AECM-87-0061, Monthly Operating Rept for Feb 1987
| ML20207R661 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/28/1987 |
| From: | Hobbs S, Kingsley O SYSTEM ENERGY RESOURCES, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| AECM-87-0061, AECM-87-61, NUDOCS 8703180001 | |
| Download: ML20207R661 (4) | |
Text
m.
.n Attachment,to-AECM-87/0061' DOCKET NO.
50-416 DATE 03/03/87 COMPLETED BY S. H.-Hobbs TELEPHONE (601) 969-2458 OPERATING STATUS
- 1. ' Unit Name: GGNS UNIT 1 l Notes:
l
- 2.. Reporting Period: February 1987 l
l 3..
Licensed Thermal Power (MWt): 3833 MWt l'
l 4.'. Nameplate Rating (Gross MWe): 1372.5 MWe l
l 5; Design Electrical Rating (Net MWe): 1250 MWe l
l 6.
Maximum Dependable Capacity (Gross MWe): 1157 MWe
'l l
- 7. ' Maximum. Dependable Capacity (Net MWe): 1108 MWe l
l 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last
. Report. Give. Reasons:
N/A 9.- ' Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr to Date Cumulative
.11. Hours In Reporting Period 672 1416 20,674
- 12. Number of Hours Reactor Was Critical 672 1281.7 13,630.5
- 13. Reactor Reserve Shutdown Hours 0
0 0
4 1. Hours Generator On-Line 672 1230.9 12,308.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,270,805 4,027,803 34,638,913
- 17. Gross Electrical Energy Generated (MWH) 749,790 1,317,720 10,423,640
- 18. Net Electrical Energy Generated (MWH) 718,148 1,260,105 9,833,871 19.- Unit Service Factor 100.0 86.9 63.4
- 20. Unit Availability Factor.
100.0 86.9 63.4
- 21. Unit Capacity Factor (Using MDC Net) 96.5 80.3 49.6
- 22. Unit Capacity Factor (Using DER Net) 85.5 71.2 43.9
- 23. Unit Forced Outage Rate 0.0 0.0 9.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 J19AECM87031001 - 3 8703180001 870228 PDR ADOCK 05000416,.
PDR 7
R
I'
.)
~
Attachment to AECM-87/0061 DOCKET NO. 50-416 UNIT 1
DATE 03/03/87 COMPLETED BY S. H. Hobbs TELEPHONE (601)969-2458 HONTH_
February 1987 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net)
(MWe-Net) 1 779 17 1236 2
974 18 1240 3
1127-19 1237 4
1202 20 983 5
1199 21 873 6
1210 22 891
~7 1203 23 893 8
1204 24 891 9
1225 25 891 10 1226 26 885 11-1216 27 881 12 1209 28 876
-13 1213 29 14 1127 30 15 957 31 16 1074 J19AECM87031001 - 4
Attechment ta'
'AECM-87/0031f UNIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKET NO. 50-416 UNIT NAME 1
DATE 03/03/87-COMPLETED BY S. H. Hobbs TELEPHONE (601) %9-2458 REPORT' MONTH February 1987 I
I I
I I
I I
I i
1.
I I
I I
I I
I Method of I. Licensee i I
I Cause & Corrective I
I No. I Date i Type IDurationi Reason IShutting Down! Event I System IComponent I Action To 1
I I
I (1) i Hours I (2) 1 Reactor i Report #
l.
Code 1. Code i.
Prevent Recurrence
'l 1
I I
I I
I (3)
I I
(4) I (5) 1 1
1 I
I I
I I
I I
I I
I I
I I
I i
1 1
1 I
I i
187-3 101/31/871 S I
0.0 i
B I
4 l
NA I ZZ l ZZZZZ I Planned power reduction for 1
I I
I I
I I
I I
I I reactor thermal hydraulic I
I I
I I
I I
I I
I I stability test. Power reduction i I
I I
I I
I I
I I
I was extended due to reduced i
I I
I I
i 1
1 1.
I I system load demand.
I I
I I
I I
I I
I I
I l'
187-4 102/14/871 S I 0.0 I
F I
5 i
NA I ZZ l ZZZZZ I Planned power reduction due to 1
I I
I I
I I
I I
I I reduced system load demand.
I 1
1 I
I I
I I
I I
I i
187-5 102/20/871 S I
0.0 i
F I
5 i
NA' I ZZ l ZZZZZ l Planned power reduction for rod i
I I
I I
I I
I I
I I pattern changes and reduced systemt l
I I
I I
l l
I I
I load demand.
I-1 I
I I
I I
I I
I I--
1 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry' Sheets for Licensee B-Haintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREC-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing Examination F-Administrative 5
C-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain)
- In accordance with NUREC 1022 J19AECM87031001
-5
F I
REEDtA9CEE,INC.
Ouw9 D. KtGSLEY.JR EESTecns March 13, 1987 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Document Control Desk Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report AECM-87/0061 In accordance with the requirement of Technical Specification 6.9.1.10, System Energy Resources, Inc. (SERI) is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for February 1987 (attachment).
If you have any questions or require additional information, please contact this office.
Yours truly, ODK:baa TOR Attachment Ot>Q jfb cc: Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 e o ecur.c l mscu vassm wasr72 l am)emm g68y J19AECM87031001 - I wme um,aes ca,rxn dI
.-