- 9 c
t e
General Offices
- Seiden Street, Berkn, Connecticut m e w e isac* c'* "
P.O BOX 270 v i.e. n. c "
l U E[U.7."'c%
H ARTFORo. CONNECTICUT 06141-0270 k
L (203) 665-5000 March 13, 1990 Docket No. 50-423 A08501 Re:
E0P Inspection U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 2055E Gentlemen:
Millstone Nuclear Power Station, Unit No. 3 Insoection of Emeraency Operatina Procedures in a January 19, 1990, letter,(I) the NRC Staff notified Northeast Nuclear Energy Company (NNECO) of an upcoming inspection of Emergency Operating Procedures (EOPs) at Millstone Unit No. 3 and requested copies of certain documents relevant to E0Ps.
The purpose of this letter is to forward the requested information, which is being sent - directly to Mr. P. Bissett, the Inspection Team Leader.
Information provided herein includes:
1.
Complete procedure index 2.
Emergency Operating Procedures 3.
Abnormal Operating Procedures (A0Ps) 4.
Owners' Group Emergency Response Guidelines (ERG) (revision used for the current E0Ps) 5.
Procedure Generation Package, including:
a.
Plant Specific Technical Guidelines b.
Writer's Guide c.
Verification and Validation Program 6.
Deviation document explaining differences between the Owners' Group ERGS and the plant-specific E0Ps (1)
R. M. Gallo letter to E. J. Mroczka,
" Inspection of the Emergency Operating Procedures," dated January 19, 1990.
9003210019 900313 PLR ADOCK 05000423 A
Q PDC ob osu 2 nty 4 es tQ
4
'd l
1 e.
i i
U.S. Nuclear Regulatory Commission i
A08501/Page 2 March 13, 1990 7.
Simulator Malfunction Book 8.
Lesson plans and simulator scenarios used in the simulator for training on E0Ps:
a.
All E0P Lesson Plans -
b.
E0P/A0P Module Index and Critical Task c.
Twenty E0P Modules (sample) d.
Full Scope Scenarios Index e.
Ten Tull Scope Scenarios (sample)
It should be noted that Items e anri a above are not a complete compila-tion of our E0P modules and Full Scope Scenarios, but are a representa-tive sample of what is available.
Mr. Poul Bissett,. Lead Inspector for the NRC, has been made aware of what materials are available at the site should further review be necessary.
We trust this submittal provides sufficient information for the upcoming l
inspection.
Please feel free to contact my staff with any further questions.
[
l Very truly yours, 1
NORTHEAST NUCLEAR ENERGY COMPANY l
FOR:
E. J. Mroczka-Senior Vice President BY:
M C. F. Sears Vice President Enclosures cc:
W. T. Russell, Region I Administrator D. H. Jaffe, NRC Project Manager, Millstone Unit No. 3 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,-2, and 3 F. Bissett, Inspection Team Leader (With Enclosures) 4 v