AEP-NRC-2010-60, Organization Changes in the Nuclear Generation Group

From kanterella
Jump to navigation Jump to search
Organization Changes in the Nuclear Generation Group
ML101820290
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/22/2010
From: Scarpello M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2010-60
Download: ML101820290 (1)


Text

£]I@*I7(* Indiana Michigan Power One Cook Place Bridgman, MI 49106 A unit ofAmerican Electric Power IndianaMichiganPower.com June 22, 2010 AEP-NRC-2010-60 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 1 and Unit 2 ORGANIZATION CHANGES IN THE NUCLEAR GENERATION GROUP The purpose of this letter is to inform you that Mr. Raymond A. Hruby, Jr., Vice President - Site Support Services of the Donald C. Cook Nuclear Plant, has left American Electric Power.

Mr. Michael H. Carlson, previously Engineering Director, has assumed the duties of Vice President - Site Support Services. Mr. Randy F. Ebright, previously Director, Training and Performance Improvement, has assumed the duties of Engineering Director. These changes were effective June 19, 2010.

All future, correspondence for the Vice President - Site Support Services should be directed to Mr. Carlson,.

In addition, Mr. James M. Petro, Jr., previously Senior Legal Counsel and Regulatory Affairs Manager, has returned to his Senior Legal Counsel duties on a full time basis, and I have assumed the duties of Regulatory Affairs Manager, effective June 1, 2010.

This letter contains no new or revised commitments. Should you have any questions, please contact me at (269) 466-2649.

Sincerely, Michael K. Scarpello Regulatory Affairs Manager JEN/jmr c:* J.T. King- MPSC S. M. Krawec, AEP Ft. Wayne MDNRE - WHMD/RPS NRC Resident Inspector....

M. A. Satorius, NRC Region III P. S. Tam, NRC Washington, DC