TEN TEC TEH TEC TEN TEC TEH 9
NOT 720UL BOBBIN 9
HOT 720UL BOBBIN 9
NOT 720UL BOBBIN 9
HOT 720UL BOBBIN 66 70 0.15 153 P2 TWD 6 FB5
+1.18 TEC TEH 8
HOT 0.21 138 P2 TWD 8 FB4
-1.11 TEC TEH 8
HOT 66 72 0.22 36 P2 TWD 9 FB4
-1.14 TEC TEH 10 HOT 66 74 0.08 151 P2 TWD 4 FB4
-1.28 TEC TEH 11 HOT 67 43 0.25 92 P2 TWD 10 FB6
-1.40 TEC TEH 6
HOT 0.16 131 P2 TWD 7 FB5
-1.13 TEC TEH 6
HOT 0.23 65 P2 TWD 10 FB4
+1.24 TEC TEH 6
HOT 0.13 147 P2 TWD 6 FB3
+1.15 TEC TEH 6
HOT 720OUL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/16/13 18:15:25 Component: S/G 13 Page 7 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 67 53 0.11 49 P2 67 57 0.12 29 P2 0.12 72 P2 67 65 0.11 35 P2 0.26 138 P2 0.19 128 P2 0.10 155 P2 67 67 0.11 155 P2 0.14 134 P2 0.19 74 P2 68 40 0.27 97 P2 0.12 93 P2 68 42 0.13 85 P2 0.20 57 P2 0.14 71 P2 68 58 0.13 147 P2 0.13 76 P2 0.19 128 P2 0.11 137 P2 68 62 0.12 37 P2 0.15 64 P2 68 64 0.10 88 P2 TWD 5 FB4
+1.01 TWD 5
FB5
+1.01 TWD 5
FB4
-1.19 TEC TEH 8
HOT 720UL TEC TEN 8
NOT 720UL TEC TEH 8
HOT 720UL BOBBIN BOBBIN BOBBIN TWD 5
FB6
-1.36 TEC TEH 8
HOT 720UL BOBBIN TWD 10 FBS
+1.08 TEC TEH 8
HOT 720UL BOBBIN TWD 8 FB4
+1.19 TEC TEH 8
HOT 720UL BOBBIN TWD 4 FB3
+1.29 TEC TEH 8
HOT 720UL BOBBIN TWO 5 FB6
+1.19 TEC TEN 8
NOT 720UL BOBBIN TWD 6 FB5
+1.17 TEC TEH 8
HOT 720UL BOBBIN TWD 8 FB4
+1.03 TEC TEH 8
HOT 720UL BOBBIN TWD 11 FB4
-1.06 TEC TEH 6
HOT 720UL BOBBIN TWO 6 FB3
-1.10 TEC TEN 6
NOT 720UL BOBBIN TWD 6 FBS
+1.20 TEC TEH 6
HOT 720UL BOBBIN TWD 9 FB4
-1.17 TEC TEH 6
HOT 720UL BOBBIN TWD 6 FB3
-1.36 TEC TEH 6
HOT 720UL BOBBIN TWD 7 FB5
-1.17 TWD 7 FB4
+1.19 TWD 10 FB4
-1.28 TWD 6 FB3
+1.15 TWD 7 FB5
+1.08 TWD 8 FB4
-1.17 TWD 6 FB4
-1.19 TEC TEN 9
NOT 720UL BOBBIN TEC TEH 9
HOT 720UL BOBBIN TEC TEH 9
HOT 720UL BOBBIN TEC TEH 9
HOT 720UL BOBBIN TEC TEH 9
HOT 720UL BOBBIN TEC TEN 9
NOT 720UL BOBBIN TEC TEH 9
HOT 720UL BOBBIN 68 70 0.09 115 P2 TWD 5 0.10 114 P2 TWD 6 FB4 FB3 69 45 0.12 47 P2 TWD 7 FB4 69 51 0.07 102 P2 TWD 4 FB7 0.12 90 P2 TWD 7 FB5 0.13 39 P2 TWD 7 FB4 69 55 0.17 98 P2 TWD 8 FB6 0.26 122 P2 TWD 11 FB5 0.18 97 P2 TWD 8 FB4 0.39 118 P2 TWD 15 FB4 0.29 87 P2 TWD 12 FB3 69 57 0.09 108 P2 TWD 5 FBI 0.11 50 P2 TWD 6 FB4 69 59 0.33 104 P2 TWD 15 FB6 0.67 117 P2 TWD 23 FB5 0.26 110 P2 TWD 13 FB5 0.37 120 P2 TWD 16 FB4 0.27 126 P2 TWD 13 FB3
-1.17 TEC TEH 9
HOT 720UL BOBBIN
-1.19 TEC TEH 9
HOT 720UL BOBBIN
+1.06 TEC TEN 7
NOT 720UL BOBBIN
-0.33 TEC TEH 7
HOT 720UL BOBBIN
-1.26 TEC TEN 7
NOT 720UL BOBBIN
+1.33 TEC TEH 7
HOT 720UL BOBBIN
+1.14 TEC TEH 13 HOT 720UL BOBBIN
+0.90 TEC TEH 13 HOT 720UL BOBBIN
+1.14 TEC TEH 13 HOT 720UL BOBBIN
-1.21 TEC TEH 13 HOT 720UL BOBBIN
-1.34 TEC TEH 13 HOT 720UL BOBBIN
-1.97 TEC TEH 9
HOT 720UL BOBBIN
-1.28 TEC TEH 9
HOT 720UL BOBBIN
+1.19 TEC TEN 9
NOT 720UL BOBBIN
+1.06 TEC TEH 9
HOT 720UL BOBBIN
-1.26 TEC TEH 9
HOT 720UL BOBBIN
-1.24 TEC TEN 9
NOT 720UL BOBBIN
+1.19 TEC TEH 9
HOT 720UL BOBBIN 69 61 0.10 33 P2 TWD 4 FB4
+1.10 TEC TEH 8
HOT 720UL BOBBIN 69 63 0.20 95 P2 TWD 10 FB6
+1.19 TEC TEH 9
HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:25 Customer Name:
DC COOK Unit 1 Component: S/G 13 Page 8 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.47 136 P2 TWD 19 FB5
+1.08 TEC TEH 9
HOT 720UL BOBBIN 0.31 120 P2 TWD 14 FB4
+1.06 TEC TEH 9
HOT 720UL BOBBIN 0.20 93 P2 TWD 10 FB4
-1.30 TEC TEH 9
HOT 720UL BOBBIN 0.16 134 P2 TWD 8 FB3
+1.24 TEC TEH 9
HOT 720UL BOBBIN 69 65 0.24 143 P2 TWD 12 FB7
-0.82 TEC TEH 9
HOT 720UL BOBBIN 69 67 0.08 99 P2 TWD 5 FB6
+1.19 TEC TEH 9
HOT 720UL BOBBIN 0.18 108 P2 TWD 9 FB5
+1.04 TEC TEH 9
HOT 720UL BOBBIN 0.13 119 P2 TWD 7 FB3
+1.21 TEC TEH 9
HOT 720UL BOBBIN 69 69 0.15 83 P2 TWO 8 FB4
+1.13 TEC TEN 9
NOT 720UL BOBBIN 69 71 0.11 129 P2 TWD 6 FB4
+1.12 TEC TEH 9
HOT 720UL BOBBIN 0.09 110 P2 TWD 5 FB3
+1.30 TEC TEH 9
HOT 720UL BOBBIN 70 50 0.24 87 P2 TWO 10 FB5
+1.08 TEC TEH 6
HOT 720UL BOBBIN 0.22 147 P2 TWO 10 FB4
-1.10 TEC TEH 6
HOT 720UL BOBBIN 70 54 0.49 110 P2 TWD 17 FB6
+0.00 TEC TEH 12 HOT 720UL BOBBIN 0.85 109 P2 TWO 24 FB5
+0.00 TEC TEH 12 HOT 720UL BOBBIN 0.29 113 P2 TWD 12 FB3
+0.00 TEC TEH 12 HOT 720UL BOBBIN 1.27 117 P2 TWO 30 FB4
-0.02 TEC TEH 12 HOT 720UL BOBBIN 70 56 0.16 120 P2 TWD 9 FB6
-1.26 TEC TEH 9
HOT 720UL BOBBIN 0.30 142 P2 TWO 14 FB5
-1.19 TEC TEH 9
HOT 720UL BOBBIN 0.14 139 P2 TWD 7 FB4
+1.04 TEC TEH 9
HOT 720UL BOBBIN 0.15 137 P2 TWD 8 FB4
-1.24 TEC TEH 9
HOT 720UL BOBBIN 0.10 67 P2 TWO 5 FB3
+1.17 TEC TEH 9
HOT 720UL BOBBIN 0.10 146 P2 TWO 6 FB3
-1.33 TEC TEH 9
HOT 720UL BOBBIN 70 64 0.35 93 P2 TWO 13 FB6
+1.26 TEC TEH 8
HOT 720UL BOBBIN 0.17 143 P2 TWO 7 FB6
-1.28 TEC TEH 8
HOT 720UL BOBBIN 0.70 117 P2 TWO 21 FB5
+1.05 TEC TEH 8
HOT 720UL BOBBIN 0.10 61 P2 TWO 4 FB5
-1.08 TEC TEH 8
HOT 720UL BOBBIN 0.29 81 P2 TWD 11 FB4
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.46 131 P2 TWD 16 FB4
-1.17 TEC TEH 8
HOT 720UL BOBBIN 0.14 69 P2 TWD 6 PB3
+1.24 TEC TEH 8
HOT 720UL BOBBIN 0.16 126 P2 TWD 7 FB3
-1.19 TEC TEH 8
HOT 720UL BOBBIN 70 66 0.10 99 P2 TWO 5 FB4
-1.19 TEC TEH 9
HOT 720UL BOBBIN 70 68 0.13 106 P2 TWD 7 FB4
-1.32 TEC TEH 9
HOT 720UL BOBBIN 0.12 88 P2 TWD 6 FB6
+1.21 TEC TEH 9
HOT 720UL BOBBIN 70 74 0.15 78 P2 TWD 8 FB4
-1.26 TEC TEH 11 HOT 720UL BOBBIN 71 43 0.11 60 P2 TWD 5 FP4
+1.10 TEC TEH 6
HOT 720UL BOBBIN 71 47 0.12 83 P2 TWD 5 FB5
-0.99 TEC TEH 6
HOT 720UL BOBBIN 0.11 49 P2 TWD 5 FB4
+1.13 TEC TEH 6
HOT 720UL BOBBIN 71 53 0.14 125 P2 TWD 6 FB5
-1.15 TEC TEH 8
HOT 720UL BOBBIN 0.15 102 P2 TWD 6 FB4
+1.12 TEC TEH 8
HOT 720UL BOBBIN 71 55 0.12 57 P2 TWD 6 FB6
+1.19 TEC TEH 12 HOT 720UL BOBBIN 71 57 0.38 132 P2 TWD 14 FB5
+1.03 TEC TEH 8
HOT 720UL BOBBIN 0.41 99 P2 TWD 14 FB4
-1.24 TEC TEH 8
HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/16/13 18:15:25 Component: S/G 13 Page 9 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 0.19 108 P2 TWO 8 FB3
-1.26 EXT EXT UTIL 1
UTIL 2
CAL # LEG TEC TEH 8
HOT PROBE 720UL SCOPE BOBBIN 71 59 0.17 0.25 0.11 71 63 0.23 0.20 0.34 0.22 0.13 113 P2 TWD 7 FB5 103 P2 TWD 10 FB4 86 P2 TWD 5 FB3 75 P2 TWD 9 FB6 54 P2 TWD 8 FB5 89 P2 TWO 13 FB5 108 P2 TWD 9 FB4 90 P2 TWD 5 FB3
+1.17
-1.12
-1.35
-1.26
+1.15
-1.12
+1.19
+1.24 TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEN 8
NOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN TEC TEH 8
HOT 720UL BOBBIN 71 65 0.14 113 P2 TWO 6 FB4 71 67 0.20 120 P2 TWD 8 FB6 0.26 105 P2 TWD 10 FB5 0.09 40 P2 TWO 4 FB5 0.20 65 P2 TWD 8 FB4 0.20 115 P2 TWD 8 FB3
+1.10 TEC TEH 8
HOT 720UL BOBBIN
-1.19 TEC TEH 8
+1.10 TEC TEH 8
-1.22 TEC TEH 8
+1.15 TEC TEH 8
+1.22 TEC TEH 8
HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 71 69 0.11 111 P2 TWO 5 FB6
-1.22 TEC TEH 8
HOT 720UL BOBBIN 0.11 32 P2 TWO 5 FB5
+1.01 TEC TEH 8
HOT 720UL BOBBIN 0.11 72 P2 TWD 5 FB4
+1.15 TEC TEH 8
HOT 720UL BOBBIN 71 71 0.11 101 P2 TWO 5 FB6
-1.18 TEC TEH 8
HOT 720UL BOBBIN 0.12 159 P2 TWO 5 FB3
+1.20 TEC TEH 8
HOT 720UL BOBBIN 71 73 0.11 147 P2 TWD 5 FB5
-1.10 TEC TEH 10 HOT 720UL BOBBIN 0.15 130 P2 TWO 6 FB4
+0.92 TEC TEH 10 HOT 720UL BOBBIN 72 42 0.12 32 P2 TWD 6 FB5
+1.19 TEC TEH 6
HOT 720UL BOBBIN 0.14 153 P2 TWD 6 FB4
-1.12 TEC TEH 6
HOT 720UL BOBBIN 0.11 145 P2 TWD 5 FB3
-1.22 TEC TEH 6
HOT 720UL BOBBIN 72 50 0.12 97 P2 TWO 7 FB4
-1.17 TEC TEH 7
HOT 720UL BOBBIN 72 58 0.31 118 P2 TWO 14 FB6
-1.35 TEC TEH 9
HOT 720UL BOBBIN 0.85 121 P2 TWD 27 FB5
-1.10 TEC TEH 9
HOT 720UL BOBBIN 0.58 119 P2 TWD 22 FB4
+1.06 TEC TEH 9
HOT 720UL BOBBIN 0.30 124 P2 TWO 14 FB3
+1.22 TEC TEH 9
HOT 720UL BOBBIN 0.06 130 P2 TWO 3 FB2
+1.39 TEC TEH 9
HOT 720UL BOBBIN 72 60 0.14 72 P2 TWO 7 FB4
+1.15 TEC TEH 9
HOT 720UL BOBBIN 0.07 120 P2 TWD 4 FB3
-1.28 TEC TEH 9
HOT 720UL BOBBIN 72 62 0.13 72 64 0.14 72 66 0.23 0.10 72 72 0.08 73 45 0.16 0.11 0.11 61 P2 TWD 7 FB5 131 P2 TWD 8 FB4
-1.13 TEC TEN
-1.15 TEC TEH 9
NOT 720UL BOBBIN 9
HOT 720UL BOBBIN 99 P2 TWD 9 FB5
-1.15 TEC TEH 8
HOT 720UL BOBBIN 147 P2 TWD 4 FB4
-1.19 TEC TEH 8
HOT 720UL BOBBIN 130 P2 TWO 5 FB4
-1.17 TEC TEH 11 HOT 720UL BOBBIN 96 P2 TWD 8 FB5
-1.11 TEC TEH 7
HOT 720UL BOBBIN 113 P2 TWO 6 FB4
+1.00 TEC TEH 7
HOT 720UL BOBBIN 61 P2 TWO 6 FB3
+1.24 TEC TEH 7
HOT 720UL BOBBIN 73 51 0.08 97 P2 TWD 5 FB5
+1.08 TEC TEH 9
HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:25 Customer Name: DC COOK Unit I Component:
S/G 13 Page 10 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.=15 *16 0.
P2. TWO. -======.19 TEC TEN.
9=..
HOT..
72..
BOBBIN---.
0.15 160 P2 TWD 8 FB5
-1.19 TEC TEH 9
HOT 720UL BOBBIN 0.17 124 P2 TWD 9 FB4
+1.19 TEC TEH 9
HOT 720UL BOBBIN 0.10 134 P2 TWD 6 FB3
+1.19 TEC TEH 9
HOT 720UL BOBBIN 73 53 0.07 40 P2 TWD 4 FB7
-0.88 TEC TEH 9
HOT 720UL BOBBIN 73 57 0.15 123 P2 TWD 8 FB6
-1.30 TEC TEH 9
HOT 720UL BOBBIN 0.12 126 P2 TWD 7 FB5
+1.13 TEC TEH 9
HOT 720UL BOBBIN 0.23 143 P2 TWD 11 FB5
-1.17 TEC TEH 9
HOT 720UL BOBBIN 0.27 72 P2 TWD 13 FB4
-1.13 TEC TEH 9
HOT 720UL BOBBIN 73 61 0.18 77 P2 TWD 7 FB6
-1.21 TEC TEH 8
HOT 720UL BOBBIN 0.26 127 P2 TWO 10 FB5
+1.05 TEC TEH 8
HOT 720UL BOBBIN 0.13 149 P2 TWD 5 FB5
-1.19 TEC TEH 8
HOT 720UL BOBBIN 0.28 92 P2 TWD 11 FB4
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.51 127 P2 TWD 17 FB4
-1.15 TEC TEH 8
HOT 720UL BOBBIN 0.14 104 P2 TWD 6 FB3
+1.28 TEC TEH 8
HOT 720UL BOBBIN 0.14 149 P2 TWD 6 FB3
-1.28 TEC TEH 8
HOT 720UL BOBBIN 73 63 0.12 66 P2 TWO 6 FB6
+1.21 TEC TEN 9
NOT 720UL BOBBIN 0.13 104 P2 TWD 7 FB6
-1.26 TEC TEH 9
HOT 720UL BOBBIN 0.21 117 P2 TWD 10 FBS
+1.13 TEC TEH 9
HOT 720UL BOBBIN 0.33 117 P2 TWD 15 FB5
-1.19 TEC TEH 9
HOT 720UL BOBBIN 0.11 83 P2 TWD 6 FB4
+1.17 TEC TEH 9
HOT 720UL BOBBIN 0.16 114 P2 TWD 9 FB4
-1.24 TEC TEH 9
HOT 720UL BOBBIN 0.11 97 P2 TWD 6 FB3
-1.35 TEC TEH 9
HOT 720UL BOBBIN 73 65 0.13 96 P2 TWD 7 FB6
-1.24 TEC TEH 9
HOT 720UL BOBBIN 0.10 130 P2 TWD 5 FB5
+0.90 TEC TEH 9
HOT 720UL BOBBIN 0.20 88 P2 TWD 10 FB4
-1.19 TEC TEH 9
HOT 720UL BOBBIN 74 50 0.12 76 P2 TWD 6 FB5
+0.92 TEC TEH 6
HOT 720UL BOBBIN 0.17 49 P2 TWD 7 FB4
-1.15 TEC TEH 6
HOT 720UL BOBBIN 0.10 57 P2 TWD 5 FB3
-1.13 TEC TEH 6
HOT 720UL BOBBIN 74 52 0.13 45 P2 TWD 6 FB6
+1.26 TEC TEH 8
HOT 720UL BOBBIN 0.48 97 P2 TWD 16 FB5
+1.08 TEC TEH 8
HOT 720UL BOBBIN 0.55 103 P2 TWD 18 FB4
-1.17 TEC TEH 8
HOT 720UL BOBBIN 0.24 80 P2 TWD 10 FB3
-1.33 TEC TEH 8
HOT 720UL BOBBIN 74 64 0.10 105 P2 TWD 4 FB6
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.29 118 P2 TWD 11 FB6
-1.22 TEC TEH 8
HOT 720UL BOBBIN 0.43 93 P2 TWD 15 FB5
-1.12 TEC TEH 8
HOT 720UL BOBBIN 0.37 115 P2 TWD 13 FB4
+1.22 TEC TEH 8
HOT 720UL BOBBIN 0.64 133 P2 TWD 20 FB4
-1.12 TEC TEH 8
HOT 720UL BOBBIN 0.28 107 P2 TWD 11 FB3
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.39 135 P2 TWD 14 FB3
-1.31 TEC TEH 8
HOT 720UL BOBBIN 0.15 121 P2 TWD 6 FB2
-1.38 TEC TEH 8
HOT 720UL BOBBIN 74 66 0.12 117 P2 TWD 7 FB5
-1.21 TEC TEH 9
HOT 720UL BOBBIN 75 43 0.11 76 P2 TWD 5 FB5
-0.73 TEC TEH 6
HOT 720UL BOBBIN 0.11 132 P2 TWD 5 FB4
+1.12 TEC TEH 6
HOT 720UL BOBBIN 75 47 0.16 137 P2 TWD 7 FB5
-1.24 TEC TEH 6
HOT 720UL BOBBIN 0.16 122 P2 TWD 7 FB4
+1.08 TEC TEH 6
HOT 720UL BOBBIN 0.10 108 P2 TWD 5 FB3
+1.13 TEC TEH 6
HOT 720UL BOBBIN 75 49 0.09 88 P2 TWD 4 FB7
+1.97 TEC TEH 6
HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:25 Customer Name:
DC COOK Unit 1 Component: S/G 13 Page 11 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE
==
==
==
==
==
====_.......
75 61 0.36 137 P2 TWD 16 FB6
+1.08 TEC TEH 9
HOT 720UL BOBBIN 0.58 127 P2 TWD 22 FB5
+0.97 TEC TEH 9
HOT 720UL BOBBIN 0.28 91 P2 TWD 13 FB4
+1.13 TEC TEH 9
HOT 720UL BOBBIN 0.42 128 P2 TWD 18 FB4
-1.19 TEC TEH 9
HOT 720UL BOBBIN 0.58 124 P2 TWD 22 FB3
+1.19 TEC TEH 9
HOT 720UL BOBBIN 75 65 0.09 135 P2 TWD 4 FB4
-1.24 TEC TEH 8
HOT 720UL BOBBIN 75 73 0.10 30 P2 TWD 4 FB4
+1.12 TEC TEH 10 HOT 720UL BOBBIN 76 46 0.15 77 P2 TWD 8 FB6
+1.20 TEC TEH 7
HOT 720UL BOBBIN 0.19 57 P2 TWD 10 FB5
+1.06 TEC TEH 7
HOT 720UL BOBBIN 0.18 143 P2 TWD 9 FB4
-1.15 TEC TEH 7
HOT 720UL BOBBIN 0.13 60 P2 TWD 7 FB3
-1.35 TEC TEH 7
HOT 720UL BOBBIN 76 62 0.11 63 P2 TWD 6 FB5
+1.12 TEC TEH 9
HOT 720UL BOBBIN 0.15 58 P2 TWD 8 FB5
-1.17 TEC TEH 9
HOT 720UL BOBBIN 0.11 80 P2 TWD 6 FB4
-1.19 TEC TEH 9
HOT 720UL BOBBIN 78 58 0.22 55 P2 TWD 9 FB6
-1.24 TEC TEH 8
HOT 720UL BOBBIN 0.37 100 P2 TWD 13 FB5
+1.24 TEC TEH 8
HOT 720UL BOBBIN 0.42 133 P2 TWD 15 FB5
-1.12 TEC TEH 8
HOT 720UL BOBBIN 0.77 109 P2 TWD 22 FB4
+1.21 TEC TEH 8
HOT 720UL BOBBIN 0.10 49 P2 TWD 4 FB4
-1.24 TEC TEH 8
HOT 720UL BOBBIN 0.26 116 P2 TWD 10 FB3
+1.21 TEC TEH 8
HOT 720UL BOBBIN 0.15 134 P2 TWD 6 FB3
-1.24 TEC TEH 8
HOT 720UL BOBBIN 0.11 67 P2 TWD 5 FB6
+1.17 TEC TEH 8
HOT 720UL BOBBIN 78 60 0.12 78 P2 TWD 5 FB6
+1.17 TEC TEH 8
HOT 720UL BOBBIN 0.48 122 P2 TWD 16 FB6
-1.19 TEC TEH 8
HOT 720UL BOBBIN 0.93 112 P2 TWD 25 FB5
-1.17 TEC TEH 8
HOT 720UL BOBBIN 0.95 111 P2 TWD 25 FB4
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.28 130 P2 TWD 11 FB3
+1.24 TEC TEH 8
HOT 720UL BOBBIN 0.22 114 P2 TWD 9 FB3
-1.19 TEC TEH 8
HOT 720UL BOBBIN 78 66 0.23 99 P2 TWD 11 FB6
-1.23 TEC TEH 9
HOT 720UL BOBBIN 0.18 91 P2 TWD 9 FB5
+1.17 TEC TEH 9
HOT 720UL BOBBIN 0.46 123 P2 TWD 19 FB5
-1.15 TEC TEH 9
HOT 720UL BOBBIN 0.17 124 P2 TWD 9 FB4
+1.12 TEC TEH 9
HOT 720UL BOBBIN 0.16 92 P2 TWD 8 FB3
-1.23 TEC TEH 9
HOT 720UL BOBBIN 79 49 0.12 38 P2 TWD 5 FB6
+1.08 TEC TEH 6
HOT 720UL BOBBIN 79 65 0.12 129 P2 TWD 5 FB7
-1.40 TEC TEH 8
HOT 720UL BOBBIN 0.93 103 P2 TWD 25 FB6
-1.29 TEC TEH 8
HOT 720UL BOBBIN 0.61 108 P2 TWD 19 FB5
+1.13 TEC TEH 8
HOT 720UL BOBBIN 0.24 120 P2 TWD 10 FB5
-1.19 TEC TEH 8
HOT 720UL BOBBIN 0.36 105 P2 TWD 13 FB4
+1.19 TEC TEH 8
HOT 720UL BOBBIN 0.82 104 P2 TWD 23 FB4
-1.10 TEC TEH 8
HOT 720UL BOBBIN 0.66 125 P2 TWD 20 FB3
+1.22 TEC TEH 8
HOT 720UL BOBBIN 0.21 144 P2 TWD 9 FB3
-1.31 TEC TEH 8
HOT 720UL BOBBIN 0.27 127 P2 TWD 10 FB2
+1.38 TEC TEH 8
HOT 720UL BOBBIN 81 43 0.09 103 P2 TWD 5 FB2
-2.00 TEC TEH 7
HOT 720UL BOBBIN 82 54 0.16 85 P2 TWD 7 FB6
+0.50 TEC TEH 12 HOT 720UL BOBBIN 0.10 53 P2 TWD 5 FB5
-0.09 TEC TEH 12 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/16/13 18:15:25 Component: S/G 13 Page 12 of 12 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE Total Tubes
- 196 Total Records: 453 to Enclosure to AEP-NRC-2013-90 Unit 1 2013 Steam Generator Tube Inspection Report SG 14 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/15/13 12:41:51 Customer Name: DC COOK Unit 1 Component: S/G 14 Page 1 of 20 TWD Indications QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 1
37 0.11 115 P2 TWD 5 FB8
+1.19 08C TEH 30 HOT 720CL BOBBIN 1
47 0.19 105 P2 TWO 8 07C
-1.02 08C TEC 7
COLD 720UL BOBBIN 1
51 0.17 70 P2 TWD 7 06C
+1.04 08C TEC LAR 7
COLD 720UL BOBBIN 3
19 0.09 94 P2 TWD 4 08C
-1.64 08C TEN 30 NOT 720CL BOBBIN 3
95 0.15 154 P2 TWD 6 FB5
-1.30 08C TEH 30 HOT 720CL BOBBIN 8
44 0.12 132 P2 TWD 5 04C
+0.47 TEC TEH LAR 29 HOT 720CL BOBBIN 19 105 0.08 147 P2 TWD 3 08C
-1.52 TEC TEH LAR 25 HOT 720UL BOBBIN 26 6
0.11 87 P2 TWD 4 FB5
+1.70 TEC TEN 20 NOT 720UL BOBBIN 31 9
0.11 59 P2 TWD 4 FB5
-0.76 TEC TEH 20 HOT 720UL BOBBIN 36 46 0.20 92 P2 TWO 7 OSM
+0.53 TEC TEN LAR 16 NOT 720UL BOBBIN 36 54 0.12 50 P2 TWD 5 FB5
+0.37 TEC TEH 23 HOT 720UL BOBBIN 37 67 0.08 90 P2 TWD 3 FBI
-1.39 TEC TEH 19 HOT 720UL BOBBIN 39 65 0.10 76 P2 TWD 4 FB4
-1.20 TEC TEH 18 HOT 720UL BOBBIN 40 64 0.08 126 P2 TWD 3 FB4
-0.78 TEC TEH 19 HOT 720UL BOBBIN 41 69 0.09 106 P2 TWO 3 FB4
+1.16 TEC TEN 19 NOT 720UL BOBBIN 42 50 0.10 137 P2 TWD 4 FB4
-1.26 TEC TEH 17 HOT 720UL BOBBIN 44 62 0.57 123 P2 TWD 16 FB3
-2.40 TEC TEH 19 HOT 720UL BOBBIN 45 27 0.09 92 P2 TWD 3 FB6
-0.82 TEC TEH 19 HOT 720UL BOBBIN 46 54 0.10 43 P2 TWO 4 FB4
+0.00 TEC TEN 23 NOT 720UL BOBBIN 0.09 63 P2 TWO 3 EB5
+0.42 TEC TEN 23 NOT 720UL BOBBIN 47 53 0.13 57 P2 TWD 5 FBS
+0.66 TEC TEH 12 HOT 720UL BOBBIN 47 65 0.12 120 P2 TWD 5 1 FB
-1.23 TEC TEH 10 HOT 720UL BOBBIN 47 69 0.08 68 P2 TWO 4 FB4
+1.21 TEC TEN 11 NOT 720UL BOBBIN 47 71 0.09 76 P2 TWD 4 FB4
+1.26 TEC TEH 11 HOT 720UL BOBBIN 48 14 0.09 146 P2 TWO 4 02N
+47.99 TEC TEN LAR 21 NOT 720UL BOBBIN 48 48 0.11 134 P2 TWO S FB4
+1.24 TEC TEN 13 NOT 720UL BOBBIN 48 54 0.19 82 P2 TWD 6 FBS
+0.37 TEC TEH 22 HOT 720UL BOBBIN 0.19 106 P2 TWD 6 FB4
+0.48 TEC TEH 22 HOT 720UL BOBBIN 48 60 0.08 127 P2 TWD 3 FB4
-1.19 TEC TEH 13 HOT 720UL BOBBIN 48 92 0.09 110 P2 TWD 4 FBS
+1.67 TEC TEH 23 HOT 720UL BOBBIN 49 67 0.11 134 P2 TWD 5 FB4
-1.26 TEC TEH 11 HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 12:41:51 Component: S/G 14 Page 2 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 50 54 0.15 79 P2 TWD 5 FB5
+0.44 TEC TEH 23 HOT 720UL BOBBIN 0.10 97 P2 TWD 4 FB4
+0.34 TEC TEH 23 HOT 720UL BOBBIN 50 64 0.22 86 P2 TWD 8 FB5
+1.10 TEC TEH 10 HOT 720UL BOBBIN 0.14 147 P2 TWD 5 FB4
-1.25 TEC TEH 10 HOT 720UL BOBBIN 50 66 0.08 117 P2 TWD 3 FB4
-1.26 TEC TEH 11 HOT 720UL BOBBIN 51 53 0.12 35 P2 TWD 5 FB4
-1.62 TEC TEH 12 HOT 720UL BOBBIN 51 55 0.12 136 P2 TWD 4 FB4
+1.31 TEC TEH 23 HOT 720UL BOBBIN 51.57.0.09...102..P2...TWO..4..FBS...+1.57........TEC.........TEN..........13.......NOT............................BOBBIN............
51 57 0.09 102 P2 TWD 4 FB5
+1.57 TEC TEH 13 HOT 720UL BOBBIN 51 61 0.10 117 P2 TWD 4 FB5
+1.10 TEC TEH 10 HOT 720UL BOBBIN 0.10 69 P2 TWD 4 FB5
-1.16 TEC TEH 10 HOT 720UL BOBBIN 0.24 57 P2 TWD 9 FB4
-1.27 TEC TEH 10 HOT 720UL BOBBIN 52 54 0.13 59 P2 TWD 4 FB4
+0.44 TEC TEH 22 HOT 720UL BOBBIN 52 66 0.19 74 P2 TWD 7 FB5
-1.16 TEC TEH 10 HOT 720UL BOBBIN 53 53 0.24 93 P2 TWD 10 FB5
+0.57 TEC TEH 13 HOT 720UL BOBBIN 0.07 151 P2 TWD 3 FB4
-1.46 TEC TEH 13 HOT 720UL BOBBIN 53 59 0.09 92 P2 TWD 4 FB4
+1.19 TEC TEH 54 16 0.10 144 P2 TWD 3 08H
+0.55 TEC TEH 54 50 0.25 65 P2 TWD 10 FB5
+1.05 TEC TEH 54 66 0.09 62 P2 TWD 4 FB4
-1.17 TEC TEH 55 43 0.22 123 P2 TWD 9 FB4
+1.01 TEC TEH 55 53 0.19 105 P2 TWD 7 FB5
+0.61 TEC TEH 55 61 0.15 71 P2 TWD 6 FB4
-1.23 TEC TEH 55 63 0.13 152 P2 TWD 5 FB5
+0.98 TEC TEH 0.18 134 P2 TWD 7 FB4
-1.18 TEC TEH 55 65 0.32 125 P2 TWD 12 FB5
-1.14 TEC TEH 0.19 100 P2 TWD 8 FB4
+1.07 TEC TEH 0.10 138 P2 TWD 4 FB4
-1.23 TEC TEH 0.10 123 P2 TWD 4 FB3
+1.28 TEC TEH 55 67 0.13 40 P2 TWD 5 FB6
-1.27 TEC TEH 56 54 0.31 103 P2 TWD 9 FB5
+0.48 TEC TEH 0.10 34 P2 TWD 3 FB4
+0.46 TEC TEH 56 60 0.15 138 P2 TWD 6 FB5
+1.10 TEC TEH 0.09 149 P2 TWD 4 FB4
+0.97 TEC TEH 56 62 0.17 98 P2 TWD 7 FB5
+1.03 TEC TEH 0.28 104 P2 TWD 11 FB4
-1.12 TEC TEH 13 HOT 720UL BOBBIN LAR 20 HOT 720UL BOBBIN 12 NOT 720UL BOBBIN 11 HOT 720UL BOBBIN 15 NOT 720UL BOBBIN 12 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 11 NOT 720UL 11 HOT 720UL BOBBIN BOBBIN 11 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 22 HOT 720UL BOBBIN 22 HOT 720UL BOBBIN 13 NOT 720UL BOBBIN 13 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 12:41:51 Customer Name: DC COOK Unit 1 Component: S/G 14 Page 3 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 56 64 0.09 82 P2 TWD 4 FB5
+0.91 TEC TEH 11 HOT 720UL BOBBIN 0.11 114 P2 TWD 5 FB4
+1.07 TEC TEH 11 HOT 720UL BOBBIN 56 66 0.15 66 P2 TWD 6 FB5
+1.10 TEC TEH 10 HOT 720UL BOBBIN 0.10 53 P2 TWO 4 FB4
-1.16 TEC TEH 10 HOT 720UL BOBBIN 57 45 0.26 136 P2 TWD 10 03H
-1.64 TEC TEH LAR 14 HOT 720UL BOBBIN 57 53 0.10 122 P2 TWD 4 FB4
-1.62 TEC TEH 13 HOT 720UL BOBBIN 58 36 0.17 129 P2 TWD 7 07H
-1.63 TEC TEH LAR 14 HOT 720UL BOBBIN 58 44 0.11 141 P2 TWD 5 FB4
-1.12 TEC TEH 14 HOT 720UL BOBBIN 58 54 0.20 127 P2 TWD 7 FB5
+0.00 TEC TEH 23 HOT 720UL BOBBIN 0.31 103 P2 TWO 10 FB4
-0.05 TEC TEH 23 HOT 720UL BOBBIN 58 60 0.13 100 P2 TWD 5 FB5
+1.10 TEC TEH 12 HOT 720UL BOBBIN 0.16 97 P2 TWD 7 FB4
+1.03 TEC TEH 12 HOT 720UL BOBBIN 58 62 0.17 90 P2 TWD 7 FB5
+1.07 TEC TEH 10 HOT 720UL BOBBIN 0.15 152 P2 TWD 6 FB4
-1.23 TEC TEH 10 HOT 720UL BOBBIN 58 64 0.10 67 P2 TWO 4 FB5
+1.05 TEC TEN 10 NOT 720UL BOBBIN 0.10 49 P2 TWD 4 FB4
+1.12 TEC TEH 10 HOT 720UL BOBBIN 58 66 0.15 123 P2 TWD 6 FB5
-1.21 TEC TEH 11 HOT 720UL BOBBIN 0.10 130 P2 TWD 5 FB4
-1.15 TEC TEH 11 HOT 720UL BOBBIN 58 68 0.10 79 P2 TWD 4 FB4
-1.10 TEC TEH 11 HOT 720UL BOBBIN 59 45 0.11 144 P2 TWD 5 03H
-1.67 TEC TEH LAR 15 HOT 720UL BOBBIN 59 47 0.13 83 P2 TWD 6 FB4
+0.99 TEC TEH 14 HOT 720UL BOBBIN 59 51 0.14 136 P2 TWD 6 FB5
+0.96 TEC TEH 12 HOT 720UL BOBBIN 0.15 41 P2 TWD 6 FB4
-1.21 TEC TEH 12 HOT 720UL BOBBIN 59 55 0.12 130 P2 TWD 5 FB5
+1.51 TEC TEH 23 HOT 720UL BOBBIN 0.15 54 P2 TWD 5 FB4
-1.17 TEC TEH 23 HOT 720UL BOBBIN 59 57 0.13 140 P2 TWD 6 FB4
-1.07 TEC TEH 13 HOT 720UL BOBBIN 0.16 77 P2 TWD 7 FB5
+1.44 TEC TEH 13 HOT 720UL BOBBIN 59 61 0.10 43 P2 TWD 4 FB5
+1.36 TEC TEH 10 HOT 720UL BOBBIN 59 63 0.15 105 P2 TWD 6 FB6
-1.35 TEC TEH 11 HOT 720UL BOBBIN 0.18 72 P2 TWD 7 FB5
+1.07 TEC TEH 11 HOT 720UL BOBBIN 0.20 129 P2 TWD 8 FB5
-1.14 TEC TEH 11 HOT 720UL BOBBIN 0.36 116 P2 TWD 13 FB4
-1.14 TEC TEH 11 HOT 720UL BOBBIN 59 65 0.22 111 P2 TWO 9 FB6
-1.24 TEC TEH 11 HOT 720UL BOBBIN 0.33 110 P2 TWD 12 FB5
+1.04 TEC TEH 11 HOT 720UL BOBBIN 0.18 108 P2 TWD 7 FB5
-1.22 TEC TEH 11 HOT 720UL BOBBIN 0.39 118 P2 TWO 14 FB4
+1.08 TEC TEH 11 HOT 720UL BOBBIN 0.13 136 P2 TWD 6 FB4
-1.17 TEC TEH 11 HOT 720UL BOBBIN 0.13 115 P2 TWD 6 FB3
+1.33 TEC TEH 11 HOT 720UL BOBBIN 59 67 0.13 112 P2 TWO 5 FB6
-1.23 TEC TEH 10 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:51 Component: S/G 14 Page 4 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.12 90 P2 TWD 5 FB5
-1.05 TEC TEH 10 HOT 720UL BOBBIN 0.22 126 P2 TWD 8 FB4
+1.05 TEC TEH 10 HOT 720UL BOBBIN 59..69.0.11...92..P2...TED............+1.10........TEC.........TEN.............1.....NOT............20..............BOBBIN............
59 69 0.11 92 P2 TWD 5 FB4
+1.10 TEC TEH 10 HOT 720UL BOBBIN 59 73 0.12 49 P2 TWD 5 FB4
+1.18 TEC TEH 10 HOT 720UL BOBBIN 60.44.0.13..113..P2.TED....FB4.-1.......12........TEC.........TEN..........15.......NOT.........720................BOBBIN............
60 44 0.13 113 P2 TWD 5 FB4
-1.12 TEC TEH 15 HOT 720UL BOBBIN 60 46 0.13 53 P2 TWD 5 FB5
+i.i0 TEC TEH 15 HOT 720UL BOBBIN 60 52 0.17 110 P2 TWD 7 FB5
+0.96 TEC TEH 0.12 38 P2 TWD 5 FB4
-1.16 TEC TEH 60 54 0.16 116 P2 TWD 5 FB5
+0.02 TEC TEH 0.24 58 P2 TWD 7 FB4
+0.09 TEC TEH 60 56 0.11 128 P2 TWD 5 FB6
-1.28 TEC TEH 0.16 99 P2 TWD 7 FB4
+1.07 TEC TEH 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 22----NOT-----------------BOBBIN-----
22 HOT 720UL BOBBIN 22 HOT 720UL BOBBIN 13 NOT 13 HOT 720UL 720UL BOBBIN BOBBIN BOBBIN 60 60 0.10 45 P2 TWD 4 FB5
+1.09 TEC TEH 13 HOT 720UL 60 62 0.11 98 P2 TWD 5 FB6
+1.19 TEC TEH 11 HOT 720UL BOBBIN 0.43 121 P2 TWD 15 FB5
+1.07 TEC TEH 11 HOT 720UL BOBBIN 0.33 139 P2 TWD 12 FB4
-1.19 TEC TEH 11 HOT 720UL BOBBIN 0.12 107 P2 TWD 5 FB3
-1.32 TEC TEH 11 HOT 720UL BOBBIN 60 64 0.19 105 P2 TWD 8 FB5
+1.09 TEC TEH 11 HOT 720UL BOBBIN 0.14 148 P2 TWD 6 FB4
+0.98 TEC TEH 11 HOT 720UL BOBBIN 60 66 0.10 140 P2 TWD 4 FB6
-1.38 TEC TEH 10 HOT 720UL BOBBIN 0.16 105 P2 TWD 6 FB5
+1.01 TEC TEH 10 HOT 720UL BOBBIN 0.14 89 P2 TWD 6 FB4
-1.18 TEC TEH 10 HOT 720UL BOBBIN 60 70 0.09 43 P2 TWD 4 FB5
+1.08 TEC TEH 10 HOT 720UL BOBBIN 0.09 133 P2 TWD 4 FB4
-1.14 TEC TEH 10 HOT 720UL BOBBIN 61 39 0.09 143 P2 TWD 4 FB4
+1.12 TEC TEH 15 HOT 720UL BOBBIN 61 43 0.15 119 P2 TWD 6 FB4
+1.10 TEC TEH 14 HOT 720UL BOBBIN 0.14 121 P2 TWD 6 FB3
+1.29 TEC TEH 14 HOT 720UL BOBBIN 61 53 0.23 130 P2 TWD 10 FB5 -
+0.67 TEC TEH 13 HOT 720UL BOBBIN 0.11 32 P2 TWD 5 FB5
-1.17 TEC TEH 13 HOT 720UL BOBBIN 0.09 68 P2 TWD 4 FB4
+1.10 TEC TEH 13 HOT 720UL BOBBIN 0.13 144 P2 TWD 6 FB4
-1.65 TEC TEH 13 HOT 720UL BOBBIN 61 55 0.24 90 P2 TWD 7 FB5
+1.15 TEC TEH 22 HOT 720UL BOBBIN 0.17 146 P2 TWD 5 FB4
-1.15 TEC TEH 22 HOT 720UL BOBBIN 61 57 61 59 0.16 86 P2 TWD 7 FB4
-1.16 TEC TEH 0.14 124 P2 TWD 6 FB6
-1.26 TEC TEH 0.11 88 P2 TWD 5 FB5
-1.14 TEC TEH 0.21 97 P2 TWD 9 FB4
-1.21 TEC TEH 0.10 145 P2 TWD 5 FB3
-1.37 TEC TEH 12 13 13 13 13 NOT 720OULt BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN 61 61 0.13 115 P2 TWD 5 0.12 88 P2 TWD 5 FB6
+1.16 FB6
-1.30 TEC TEN TEC TEH 11 NOT 720UL BOBBIN 11 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 5 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATI 0.42 119 P2 TWD 15 FB5 0.12 60 P2 TWD 5 FB5 0.13 94 P2 TWD 6 FB4 0.21 147 P2 TWD 9 FB4 0.13 144 P2 TWD 5 FB3 61 63 0.20 128 P2 TWD 8 FB6 0.26 122 P2 TWD 10 FB6 0.48 125 P2 TWD 15 FB5 0.26 128 P2 TWD 9 FB5 1.09 111 P2 TWD 26 FB4 0.15 100 P2 TWD 6 FB3 61 65 0.17 141 P2 TWD 7 FB6 0.15 90 P2 TWD 6 FB6 0.25 130 P2 TWD 9 FB5 0.27 91 P2 TWD 10 FB5 0.42 113 P2 TWD 14 FB4 0.24 124 P2 TWD 9 FB3 61 67 0.14 134 P2 TWD 6 FB6 0.10 138 P2 TWD 4 FB5 0.23 96 P2 TWD 9 FB5 0.25 132 P2 TWD 10 FB4 0.15 78 P2 TWD 6 FB4 0.14 118 P2 TWD 6 FB3 61 69 0.24 142 P2 TWD 9 FB4 ON EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE
+1.27 TEC TEH 11 HOT 720UL BOBBIN
-1.32 TEC TEH 11 HOT 720UL BOBBIN
+1.07 TEC TEH 11 HOT 720UL BOBBIN
-1.14 TEC TEH 11 HOT 720UL BOBBIN
+1.32 TEC TEH 11 HOT 720UL BOBBIN
+1.12 TEC TEN 10 NOT 720UL BOBBIN
-1.40 TEC TEH 10 HOT 720UL BOBBIN
+1.01 TEC TEH 10 HOT 720UL BOBBIN
-1.18 TEC TEH 10 HOT 720UL BOBBIN
-1.27.
TEC TEH 10 HOT 720UL BOBBIN
-1.47 TEC TEH 10 HOT 720UL BOBBIN
+1.14 TEC TEH 10 HOT 720UL BOBBIN
-1.32 TEC TEN 10 NOT 720UL BOBBIN
+0.99 TEC TEH 10 HOT 720UL BOBBIN
-1.14 TEC TEH 10 HOT 720UL BOBBIN
+1.05 TEC TEH 10 HOT 720UL BOBBIN
+1.32 TEC TEH 10 HOT 720UL BOBBIN
-1.07 TEC TEH 11 HOT 720UL BOBBIN
+1.03 TEC TEH 11 HOT 720UL BOBBIN
-1.19 TEC TEN 11 NOT 720UL BOBBIN
+1.07 TEC TEH 11 HOT 720UL BOBBIN
-1.21 TEC TEH 11 HOT 720UL BOBBIN
-1.23 TEC TEH 11 HOT 720UL BOBBIN
+1.12 TEC TEH 10 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 61 71 0.14 142 P2 TWD 5 FB4
+1.01 TEC TEH 62 54 0.34 133 P2 TWD 11 FB6
+0.00 TEC TEH 0.39 112 P2 TWD 12 FB5
+0.00 TEC TEH 0.45 127 P2 TWD 14 FB4
+0.00 TEC TEH 23 NOT 720UL 23 HOT 720UL 23 HOT 720UL BOBBIN BOBBIN BOBBIN 62 60 0.14 94 P2 TWD 6 FB6
+1.14 TEC TEH 12 HOT 720UL BOBBIN 0.30 129 P2 TWD 11 FB5
+1.10 TEC TEH 12 HOT 720UL BOBBIN 0.13 137 P2 TWD 5 06H
-1.80 TEC TEH LAR 12 HOT 720UL BOBBIN 62 62 0.10 49 P2 TWD 4 FB5
+1.01 TEC TEH 10 HOT 720UL BOBBIN 0.12 76 P2 TWD 5 FB4
+1.23 TEC TEH 10 HOT 720UL BOBBIN 62 64 0.09 86 P2 TWD 4 FB6
+1.18 TEC TEH 10 HOT 720UL BOBBIN 0.21 120 P2 TWD 8 FB5
+1.10 TEC TEH 10 HOT 720UL BOBBIN 0.21 135 P2 TWD 8 FB4
+1.12 TEC TEH 10 HOT 720UL BOBBIN 0.20 95 P2 TWD 8 FB4
-1.10 TEC TEH 10 HOT 720UL BOBBIN 62 68 0.14 58 P2 TWD 6 FB4
-0.98 TEC TEH 11 HOT 720UL BOBBIN 62 70 0.25 140 P2 TWD 10 FB5
+1.10 TEC TEH 11 HOT 720UL BOBBIN 0.22 93 P2 TWD 9 FB4
-1.19 TEC TEH 11 HOT 720UL BOBBIN 62 72 0.11 84 P2 TWD 5 FB4
-1.10 TEC TEH 11 HOT 720UL 62 74 0.09 132 P2 TWD 4 FB4
-0.64 TEC TEH 11 HOT 720UL 63 43 0.13 109 P2 TWD 5 FB4
+1.01 TEC TEH 15 HOT 720UL 63 45 0.12 120 P2 TWD 5 FB6
-1.28 TEC TEH 15 HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 12:41:52 Component:
S/G 14 Page 6 of 20 QUERY: QueryMl ROW COL VOLTS 0.42 0.15 0.15 0.20 DEG 129 91 43 62 CHN P2 P2 P2 P2 IND %
TWD 1 TWD 6 TWO 6 TWD 8 63 47 0.12 117 P2 TWD 5 0.22 110 P2 TWD 9 0.11 68 P2 TWD 5 0.12 43 P2 TWD 5 TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 4
FB5
-1.12 TEC TEH 15 HOT 720UL BOBBIN FB4
+1.17 TEC TEH 15 HOT 720UL BOBBIN FB4
-1.17 TEC TEH 15 HOT 720UL BOBBIN FB3
+1.24 TEC TEH 15 HOT 720UL BOBBIN FB6
-1.58 TEC TEN 14 NOT 720UL BOBBIN FBS
-1.27 TEC TEH 14 HOT 720UL BOBBIN FB4
+1.16 TEC TEH 14 HOT 720UL BOBBIN FB4
-1.10 TEC TEH 14 HOT 720UL BOBBIN FB5
-1.27 TEC TEH 12 HOT 720UL BOBBIN FB5
+1.07 TEC TEH 12 HOT 720UL BOBBIN FB4
+1.12 TEC TEH 12 HOT 720UL BOBBIN 2
FB4
-1.16 TEC TEH 12 HOT 720UL BOBBIN FB3
+1.20 TEC TEH 12 HOT 720UL BOBBIN 63 51 0.23 70 P2 TWD 0.11 92 P2 TWD 0.14 52 P2 TWD 0.34 142 P2 TWD 0.19 153 P2 TWD 63 53 0.11 52 P2 TWD 0.26 126 P2 TWD 0.64 109 P2 TWD 0.29 116 P2 TWD 0.31 107 P2 TWD 9
5 6
1 8
5 10 19 11 11 FB6
-1.27 TEC FB5
+0.90 TEC FB5
-1.16 TEC FB4
+1.10 TEC FB4
-1.18 TEC TEH TEH TEH TEH TEH 63 55 0.13 130 P2 TWD 5 FB5
+1.15 TEC TEH 63 57 0.21 115 P2 TWD 9 FB5
-1.13 TEC TEH 0.17 58 P2 TWD 7 FB4
+1.10 TEC TEH 63 59 0.10 118 P2 TWD 4 FB6
+1.12 TEC TEH 0.12 96 P2 TWD 5 FB5
-1.18 TEC TEH 0.16 83 P2 TWD 6 FB4
+1.05 TEC TEH 63 61 0.13 89 P2 TWD 5 FB6
+1.23 TEC TEH 0.13 120 P2 TWD 5 FB5
+0.81 TEC TEH 0.25 92 P2 TWD 9 FB4
+1.10 TEC TEH 63 63 0.15 83 P2 TWD 6 FB5
-1.05 TEC TEH 63 65 0.14 135 P2 TWD 6 FB5
-1.16 TEC TEH 0.12 104 P2 TWD 5 FB4
+1.09 TEC TEH 0.10 116 P2 TWD 4 FB3
+1.28 TEC TEH 63 67 0.11 147 P2 TWD 5 FB4
+1.14 TEC TEH 63 69 0.14 89 P2 TWD 6 FB4
+1.17 TEC TEH 63 73 0.11 42 P2 TWD 4 FB4
+1.05 TEC TEH 64 42 0.14 122 P2 TWD 6 FB4
-1.19 TEC TEH 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 13 NOT 720UL BOBBIN 13 HOT 720UL BOBBIN 12 NOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 11 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 11 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 15 HOT 720UL BOBBIN 64 44 0.14 78 P2 TWO 6 FB4
-1.17 TEC TEH 15 HOT 720UL BOBBIN 64 48 0.11 55 P2 TWD 5 FB4
-1.24 TEC TEH 13 HOT 720UL BOBBIN 64 50 0.14 46 P2 TWD 6 FB5
+1.06 TEC TEH 13 HOT 720UL BOBBIN 0.14 59 P2 TWD 6 FB4
-1.17 TEC TEH 13 HOT 720UL BOBBIN 64 52 0.19 67 P2 TWD 8 FB5
-1.14 TEC TEH 13 HOT 720UL BOBBIN 0.13 103 P2 TWD 6 03H
-1.68 TEC TEH LAR 13 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 7 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 64 58 0.24 113 P2 TWD 10 FB5
+1.04 TEC TEH 0.13 125 P2 TWD 6 FB4
-1.13 TEC TEH 64 60 0.12 121 P2 TWD 5 FB6
-1.21 TEC TEH 0.27 102 P2 TWD 11 FB5
-1.14 TEC TEH 0.14 129 P2 TWD 6 FB4
+1.07 TEC TEH 0.06 133 P2 TWD 3 FB3
+1.26 TEC TEH 64 62 0.17 93 P2 TWD 7 FB5
-1.18 TEC TEH 0.14 124 P2 TWD 6 FB4
+1.25 TEC TEH 64 64 0.20 124 P2 TWD 8 FB6
+1.14 TEC TEH 0.26 143 P2 TWD 10 FB5
+1.03 TEC TEH 0.18 142 P2 TWD 7 FB5
-1.14 TEC TEH 0.23 129 P2 TWD 9 FB4
+1.12 TEC TEH 0.38 106 P2 TWD 14 FB4
-1.23 TEC TEH 0.14 142 P2 TWD 6 FB3
-1.34 TEC TEH 64 66 0.12 145 P2 TWD 5 FB6
+1.19 TEC TEH 0.24 115 P2 TWD 9 FB5
+1.12 TEC TEH 0.15 87 P2 TWD 6 FB5
-1.08 TEC TEH 0.18 138 P2 TWD 7 FB4
+1.16 TEC TEH 0.38 133 P2 TWD 13 FB4
-1.21 TEC TEH 0.31 134 P2 TWD 11 FB3
+1.30 TEC TEH 2
CAL # LEG 13 HOT 13 HOT 13 NOT 13 HOT 13 HOT 13 HOT 11 HOT 11 NOT 11 NOT 11 NOT 11 HOT 11 HOT 11 HOT 11 HOT PROBE 720UL 720UL SCOPE BOBBIN BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 64 68 0.10 0.24 64 70 0.12 64 72 0.14 64 74 0.12 65 55 0.28 0.14 148 P2 TWD 4 FB6
+1.16 115 P2 TWD 9 FB4
-1.16 52 P2 TWD 5 FB6
+1.21 104 P2 TWD 6 FB4
-1.10 119 P2 TWD 5 FB4
-1.14 89 P2 TWD 8 FB5
+1.04 64 P2 TWD 4 FB4
-1.20 TEC TEN 10 NOT TEC TEH 10 HOT TEC TEN 10 NOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEN 10 NOT 720UL BOBBIN TEC TEH 22 HOT 720UL BOBBIN TEC TEH 22 HOT 720UL BOBBIN 65 57 0.13 92 P2 TWD 5 FB4
-1.20 TEC TEH 12 HOT 720UL 65 59 0.29 119 P2 TWD 12 FB6
+1.05 TEC TEH 13 HOT 720UL 0.22 123 P2 TWD 9 FB5
+1.10 TEC TEH 13 HOT 720UL 0.29 114 P2 TWD 11 FB4
-1.19 TEC TEH 13 HOT 720UL 0.07 61 P2 TWD 3 FB4
+0.96 TEC TEH 13 HOT 720UL 0.12 151 P2 TWD 5 FB3
-1.42 TEC TEH 13 HOT 720UL 65 61 0.24 138 P2 TWD 10 FB5
+1.14 TEC TEH 11 HOT 720UL 0.28 94 P2 TWD 11 FB4
-1.35 TEC TEH 11 HOT 720UL 65 63 0.15 95 P2 TWD 6 FB6
+1.27 TEC TEH 10 HOT 720UL 0.10 96 P2 TWD 4 FB6
-1.25 TEC TEH 10 HOT 720UL 0.26 144 P2 TWD 9 FB5
+0.99 TEC TEH 10 HOT 720UL 0.25 125 P2 TWD 9 FB5
-1.12 TEC TEH 10 HOT 720UL 0.57 110 P2 TWD 17 FB4
-1.23 TEC TEH 10 HOT 720UL 0.20 152 P2 TWD 8 FB3
-1.40 TEC TEH 10 HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 65 65 0.17 144 P2 TWD 7 FB6 0.18 131 P2 TWD 7 FB5 0.30 69 P2 TWD 11 FB5 0.49 103 P2 TWD 16 FB4
-1.32 TEC TEH 10 HOT
+1.05 TEC TEH 10 HOT
-1.10 TEC TEH 10 HOT
+1.12 TEC TEH 10 HOT 720UL 720UL 720UL 720UL
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 8 of 20 QUERY: QueryMl ROW COL VOLTS 0.36 0.35 DEG CHN IND 140 P2 TWD 144 P2 TWO
%TW LOCATION 12 FB4
-1.16 12 FB3
+1.30 EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 11 HOT 720UL BOBBIN TEC TEH 11 HOT 720UL BOBBIN TEC TEH 11 HOT 720UL BOBBIN 65 67 0.10 111 P2 TWD 4 FB6
-1.32 0.15 108 P2 TWD 7 FB5
-1.34 0.37 107 P2 TWD 13 FB4
+0.93 65 69 0.18 148 P2 TWD 7 FB6
-1.32 0.16 73 P2 TWD 6 FB5
-1.21 0.37 109 P2 TWD 13 FB4
+1.12 65 71 0.12 79 P2 TWD 5 FB4
+1.10 66 54 0.30 111 P2 TWD 10 FB6
+0.00 0.43 125 P2 TWD 13 FB5
+0.00 0.56 108 P2 TWD 16 FB4
+0.00 0.21 70 P2 TWD 7 FB3
+0.00 66 58 0.15 147 P2 TWD 6 FB6
-1.18 0.58 119 P2 TWD 18 FB5
+1.16 0.15 152 P2 TWD 6 FB4
-1.03 66 60 0.53 113 P2 TWD 17 FB5
+1.10 0.21 106 P2 TWD 8 FB4
-1.16 0.36 137 P2 TWO 13 FB3
-1.23 0.09 120 P2 TWD 4 FB6
-1.29 66 62 0.14 151 P2 TWD 6 FB6
+1.18 0.53 117 P2 TWD 16 FB5
+1.07 0.13 68 P2 TWO 5 FB5
-1.23 0.26 117 P2 TWD 9 FB4
+1.12 0.35 114 P2 TWD 12 FB4
-1.18 0.13 136 P2 TWD 5 FB3
+1.16 0.14 146 P2 TWD 5 FB3
-1.27 66 64 0.21 69 P2 TWD 8 FB5
+1.10 66 66 0.11 61 P2 TWD 5 FB5
+1.08 0.12 91 P2 TWO 5 FB4
-1.17 TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEN 23 NOT 720UL BOBBIN TEC TEH 23 HOT 720UL BOBBIN TEC TEN 23 NOT 720UL BOBBIN TEC TEH 23 HOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEN 12 NOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEH 12 HOT 720UL BOBBIN TEC TEN 10 NOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEN TEC TEH TEC TEH 10 HOT 720UL BOBBIN 11 NOT 720UL BOBBIN 11 HOT 720UL BOBBIN 66 68 0.13 70 P2 TWD 6 FB5
+1.10 TEC TEH 11 HOT 720UL BOBBIN 0.21 91 P2 TWD 8 FB4
-1.15 TEC TEH 11 HOT 720UL BOBBIN 66 70 0.21 138 P2 TWD 8 FB4
-1.10 TEC TEH 11 HOT 720UL BOBBIN 66 72 0.11 92 P2 TWD 5 FB4
-1.17 TEC TEH 11 HOT 720UL BOBBIN 67 47 0.11 122 P2 TWO 5 FB6
-1.71 TEC TEH 14 HOT 720UL BOBBIN 0.19 134 P2 TWD 8 FB5
+1.01 TEC TEH 14 HOT 720UL BOBBIN 0.20 62 P2 TWD 8 FB4
+1.09 TEC TEH 14 HOT 720UL BOBBIN 67 49 0.17 101 P2 TWO 7 FB5
+1.01 TEC TEH 12 HOT 720UL BOBBIN 67 53 0.20 95 P2 TWD 8 FB5
+0.99 TEC TEH 12 HOT 720UL BOBBIN 67 55 0.08 77 P2 TWD 3 FB5
+1.03 TEC TEH 23 HOT 720UL BOBBIN 0.19 88 P2 TWO 7 FB4
-1.14 TEC TEH 23 HOT 720UL BOBBIN 67 57 0.23 107 P2 TWD 9 FB6
-1.22 TEC TEH 13 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 9 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND 0.18 120 ?2 TWO 0.19 140 P2 TWD 67 59 0.29 121 P2 TWD 0.25 132 P2 TWD 0.18 138 P2 TWD 0.24 92 P2 TWD 0.11 88 P2 TWD
%TW 88 10 7
9 4
LOCATION EXT EXT EBS
-1.08 TEC TEN FB4
-1.15 TEC TEH FB6
+1.18 TEC TEH FBS
+1.03 TEC TEH FB4
-1.16 TEC TEH FB3
-1.34 TEC TEH FB4
+1.12 TEC TEH UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 13 NOT 720UL BOBBIN 13 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN---
67 61 0.32 118 P2 TWD 11 FB6
-1.34 TEC TEH 10 HOT 0.19 143 P2 TWD 7 FB5
+0.99 TEC TEH 10 HOT 0.22 126 P2 TWD 8 FB5
-1.12 TEC TEH 10 HOT 0.24 69 P2 TWD 9 FB4
+1.10 TEC TEH 10 HOT 0.24 131 P2 TWD 9 FB4
-1.29 TEC TEH 10 HOT 67 63 0.21 114 P2 TWD 8 FBS
+1.07 TEC TEH 11 HOT 0.77 119 P2 TWD 22 FB4
-1.30 TEC TEH 11 HOT 0.12 115 P2 TWD 5 FB3
-1.19 TEC TEH 11 HOT 0.18 120 P2 TWD 8 FB6
-1.33 TEC TEH LAR 11 HOT 67 65 0.12 108 P2 TWD 5 FB6
-1.28 TEC TEH 11 HOT 0.13 138 P2 TWD 6 FB5
+1.12 TEC TEH 11 HOT 0.11 54 P2 TWD 5 FB5
-1.21 TEC TEH 11 HOT 0.34 125 P2 TWD 13 FB4
-1.23 TEC TEH 11 HOT 0.16 117 P2 TWD 7 FB3
+1.30 TEC TEH 11 HOT 67 67 0.14 136 P2 TWD 5 FB6
-1.25 TEC TEH 10 HOT 0.10 94 P2 TWD 4 FB5
-1.08 TEC TEH 10 HOT 0.30 119 P2 TWD 11 FB4
-1.21 TEC TEH 10 HOT 0.16 82 P2 TWD 6 FB3
-1.34 TEC TEH 10 HOT 0.20 123 P2 TWD 8 08H
-1.56 TEC TEH LAR 10 HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN BOBBIN...........
720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN BOBBIN...........
720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN BOBBIN...........
720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 67 69 0.13 0.15 0.25 0.17 143 P2 TWD 6 FB6
-1.34 TEC TEH 11 HOT 115 P2 TWD 6 FB5
+1.15 TEC TEH 11 HOT 131 P2 TWD 10 FB4
+1.15 TEC TEH 11 HOT 123 P2 TWD 7 FB4
-1.24 TEC TEH 11 HOT 67 71 0.14 87 P2 TWD 6 FB4
+1.53 TEC TEH 11 HOT 720UL BOBBIN 68 48 0.10 133 P2 TWD 4 FB4
-1.20 TEC TEH 15 HOT 720UL BOBBIN 68 52 0.10 97 P2 TWD 5 FB5
+1.09 TEC TEH 13 HOT 720UL BOBBIN 0.12 146 P2 TWD 5 FB4
-1.09 TEC TEH 13 HOT 720UL BOBBIN 68 54 0.28 54 P2 TWD 8 FB5
+0.41 TEC TEH 22 HOT 720UL BOBBIN 0.31 82 P2 TWD 9 FB4
+0.07 TEC TEH 22 HOT 720UL BOBBIN 68 56 0.20 142 P2 TWD 8 FB5
-1.12 TEC TEH 13 HOT 720UL BOBBIN 0.29 111 P2 TWD 12 FB4
+1.17 TEC TEH 13 HOT 720UL BOBBIN 68 58 0.13 105 P2 TWD 6 FB5
+1.15 TEC TEH 13 HOT 720UL BOBBIN 0.22 83 P2 TWD 9 FB5
-1.12 TEC TEH 13 HOT 720UL BOBBIN 0.09 149 P2 TWD 4 FB4
+1.10 TEC TEH 13 HOT 720UL BOBBIN 0.14 93 P2 TWD 6 FB4
-1.19 TEC TEH 13 HOT 720UL BOBBIN 68 60 0.11 153 P2 TWD 5 FB6
+1.17 TEC TEH 13 0.23 136 P2 TWD 9 FB5
-1.19 TEC TEH 13 0.17 65 P2 TWD 7 FB4
+1.05 TEC TEH 13 NOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN H O T.
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 10 of 20 QUERY: QueryMl ROW COL VOLTS DEG C 68 62 0.09 104 P 0.09 86 P
HN IND %TW LOCATION 2
TWD 4 FB6
-0.72 2
TWD 4 FB5
+1.21 EXT TEC TEC EXT UTIL 1
TEH TEH LAR UTIL 2
CAL # LEG PROBE SCOPE 11 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 68 64 0.10 104 P2 TWD 4 FB6
+1.17 0.16 131 P2 TWD 7 FB6
-1.30 0.19 132 P2 TWD 8 FB4
+1.03 0.35 114 P2 TWD 13 FB4
-1.26 0.13 138 P2 TWD 6 FB3
-1.35 0.49 124 P2 TWD 17 FB5
+1.14 68 66 0.15 95 P2 TWD 6 FB6
+1.10 0.13 55 P2 TWD 5 FB5
+1.01 0.19 73 P2 TWD 7 FB5
-1.21 0.25 133 P2 TWD 9 FB4
+0.99 68 68 0.13 93 P2 TWD 5 FB6
+1.10 0.20 122 P2 TWD 7 FB4
-1.18 68 70 0.18 74 P2 TWD 7 FB4
-1.05 TEC TEC TEC TEC TEC TEC TEH TEH TEH TEH TEH TEH LAR 11 ii 11 11 11 ii HOT HOT HOT HOT HOT HOT 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN TEC TEN 10 NOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT TEC TEH 10 HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN 68 72 0.13 126 P2 TWD 5 FB4
-1.21 TEC 68 78 0.09 67 P2 TWO 4 FB4
-0.63 TEC 69 53 0.09 38 P2 TWD 4 FB6
-1.26 TEC 0.12 115 P2 TWO 5 FB5
+1.12 TEC 0.14 114 P2 TWD 6 FB4
-1.14 TEC 69 55 0.11 109 P2 TWD 3 FB6
-1.26 TEC 0.26 81 P2 TWD 7 FB5
+1.09 TEC 0.52 102 P2 TWD 13 FB4
-1.15 TEC 0.24 132 P2 TWD 7 FB3
-1.31 TEC TE TE H
10 HOT 720UL BOBBIN H
25 HOT 720UL BOBBIN TEH TEH TEH TEH TEH TEH TEH 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 22 NOT 720UL BOBBIN 22 HOT 720UL BOBBIN 22 HOT 720UL BOBBIN 22 HOT 720UL BOBBIN 69 57 0.11 33 P2 TWD 5 FB5
-1.18 TEC TEH 12 HOT 720UL BOBBIN 69 59 0.32 125 P2 TWO 12 FB6
+1.17 TEC TEN 13 NOT 720UL BOBBIN 0.29 118 P2 TWD 12 FB6
-1.19 TEC TEH 13 HOT 720UL BOBBIN 0.47 125 P2 TWD 16 FB5
+1.03 TEC TEH 13 HOT 720UL BOBBIN 0.17 63 P2 TWD 7 FB5
-1.31 TEC TEH 13 HOT 720UL BOBBIN 0.78 123 P2 TWD 23 FB4
-1.05 TEC TEH 13 HOT 720UL BOBBIN 0.22 143 P2 TWD 9 FB3
-1.40 TEC TEH 13 HOT 720UL BOBBIN 69 61 0.54 133 P2 TWD 18 FB6
-1.21 TEC TEH 11 HOT 720UL BOBBIN 0.19 107 P2 TWD 8 FB5
+1.21 TEC TEH 11 HOT 720UL BOBBIN 0.23 106 P2 TWD 9 FB5
-1.33 TEC TEH 11 HOT 720UL BOBBIN 0.12 93 P2 TWD 5 FB4
+1.03 TEC TEH 11 HOT 720UL BOBBIN 0.60 125 P2 TWD 19 FB4
-1.17 TEC TEH 11 HOT 720UL BOBBIN 0.17 136 P2 TWD 7 FB3
+1.33 TEC TEH 11 HOT 720UL BOBBIN 0.09 92 P2 TWD 4 FB3
-1.35 TEC TEH 11 HOT 720UL BOBBIN 69 67 0.15 99 P2 TWD 7 FB6
-1.23 TEC TEH 11 HOT 720UL BOBBIN 0.13 139 P2 TWD 6 FB5
-1.07 TEC TEH 11 HOT 720UL BOBBIN 0.26 118 P2 TWD 10 FB4
+1.10 TEC TEH 11 HOT 720UL BOBBIN 0.08 139 P2 TWD 3 FB3
+1.32 TEC TEH 11 HOT 720UL BOBBIN 69 69 0.18 147 P2 TWD 7 FB6
-1.27 TEC TEH 10 HOT 720UL BOBBIN 0.40 114 P2 TWD 13 FB5
-1.16 TEC TEH 10 HOT 720UL BOBBIN 0.59 114 P2 TWD 18 FB4
+1.18 TEC TEH 10 HOT 720UL BOBBIN 0.10 40 P2 TWD 4 FB4
-1.08 TEC TEH 10 HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 12:41:52 Customer Name: DC COOK Unit 1 Component: SG 14 Page 11 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE
.-========
=
==
=
==
= = = = =
= = ===
==
==
0.24 142 P2 TWD 9 FB3
+1.36 TEC TEH 10 HOT 720UL BOBBIN 70 38 0.10 33 P2 TWO 4 PB4
-1.18 TEC TEN 14 NOT 720UL BOBBIN 70 46 0.14 42 P2 TWD 6 FB3
-1.40 TEC TEH 14 HOT 720UL BOBBIN 0.18 110 P2 TWD 7 PB4
-1.16 TEC TEN LAR 14 HOT 720UL BOBBIN 70 50 0.13 53 P2 TWD 6 FB6
-1.23 TEC TEH 12 HOT 720UL BOBBIN 0.22 69 P2 TWO 9 PBS
-1.18 TEC TEN 12 HOT 720UL BOBBIN 0.22 119 P2 TWD 8 FB4
-1.16 TEC TEH 12 HOT 720UL BOBBIN 70 52 0.17 131 P2 TWD 7 FB5
+1.09 TEC TEH 12 HOT 720UL BOBBIN 0.28 131 P2 TWD 10 FB4
-1.14 TEC TEH 12 HOT 720UL BOBBIN 0.15 119 P2 TWD 6 FB3
-1.29 TEC TEH 12 HOT 720UL BOBBIN 70 54 0.15 88 P2 TWO S PB5
+0.00 TEC TEN 23 NOT 720UL BOBBIN 0.18 115 P2 TWO 6 FB4
+0.00 TEC TEN 23 NOT 720UL BOBBIN 70 58 0.26 129 P2 TWD 10 FB6
-1.23 TEC TEH 12 HOT 720UL BOBBIN 0.41 116 P2 TWD 14 FBS
+1.05 TEC TEH 12 HOT 720UL BOBBIN 0.27 121 P2 TWD 10 FB5
-1.23 TEC TEH 12 HOT 720UL BOBBIN 0.16 90 P2 TWD 6 FB4
+1.07 TEC TEH 12 HOT 720UL BOBBIN 0.23 98 P2 TWD 9 FB4
-1.14 TEC TEH 12 HOT 720UL BOBBIN 0.11 35 P2 TWD 5 PB3
+1.16 TEC TEN 12 NOT 720UL BOBBIN 70 60 0.19 114 P2 TWD 8 FB6
+1.14 TEC TEH 12 HOT 720UL BOBBIN 0.18 88 P2 TWD 7 FB5
-1.12 TEC TEH 12 HOT 720UL BOBBIN 0.24 120 P2 TWD 9 P0 4
+1.OS TEC TEH 12 HOT 720UL BOBBIN 0.11 114 P2 TWD 4 FB3
+1.14 TEC TEH 12 HOT 720UL BOBBIN 70 62 0.50 119 P2 TWO 16 PBS
+1.12 TEC TEN 10 NOT 720UL BOBBIN 0.20 130 P2 TWD 7 PFB
-1.16 TEC TEH 10 HOT 720UL BOBBIN 0.56 108 P2 TWD 17 FB4
+1.12 TEC TEH 10 HOT 720UL BOBBIN 0.40 113 P2 TWO 13 P04
-1.09 TEC TEN 10 NOT 720UL BOBBIN 0.34 87 P2 TWD 12 FB3
+1.25 TEC TEH 10 HOT 720UL BOBBIN 0.18 86 P2 TWD 6 FB3
-1.27 TEC TEH 10 HOT 720UL BOBBIN 0.18 134 P2 TWD 7 FB6
+1.20 TEC TEH LAR 10 HOT 720UL BOBBIN 70 66 0.10 146 P2 TWD 5 FB6
+1.17 TEC TEH 11 HOT 720UL BOBBIN 0.19 122 P2 TWD 8 FB5
+1.12 TEC TEH 11 HOT 720UL BOBBIN 0.13 61 P2 TWD 6 FB4
+1.14 TEC TEH 11 HOT 720UL BOBBIN 0.15 115 P2 TWD 6 FB4
-1.21 TEC TEH 10 HOT 720UL BOBBIN 0.13 126 P2 TWD 5 3FB
-1.3S TEC TEH 11 HOT 720UL BOBBIN 70 68 0.11 lOS P2 TWD 5 6FB
+1.21 TEC TEH 11 HOT 720UL BOBBIN 0.27 104 P2 TWD 11 FB4
-1.13 TEC TEH 10 HOT 720UL BOBBIN 70 70 0.18 133 P2 TWD 8 FB6
+1.31 TEC TEH 11 HOT 720UL BOBBIN 0.10 128 P2 TWD 7 FBS
+1.05 TEC TEH 11 HOT 720UL BOBBIN 0.34 139 P2 TWD 13 FB4
-1.17 TEC TEH 11 HOT 720UL BOBBIN 70 72 0.08 148 P2 TWD 4 FB6
+1.38 TEC TEH 11 HOT 720UL BOBBIN 0.15 124 P2 TWD 7 FB4
-1.10 TEC TEH 11 HOT 720UL BOBBIN 70 76 0.12 139 P2 TWD 5 FB4
-1.05 TEC TEH 10 HOT 720UL BOBBIN 70 78 0.11 71 P2 TWD 4 FB4
-1.06 TEC TEH 2S HOT 720UL BOBBIN 71 37 0.11 117 P2 TWD 5 07H
+0.46 TEC TEH LAR 14 HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 12 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT 71 45 0.16 144 P2 TWD 7 FB4
+1.14 TEC 0.11 134 P2 TWD 5 FB3
+1.31 TEC 0.12 85 P2 TWD 5 FB5
-1.18 TEC 71 47 0.23 88 P2 TWD 9 FB5
-1.23 TEC 0.23 142 P2 TWD 9 FB4
+1.07 TEC 71 49 0.21 131 P2 TWD 8 FB5
-1.07 TEC 0.18 124 P2 TWD 7 FB4
+1.01 TEC EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE TEN 14 HOT 720UL BOBBIN TEH 14 HOT 720UL BOBBIN TEN LAR 14 HOT 720UL BOBBIN TEN..........14........HOT............................BOBBIN.............
TEH 14 HOT 720UL BOBBIN TEN 14 HOT 720UL BOBBIN TEN..........12........NOT............................BOBBIN.............
TEE 12 HOT 720UL BOBBIN TEH 12 HOT 720UL BOBBIN 71 51 0.19 102 P2 TWD 8 FB4
+1.05 TEC TEN 12 HOT 720UL BOBBIN 71 53 0.13 53 P2 TWD 5 0.14 115 P2 TWD 6 FB5 FB5
-1.07
+0.07 TEC TEN TEC TEN TEC TEN TEC TEN 71 55 0.15 130 P2 TWD 5 FB5
+1.10 0.17 151 P2 TWD 6 FB4
-1.12 71 57 0.14 115 P2 TWD 6 FB6
-1.17 0.39 134 P2 TWD 14 FB5
+1.19 0.90 125 P2 TWD 25 FB4
-1.03 0.12 150 P2 TWD 5 FB3
-1.22 71 59 0.26 120 P2 TWD 10 FB6
+1.12 0.12 132 P2 TWD 5 FB6
-1.25 0.13 102 P2 TWD 5 FB5
+1.07 0.21 128 P2 TWD 8 FB4
+1.07 71 61 0.07 120 P2 TWD 3 FB6
-1.18 0.14 76 P2 TWD 5 FB5
+1.12 0.20 114 P2 TWD 7 FB4
-1.10 TEC TEC TEC TEC TEN TEN TEH TEN TEC TEH TEC TEH TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN 71 63 0.46 117 P2 TWD 15 FB5
+0.99 0.63 113 P2 TWD 19 FB5
-1.14 0.39 90 P2 TWD 13 FB4
+1.12 0.43 117 P2 TWD 14 FB4
-1.23 0.36 122 P2 TWD 12 FB3
+1.25 0.41 133 P2 TWD 14 FB6
-1.25 71 65 0.16 110 P2 TWD 6 FB6
-1.18 0.09 19 P2 TWD 4 FB5
+1.18 0.20 110 P2 TWD 8 FB5
-1.12 0.97 126 P2 TWD 24 FB4
-1.18 0.14 87 P2 TWD 6 FB3
+1.25 0.18 133 P2 TWD 7 FB3
-1.25 TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN LAR TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEN TEC TEH TEC TEN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 23...NOT.................BOBBIN.....
23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 13...NOT.................BOBBIN.....
13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 12...NOT.................BOBBIN.....
12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 10...NOT................BOBBIN.....
10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 71 67 0.15 117 P2 TWD 6 FB6 0.16 105 P2 TWD 6 FB5 0.21 128 P2 TWD 8 FB4 0.15 113 P2 TWD 6 FB3 0.10 58 P2 TWD 4 FB3 71 69 0.10 154 P2 TWD 5 FB6 0.12 73 P2 TWD 5 FB5 0.37 117 P2 TWD 13 FB4
-1.32
-1.14
-1.21
+1.29
-1.25
-1.12
+1.19
-1.05 71 71 0.10 46 P2 TWD 5 FB5
-1.12 TEC TEN 0.14 136 P2 TWD 6 FB4
+1.69 TEC TEN 11 NOT 720UL 11 HOT 720UL BOBBIN BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 13 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 71 75 0.08 133 P2 TWD 4 FB5
-1.10 0.12 104 P2 TWD 5 FB4
+1.26 72 46 0.10 154 P2 TWD 4 04H
+0.41 72 48 0.14 93 P2 TWD 6 FB5
+1.13 0.15 142 P2 TWD 6 FB3
-1.19 EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE TEC.
TEN.
11....NOT......720...
BOBBIN......
TEC TEH 11 HOT 720UL BOBBIN TEC TEH 11 HOT 720UL BOBBIN TEC......TEN......LAR.....15.....NOT...................BOBBIN.......
TEC TEH LAR 15 HOT 720UL BOBBIN
....................TEC......TEN.......15.....NOT.......720...........BOBBIN........
TEC TEH 15 HOT 720UL BOBBIN TEC TEH 15 HOT 720UL BOBBIN 72 54 0.13 0.20 38 P2 TWD 4 47 P2 TWD 6 FB5
-0.04 FB4
+0.00 TEC TEH 22 HOT TEC TEH 22 HOT 72 56 0.15 99 P2 0.37 125 P2 0.34 126 P2 0.16 153 P2 72 58 0.16 107 P2 0.55 120 P2 0.29 140 P2 0.13 120 P2 TWD 7 FB6
-1.23 TWD 14 FB5
-1.14 TWD 13 FB4
+1.03 TWD 7 FB3
+1.14 TWD 7 FB6
-1.23 TWD 18 FB5
-1.07 TWD 11 FB4
+1.05 TWD 6 FB3
+1.12 TEC TEH TEC TEH TEC TEH TEC TEH TEC TEN TEC TEH TEC TEH TEC TEH 13 HOT 13 HOT 13 HOT 13 HOT 13-NOT 13 HOT 13 HOT 13 HOT 13 HOT 13 NOT 13 HOT 13 HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 72 60 0.21 132 P2 TWD 9 FB6
+1.03 0.22 119 P2 TWD 9 FB5
-1.17 0.22 139 P2 TWD 9 FB4
+1.05 72 62 0.08 150 P2 TWD 4 FB4
+1.10 72 64 0.21 142 P2 TWD 8 FB6
+1.12 0.17 144 P2 TWD 7 FB5
+0.96 0.73 133 P2 TWD 22 FB4
+1.03 0.23 146 P2 TWD 9 FB3
+1.19 72 66 0.13 101 P2 TWD 5 FB6
+1.18 0.31 84 P2 TWD 11 FB5
+1.10 0.44 104 P2 TWD 14 FB4
+1.03 0.12 87 P2 TWD 5 FB4
-1.23 0.10 82 P2 TWD 4 FB3
+1.16 0.29 116 P2 TWD 10 FB3
-1.32 72 68 0.09 36 P2 TWD 3 FB6
+1.16 72 72 0.22 90 P2 TWD 8 FB4
-1.16 72 74 0.13 52 P2 TWD 5 FB5
+1.05 0.11 63 P2 TWD 5 FB4
-1.12 73 41 0.12 72 P2 TWD 5 FB6
-1.05 0.14 105 P2 TWD 6 FB5
-1.21 0.34 118 P2 TWD 12 FB4
+0.99 0.17 82 P2 TWD 7 FB3
+1.23 TEC TEH TEC TEH TEC TEH TEC TEH TEC TEN TEC TEH TEC TEH TEC TEH TEC TEH TEC TEN TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH 11 HOT 720UL BOBBIN 11 NOT 720UL BOBBIN 11 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 11 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 NOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN TEC TEH 10 HOT 720UL BOBBIN TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH 10 HOT 720UL 10 HOT 720UL 14 NOT 720UL 14 HOT 720UL 14 HOT 720UL 14 HOT 720UL 14 HOT 720UL 14 NOT 720UL 14 HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 73 43 0.17 79 P2 TWD 7 FB6 0.17 90 P2 TWD 7 FB4 0.15 67 P2 TWD 6 FB3 73 45 0.18 106 P2 TWD 7 FB5 0.26 133 P2 TWD 10 FB4 0.26 113 P2 TWD 10 FB3
-1.18
+1.01
+1.23
+1.01 TEC
+1.10 TEC
+1.18 TEC TEH TEH TEH 14 NOT 720UL BOBBIN 14 HOT 720UL BOBBIN 14 HOT 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 12:41:52 Component:
S/G 14 Page 14 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 73 47 0.11 135 P2 TWD 5 FB6 0.23 145 P2 TWD 9 FB4 0.12 147 P2 TWD 5 FB3 EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE
-1.28
+1.15
+1.26 TEC TEC TEC TEH TEH TEH 15 HOT 15 HOT 15 HOT 73 53 0.19 0.10 0.63 0.34 0.32 0.94 0.11 0.11 73 55 0.42 1.01 0.52 0.13 0.44 73 57 0.42 0.69 1.06 0.16 0.15 73 59 0.13 0.10 0.16 0.09 0.17 73 65 0.20 0.14 0.22 0.28 0.17 116 P2 TWD S FB6 72 P2 TWD 5 FB6 116 P2 TWD 20 FB5 116 P2 TWD 13 FB5 119 P2 TWD 12 FB4 124 P2 TWD 26 FB4 80 P2 TWD 5 FB3 150 P2 TWD 5 FB3 117 P2 TWD 11 FB6 119 P2 TWD 21 FB5 120 P2 TWD 13 FB4 81 P2 TWD 4 FB4 124 P2 TWD 12 FB3 117 P2 TWD 14 FB6 121 P2 TWD 20 FB5 121 P2 TWD 26 FB4 113 P2 TWD 6 FB3 113 P2 TWD 6 FB3 139 P2 TWD 6 FB6 144 P2 TWD 5 FB5 123 P2 TWD 7 FB4 90 P2 TWD 4 FB4 130 P2 TWD 7 FB3 101 P2 TWD 7 FB5 101 P2 TWD 5 FB5 99 P2 TWD 8 FB4 139 P2 TWD 10 FB4 67 P2 TWD 7 FB3
+1.12
-1.26
+1.10
-1.08
+1.01
-1.19
+1.12
-1.26 TEC TEC TEC TEC TEC TEC TEC TEC TEH 13 HOT TEH 13 HOT TEH 13 HOT TEH 13 HOT TEH 13 HOT TEH 13 HOT TEH 13 HOT TEH 13 HOT
+1.10 TEC TEH
+1.06 TEC TEH
+1.10 TEC TEH
-1.23 TEC TEH
+1.17 TEC TEH
+1.10 TEC TEN
+1.08 TEC TEH
+1.10 TEC TEH
+1.10 TEC TEH
-1.27 TEC TEH 22 HOT 22 HOT 22 HOT 22 HOT 22 HOT 12 NOT 12 HOT 12 HOT 12 HOT 12 HOT 13 HOT 13 HOT 13 HOT 13 HOT 13 HOT 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 72DUL 720UL 720UL 720UL 720UL 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN---------------
BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
-1.28
-1.07
+1.30
-1.17
-1.46
+1.07
-1.12
+1.05
-1.25
+1.12 TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH 10 NOT 720UL 10 HOT 720UL 10 HOT 720UL 10 HOT 720UL 10 HOT 720UL 73 67 0.10 36 P2 TWD 5 FB3
+1.10 74 46 0.14 54 P2 TWD 6 FB5
+1.05 0.22 135 P2 TWD 9 FB4
-1.01 74 50 0.25 115 P2 TWD 9 FB6
+1.07 0.64 117 P2 TWD 19 FB5
+1.03 0.52 109 P2 TWD 17 FB4
-1.14 0.16 120 P2 TWD 7 FB3
-1.29 74 52 0.13 63 P2 TWD 5 FB3
+1.18 0.26 93 P2 TWD 10 FB3
-1.25 0.21 107 P2 TWD 8 FB7
+1.36 0.47 120 P2 TWD 16 FB6
+1.18 0.17 109 P2 TWD 7 FB6
-1.21 0.83 114 P2 TWD 23 FB5
+1.12 0.34 110 P2 TWD 12 FB5
-1.12 1.19 118 P2 TWD 28 FB4
-1.14 74 54 0.17 69 P2 TWD 5 FB5
+0.48 TEC TEN 11 NOT TEC TEH 14 HOT TEC TEH 14 HOT TEC TEH 12 HOT TEC TEN 12 NOT TEC TEH 12 HOT TEC TEH 12 HOT TEC TEH 12 HOT TEC TEH 12 HOT TEC TEN 12 NOT TEC TEH 12 HOT TEC TEH 12 HOT TEC TEH 12 HOT TEC TEH 12 HOT TEC TEH 12 HOT TEC TEH 22 HOT 720UL BOBBIN 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:52 Component: S/G 14 Page 15 of 20 QUERY: QueryMi ROW COL VOLTS 74 58 0.61 0.54 0.46 0.19 0.59 74 60 0.14 0.17 0.12 74 62 0.12 DEG 124 124 119 85 119 CHN IND P2 TWD P2 TWD P2 TWD P2 TWD P2 TWD
%TW LOCATION 19 FB5
+1.18 17 FB5
-1.07 15 FB4
+1.12 8
FB4
-1.12 18 FB3
+1.23 EXT TEC TEC TEC TEC TEC EXT TEH TEH TEH TEH TEH UTIL 1
UTIL 2
CAL # LEG 12 HOT 12 HOT 12 HOT 12 HOT 12 HOT PROBE 720UL 720UL 720UL 720UL 720UL SCOPE BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 98 P2 TWD 6 118 P2 TWD 7 132 P2 TWD 5 66 P2 TWD 5 FB5
-1.10 TEC TEH 12 FB4
+1.10 TEC TEH 12 FB3
+1.23 TEC TEH 12
.. BS..-1.20..........TEC............TEN............10....
FB5
-1.20 TEC TEH 10 74 64 0.21 112 P2 TWD 8 FB6
+1.20 TEC TEH 10 0.64 117 P2 TWD 19 FB5
+0.96 TEC TEH 10 0.23 96 P2 TWD 8 FB4
+1.03 TEC TEH 10 0.18 129 P2 TWD 7 FB4
-1.18 TEC TEH 10 0.16 96 P2 TWD 6 FB3
-1.16 TEC TEH 10 74 66 0.20 143 P2 TWD B FB6
+1.05 TEC TEH 11 0.24 108 P2 TWD 10 FB5
+1.08 TEC TEH 11 0.11 69 P2 TWD 5 FB4
+1.03 TEC TEH 11 0.14 81 P2 TWD 6 FB4
-1.21 TEC TEH 11 0.20 103 P2 TWD 8 FB3
-1.24 TEC TEH 11 74 68 0.23 134 P2 TWD 9 FB6
+1.17 TEC TEE 11 0.13 102 P2 TWD 6 FB6
-1.17 TEC TEH 11 0.31 122 P2 TWD 12 FB5
+1.17 TEC TEH 11 0.84 122 P2 TWD 24 FB4
-1.17 TEC TEH 11 0.13 60 P2 TWD 6 FB3
-1.21 TEC TEH 11 HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN
---OT---------------U--------BOBBIN----------
HOT 720UL BOBBIN
---OT------------------------BOBBIN----------
HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN
---OT------------------------BOBBIN----------
HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN
---OT---------------U--------BOBBIN----------
HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN HOT 720UL BOBBIN 74 70 0.14 126 0.15 118 P2 TWD 6 FB5
+1.17 TEC TEH 11 P2 TWD 6 FB4
-1.17 TEC TEH 11 HOT HOT 720UL 720UL 75 39 0.18 101 P2 TWD 7 FB6
-1.07 TEC TEH 14 HOT 720UL 0.19 80 P2 TWD 8 FB4
+1.16 TEC TEH 14 HOT 720UL 75 47 0.14 84 P2 TWD 6 FB4
+1.07 TEC TEH 14 HOT 720UL 75 49 0.17 I11 P2 TWD 7 FB5
-1.18 TEC TEH 12 HOT 720UL 0.20 103 P2 TWD 8 FB4
+1.07 TEC TEH 12 HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 75 51 0.21 126 P2 TWD 8 FB4
+1.08 TEC TEH 0.17 129 P2 TWD 7 FB3
+1.16 TEC TEH 75..61..0.19...132...P2..T.....7..PB4..-1.18.......TEC........TEE.....
75 61 0.19 132 P2 TWD 7 FB4
-1.18 TEC TEH 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 75 65 0.19 117 P2 TWD 8 FB5
+1.07 0.11 66 P2 TWD 5 FB4
+1.14 0.15 104 P2 TWD 6 FB4
-1.12 0.27 106 P2 TWD 11 FB3
+1.30 75 67 0.16 77 P2 TWD 6 FB6
+1.18 0.23 125 P2 TWD 9 FB5
-1.18 0.67 120 P2 TWD 19 FB4
+1.07 0.14 153 P2 TWD 6 FB3
+1.25 0.10 92 P2 TWD 4 FB3
-1.18 TEC TEH 11 HOT 720UL TEC TEC TEC TEC TEC TEC TEC TEC TEH 11 HOT 720UL TEH 11 HOT 720UL TEH 11 HOT 720UL TEE 10 HOT 720UL TEH 10 HOT 720UL TEH 10 HOT 720UL TEH 10 HOT 720UL TEH 10 HOT 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 75 69 0.11 124 P2 TWD 5 FB5
+1.08 TEC TEH 11 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:53 Component: S/G 14 Page 16 of 20 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 76 40 0.11 114 P2 TWD 4 FB4
-1.17 TEC TEH 15 HOT 720UL BOBBIN 76 44 0.11 129 P2 TWO 5 FB6
+1.15 TEC TEN 15 HOT 720UL BOBBIN 0.14 95 P2 TWD 6 FB5
+1.08 TEC TEH 15 HOT 720UL BOBBIN 0.26 124 P2 TWD 10 FB4
-1.11 TEC TEH 15 HOT 720UL BOBBIN 76 46 0.13 57 P2 TWD 5 FB4
-1.15 TEC TEH 15 HOT 720UL BOBBIN 76 48 0.24 95 P2 TWD 9 FB4
-1.04 TEC TEH 15 HOT 720UL BOBBIN 0.20 125 P2 TWD B FB3
-1.27 TEC TEH 15 HOT 720UL BOBBIN 76 50 0.16 133 P2 TWD 7 FB6
+1.18 TEC TEH 13 HOT 720UL BOBBIN 0.93 124 P2 TWD 25 FB5
+1.15 TEC TEH 13 HOT 720UL BOBBIN 0.21 129 P2 TWD 9 FB4
-1.11 TEC TEH 13 HOT 720UL BOBBIN 0.16 145 P2 TWD 7 FB3
-1.20 TEC TEH 13 HOT 720UL BOBBIN 76 52 1.00 0.70 0.17 76 66 0.10 125 124 142 122 P2 TWD 26 FB5
+1.08 TEC TEH 13 HOT 720UL BOBBIN P2 TWD 21 FB4
-1.13 TEC TEH 13 HOT 720UL BOBBIN P2 TWD 7 FB3
-1.19 TEC TEH 13 HOT 720UL BOBBIN P2 TWO 4 FB2
+0.74 TEC TEN 10 NOT 720UL BOBBIN P2 TWD 4 FB4
+1.13 TEC TEH 15 HOT 720UL BOBBIN P2 TWD 5 FB3
+1.27 TEC TEH 15 HOT 720UL BOBBIN 77 37 0.10 86 0.11 137 77 39 0.13 102 P2 TWO 5 FB4
+1.25 TEC TEN 15 NOT 720UL BOBBIN 77 49 0.13 118 P2 TWD 6 FB4
+1.04 TEC TEH 13 HOT 720UL BOBBIN 77 55 0.13 84 P2 TWO 4 OSN
+1.48 TEC TEN LAR 22 NOT 720UL BOBBIN 77 59 0.19 123 P2 TWD 8 FB6
+1.09 TEC TEH 13 HOT 720UL BOBBIN 0.29 141 P2 TWO 11 FB5
+1.12 TEC TEN 13 NOT 720UL BOBBIN 0.16 82 P2 TWD 7 FB4
+1.18 TEC TEH 13 HOT 720UL BOBBIN 0.43 112 P2 TWD 16 FB4
-1.09 TEC TEH 13 HOT 720UL BOBBIN 0.33 138 P2 TWD 13 FB3
-1.25 TEC TEH 13 HOT 720UL BOBBIN 77 61 0.51 126 P2 TWD 17 FB4
-1.26 TEC TEH 11 HOT 720UL BOBBIN 0.40 131 P2 TWD 14 FB3
+1.15 TEC TEH 13 HOT 720UL BOBBIN 0.09 118 P2 TWD 4 FB6
+1.08 TEC TEH 13 HOT 720UL BOBBIN 0.17 108 P2 TWD 7 FB6
-1.24 TEC TEH 11 HOT 720UL BOBBIN 0.48 115 P2 TWD 16 FB5
+1.12 TEC TEH 11 HOT 720UL BOBBIN 0.22 133 P2 TWD 9 FB4
+1.08 TEC TEH 11 HOT 720UL BOBBIN 77 65 0.43 122 P2 TWD 14 FB6
-1.23 TEC TEH 10 HOT 720UL BOBBIN 0.18 136 P2 TWD 7 FB5
+1.18 TEC TEH 10 HOT 720UL BOBBIN 1.22 114 P2 TWD 27 FB5
-1.14 TEC TEH 10 HOT 720UL BOBBIN 0.84 119 P2 TWD 22 FB4
+1.10 TEC TEH 10 HOT 720UL BOBBIN 0.17 69 P2 TWD 7 FB4
-1.27 TEC TEH 10 HOT 720UL BOBBIN 0.40 125 P2 TWD 13 FB3
+1.16 TEC TEH 10 HOT 720UL BOBBIN 0.11 49 P2 TWD 4 FB2
+1.42 TEC TEH 10 HOT 720UL BOBBIN 77 69 0.15 118 P2 TWD 6
FB6
-1.27 TEC TEH 0.17 120 P2 TWD 7 FB5
+1.09 TEC TEH 0.14 148 P2 TWD 5 FB5
-1.18 TEC TEH 0.32 136 P2 TWD 11 FB4
+1.14 TEC TEH 0.11 73 P2 TWD 5 FB4
-1.14 TEC TEH 0.17 113 P2 TWD 7 FB3
+1.20 TEC TEH 0.08 123 P2 TWD 3 FB2
+1.47 TEC TEH 10 10 10 10 10 10 10 HOT HOT HOT HOT HOT HOT HOT 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 12:41:53 Component: S/G 14 Page 17 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 78 36 0.14 123 P2 TWD 6 FB4
-1.14 TEC TEH 78 44 0.13 147 P2 TWD 5 FB6
+1.29 TEC TEH 0.15 142 P2 TWD 6 FB4
-1.16 TEC TEH 78 46 0.10 86 P2 TWD 4 FB6
+1.12 TEC TEH 0.19 51 P2 TWD 8 FB5
+1.03 TEC TEH 14 NOT 720UL BOBBIN 14 HOT 720UL BOBBIN 14 NOT 720UL BOBBIN 14 HOT 720UL BOBBIN 14 HOT 720UL BOBBIN 78 48 0.18 95 P2 TWD 7 FB5
+0.85 TEC TEH 14 HOT 720UL BOBBIN 0.22 90 P2 TWD 9 FB4
-1.16 TEC TEH 14 HOT 720UL BOBBIN 0.14 127 P2 TWD 6 FB3
-1.05 TEC TEH 14 HOT 720UL BOBBIN 78 50 0.31 108 P2 TWD 11 FB5
+0.94 TEC TEH 12 HOT 720UL BOBBIN 0.38 124 P2 TWD 13 FB4
-1.23 TEC TEH 12 HOT 720UL BOBBIN 0.34 127 P2 TWD 12 FB3
-1.36 TEC TEH 12 HOT 720UL BOBBIN 78 54 0.13 66 P2 TWD S FB6
+0.00 TEC TEN 23 NOT 720UL BOBBIN 0.14 93 P2 TWD 5 FB5
+0.00 TEC TEH 23 HOT 720UL BOBBIN 0.22 80 P2 TWD 8 FB4
+0.00 TEC TEH 23 HOT 720UL BOBBIN 78 56 0.13 145 P2 TWD S FB6
+1.16 TEC TEN 12 NOT 720UL BOBBIN 0.09 138 P2 TWO 4 PB5
-1.05 TEC TEN 12 NOT 720UL BOBBIN 0.37 123 P2 TWD 13 FB4
-1.08 TEC TEH 12 HOT 720UL BOBBIN 78 58 0.09 108 P2 TWD 4 PB6
-1.21 TEC TEN 12 NOT 720UL BOBBIN 0.23 93 P2 TWD 9 FBS
+1.16 TEC TEH 12 HOT 720UL BOBBIN 0.23 114 P2 TWD 9 FB5
-1.19 TEC TEH 12 HOT 720UL BOBBIN 0.53 118 P2 TWD 17 FB4
-1.08 TEC TEH 12 HOT 720UL BOBBIN 0.23 123 P2 TWO 9 FB3
-1.34 TEC TENH 12 NOT 720UL BOBBIN 78 60 0.39 119 P2 TWD 13 FB6
+1.14 TEC TEH 12 HOT 720UL BOBBIN 0.14 114 P2 TWD 6 FB5
+1.16 TEC TEH 12 HOT 720UL BOBBIN 0.24 132 P2 TWD 9 FB5
-1.16 TEC TEH 12 HOT 720UL BOBBIN 0.25 104 P2 TWD 10 FB4
+1.07 TEC TEH 12 HOT 720UL BOBBIN 0.16 67 P2 TWD 7 FB3
+1.14 TEC TEN 12 NOT 720UL BOBBIN 0.23 137 P2 TWD 9 FB3
-1.25 TEC TEH 12 HOT 720UL BOBBIN 78 64 0.13 146 P2 TWD 5 FB6
+1.12 TEC TEH 10 HOT 720UL BOBBIN 0.18 116 P2 TWD 7 FB5
+1.03 TEC TEH 10 HOT 720UL BOBBIN 0.36 114 P2 TWD 12 FB4
-1.12 TEC TEH 10 HOT 720UL BOBBIN 78 66 0.43 132 P2 TWD 15 FBS
+1.08 TEC TEH 11 HOT 720UL BOBBIN 0.14 87 P2 TWD 6
FB4
+1.10 TEC TEH 11 HOT 720UL BOBBIN 0.09 56 P2 TWO 4 PB4
-1.19 TEC TEN 11 NOT 720UL BOBBIN 0.08 130 P2 TWD 4 FB3
-1.31 TEC TEH 11 HOT 720UL BOBBIN 78 68 0.19 88 P2 TWD 8 FBS
+1.08 TEC TEH 10 HOT 720UL BOBBIN 79 37 0.18 94 P2 TWD 7 FB4
+1.12 TEC TEH 14 HOT 720UL BOBBIN 79 43 0.17 129 P2 TWD 7 FB6
-1.17 TEC TEH 15 HOT 720UL BOBBIN 0.24 93 P2 TWD 9 FB5
-S1.0 TEC TEH 15 HOT 720UL BOBBIN 0.41 101 P2 TWD 14 FB4
+1.12 TEC TEH 15 HOT 720UL BOBBIN 0.18 110 P2 TWD 7 FB3
+1.17 TEC TEH 15 HOT 720UL BOBBIN 79 45 0.11 138 P2 TWD 5
FB4
+1.08 TEC TEH 15 HOT 720UL BOBBIN 79 47 0.14 76 P2 TWD 6 FB6
-1.16 TEC TEH 14 HOT 720UL BOBBIN
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:53 Component: S/G 14 Page 18 of 20 QUERY:
QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE 0.26 120 P2 TD 10 PBS
-1...14.
TEC.
TEN.....
14... NOT..
7--
BOBBIN-------
0.26 120 P2 TWD 10 FB5
-1.14 TEC TEH 14 HOT 720UL BOBBIN 0.13 120 P2 TWD 6 FB4
+1.14 TEC TEH 14 HOT 720UL BOBBIN 0.15 90 P2 TWD 6 FB3
+1.18 TEC TEH 14 HOT 720UL BOBBIN 79 49 0.54 125 P2 TWD 17 FB5
-1.05 TEC TEH 12 HOT 720UL BOBBIN 0.75 119 P2 TWD 21 FB4
+1.05 TEC TEH.
12 HOT 720UL BOBBIN 0.18 94 P2 TWD 7 FB3
+1.12 TEC TEH 12 HOT 720UL BOBBIN 79 51 0.27 99 P2 TWD 10 FB5
-1.04 TEC TEH 12 HOT 720UL BOBBIN 0.43 133 P2 TWD 15 FB4
+1.12 TEC TEH 12 HOT 720UL BOBBIN 0.30 117 P2 TWO 11 FB3
+1.12 TEC TEH 12 HOT 720UL BOBBIN 0.24 100 P2 TWD 9 FB6
-1.25 TEC TEH 12 HOT 720UL BOBBIN 0.13 100 P2 TWD 5 FB7
+1.34 TEC TEH 12 HOT 720UL BOBBIN 79 57 0.57 122 P2 TWD 18 PB5
+1.12 TEC TEN 12 NOT 720UL BOBBIN 0.18 123 P2 TWD 7 FB5
-1.18 TEC TEH 12 HOT 720UL BOBBIN 0.77 109 P2 TWD 22 FB4
-1.14 TEC TEH 12 HOT 720UL BOBBIN 0.25 128 P2 TWD 9 FB3
-1.25 TEC TEH 12 HOT 720UL BOBBIN 79 59 0.21 113 P2 TWD 8 FB6
+1.23 0.13 130 P2 TWD 5 FB6
-1.18 0.54 113 P2 TWD 17 FB5
+1.10 0.80 128 P2 TWD 22 FB4
-1.12 0.27 107 P2 TWD 10 FB3
-1.27 TEC TEN TEC TEH TEC TEH TEC TEH TEC TEH 12 NOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 12 HOT 720UL BOBBIN 10 HOT 720UL BOBBIN 79 61 0.16 107 P2 TWD 6 FB4
-1.20 TEC TEH 79 67 0.16 84 P2 TWD 6 FB6
+1.12 TEC TEH 0.65 110 P2 TWD 19 FB5
-1.05 TEC TEH 0.48 115 P2 TWD 15 FB4
+1.14 TEC TEH 0.14 134 P2 TWD 6 FB4
-1.03 TEC TEH 0.22 146 P2 TWD 8 FB3
+1.23 TEC TEH 0.11 107 P2 TWD 4 FB2
+1.34 TEC TEH 79 71 0.39 123 P2 TWD 14 FB5
-1.08 TEC TEH 0.16 122 P2 TWD 7 FB3
-1.22 TEC TEH 80 44 0.18 85 P2 TWD 7 FB5
+1.10 TEC TEH 0.19 116 P2 TWD 7 FB4
-1.13 TEC TEH 0.13 73 P2 TWD 5 FB3
-1.26 TEC TEH 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 10 HOT 11 HOT 11 HOT 15 NOT 15 HOT 15 NOT 720UL 720UL 720UL 720UL 720UL 720UL BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 720UL BOBBIN 80 46 0.16 112 P2 TWD 6 FB6
+1.13 T
0.13 73 P2 TWD 5 FB5
+1.13 T
0.21 81 P2 TWD 8 FB4
-1.13 T
0.18 143 P2 TWD 7 FB3
-1i15 80 48 0.25 131 P2 TWD 9 FB6
-1.15 T
0.40 104 P2 TWD 14 FB5
+1.10 T
0.35 127 P2 TWD 12 FB4
-1.06 T
0.19 89 P2 TWD 8 FB3
-1.17 T
-EC TEN
'EC TEH
'EC TEH
'EC TEH
'EC
'EC
'EC
'EC TEH TEH TEH TEH 15 HOT 720UL BOBBIN 15 HOT 720UL BOBBIN 15 HOT 720UL BOBBIN 15 HOT 720UL BOBBIN 15 NOT 720UL BOBBIN 15 HOT 720UL BOBBIN 15 HOT 720UL BOBBIN 15 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 NOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 80 50 0.16 63 P2 TWD 7 FB3 0.17 133 P2 TWD 7 FB6 0.59 122 P2 TWD 19 FB5 0.76 133 P2 TWD 23 FB4 80 52 0.13 103 P2 TWD 6 FB6 0.20 142 P2 TWD 8 FB5 0.26 82 P2 TWD 11 FB4
-1.20 TEC TEN
+1.20 TEC TEH
+1.18 TEC TEH
-1.09 TEC TEH
+1.26 TEC TEH
+1.12 TEC TEH
-1.06 TEC TEH
AREVA NP Inc Customer Name:
DC COOK Unit 1 04/15/13 12:41:53 Component: S/G 14 Page 19 of 20 Component: S/G 14 Page 19 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION 0.26 140 P2 TWD 10 FB3
-1.29 0.09 120 P2 TWD 4 FB6
-1.19 EXT TEC TEC EXT UTIL 1
UTIL 2
CAL # LEG TEN 13 NOT TEH 13 HOT PROBE SCOPE 720UL BOBBIN 720UL BOBBIN 80 58 0.30 124 P2 TWD 12 FB6
+1.26 TEC TEH 0.11 87 P2 TWD 5 FB6
-1.24 TEC TEH 1.01 126 P2 TWD 27 FB5
+1.14 TEC TEH 0.23 138 P2 TWD 10 FB5
-1.08 TEC TEH 0.49 121 P2 TWD 17 FB4
+1.03 TEC TEH 0.99 118 P2 TWD 26 FB4
-1.10 TEC TEH 0.31 128 P2 TWD 12 FB3
+1.21 TEC TEH 0.17 138 P2 TWD 7 FB3
-1.28 TEC TEH 81 49 0.16 127 P2 TWD 7 FB7
+1.36 TEC TEH 0.32 134 P2 TWD 12 FB6
-1.24 TEC TEH 0.69 122 P2 TWD 21 FB5
-1.03 TEC TEH 0.66 119 P2 TWD 21 FB4
+1.10 TEC TEH 0.19 108 P2 TWD 8 FB4
-1.15 TEC TEH 0.33 135 P2 TWD 13 FB3
+1.08 TEC TEH 0.13 69 P2 TWD 6 FB2
+1.31 TEC TEH 81 51 0.11 98 P2 TWD 5 FB6
-1.24 TEC TEH 0.23 135 P2 TWD 9 FB5
-1.10 TEC TEH 0.46 117 P2 TWD 16 FB4
+1.08 TEC TEH 0.11 143 P2 TWD 5 FB3
+1.05 TEC TEH 81 53 0.09 137 P2 TWD 4 FB5
+1.12 TEC TEH 81 55 0.45 112 P2 TWD 12 FB6
-1.21 TEC TEH 0.19 89 P2 TWD 6 FB5
+1.17 TEC TEH 0.41 77 P2 TWD 11 FB4
+1.15 TEC TEH 0.17 123 P2 TWD 5 FB3
+1.15 TEC TEH 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13------NOT-----------------------BOBBIN---------
13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 NOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 22------NOT-----------------------BOBBIN---------
22 HOT 720UL BOBBIN 22 NOT 720UL BOBBIN 22 HOT 720UL BOBBIN 22 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 NOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 13 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 23 HOT 720UL BOBBIN 81 59 0.55 0.25 0.29 0.16 0.45 0.12 0.41 0.11 131 P2 TWD 18 FB6
+1.14 137 P2 TWD 10 FB5
+1.12 126 P2 TWD 11 FB5
-1.19 91 P2 TWD 7 FB4
+1.30 127 P2 TWD 16 FB4
-1.19 41 P2 TWD 5 FB3
+1.21 131 P2 TWD 15 FB3
-1.33 80 P2 TWD 5 FB2
-1.30 TEC TEN TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEH TEC TEN TEC TEH TEC TEH TEC TEN TEC TEH 81 65 0.12 47 P2 TWD 5 FB5
+1.16 0.25 110 P2 TWD 9 FB4
-1.14 82 54 0.30 88 P2 TWD 10 FB6
+0.00 0.33 109 P2 TWD 11 FB5
+0.00 0.52 102 P2 TWD 15 FB4
+0.00 0.14 40 P2 TWOD 5 PF3
+0.00 82 56 0.15 150 P2 TWD 6 FB6
-1.16 TEC TEH 12 HOT 720UL BOBBIN 0.18 120 P2 TWD 7 FB5
+1.10 TEC TEH 12 HOT 720UL BOBBIN 0.44 110 P2 TWD 15 FB4
+1.14 TEC TEH 12 HOT 720UL BOBBIN 0.12 60 P2 TWD 5 FB3
+1.18 TEC TEH 12 HOT 720UL BOBBIN 0.10 129 P2 TWD 4 03H
+0.48 TEC TEH LAR 12 HOT 720UL BOBBIN 82 58 0.22 104 P2 TWD 8 FB4
+1.10 TEC TEH 12 HOT 720UL BOBBIN Total Tubes
- 307
AREVA NP Inc Customer Name: DC COOK Unit 1 04/15/13 12:41:53 Component: S/G 14 Page 20 of 20 QUERY: QueryMl ROW COL VOLTS DEG CHN IND %TW LOCATION Total Records: 812 EXT EXT UTIL 1
UTIL 2
CAL # LEG PROBE SCOPE