OPERATING DATA REPORT DOCKET NO. 50-368 DATE 1/19/RA COMPLETED BY t _ c - Bramlett TELEPHONE 501-964-1145 OPERATING STAT US Notes

1. Unit Name:

Arknnans Nuclear One - Unit 2

2. Reporting Period: March 1-31, 1984
3. Licenwd Thermal Power IMWI):

?R15

4. Nameplate Rating (Gross NWel:

942.57

5. Design Electrical Rating tNet MWel:

912

6. Masimum Dependable Capacity (Gross MWe):

897

7. Masimum Dependable Capacity (Net MWel:

ASA

8. If ChangeiOccur in Capac!!y Ratings titems Number 3 Through 7) Since Last Report.Gise Reasons:
9. Power Lesel To Which Restricted. lf Any (Net Mhe):

NnNF

10. Reasons For Restrictions. If Any:

This Month Yr to Date Cumulatise

11. Hours In Reporting Period 744.0 2.184.0 35,208.0
12. Number Of flours Reactor has Critical 687.6 1.911.s on iu a
13. Reactor Rewrve Shutdown Hours 0.0 0.0 i'430.1
14. Hours Generator On Line 683.2 1,372.0 22.322.3
15. Unit Resene Shutdown llours 0.0 0.0 75.0
16. Gross Thermal Energy Generated IMhH) 1,834,894.0 3,013,831.0 55.563.371.0
17. Gross Electrical Energy Generated (MWill 617 9An n 998.740.0 18.015.691.0
18. Net Electrical Energy Generated (MhHl 589.599.0

_.917.045.0 17.153.385.0

19. Unit Senice Factor 91.8 62.8 63.4
20. Unit Asailability Factor 91.8 62.8 63.6
21. Unit Capacity Factor iUsing MDC Net) 92.4 50.5 56.8
22. Unit Capacity Factor (Using DER Neti R6_o 47.5 sq a
23. Unit Forced Outage Rate 8.2 4.2 19.6
24. Shutdowns Scheduled Oser Nest 6 Months t Type. Date.and Duration of Eacht:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in rest Status iPrior eo Commercial Operation 1:

Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICI FY COMMERCIAL OPER A TlON

.rE4Y 8405020295 840331 PDR ADOCK 05000 goj77{

R

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

sn_1An UNIT Two DATE 3/15/84 COMPLETED BY L.S. Bramlett TELEPHONE.snt-06a-114s MONTil March 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) g y we.3,g, I

A9A 17 902 2

894 18 903 3

872 19 901 4

J 20 R90 5

on?

21 877 6

902 22 877 7

868 886 23 8

7_4,1 24 RR6 9

817 25 886 10 98 883 26 Il 27 RRA-35 I3 28 885 13 646 29 887 14 091 30 888 15 894 3;

ggg 16 902 INSTRUCTIONS On this format list the average daily unit power lesel in Mwe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77 )

l l

l

4 1

NRC MONTHLY OPERATING REPORT 1

OPERATING

SUMMARY

MARCH 1984 UNIT 2 i

The unit began the month at 100% full power. Power was reduced for MTC testing on March 2 and lasted through March 4.

On March 7 power was reduced to 65% for con-denser tube leakage and repair. Power was returned to 90% before the unit was shut down on March 10 for maintenance needed on RCS RTDs. The unit was returned to 100%

full power on March 14.

From March 20 to the end of the month unit power was q

restricted to approximately 98% due to CPC limits.

I i

I i

I I

1

+

i i

t 4

4 s

e--e

<y-

-,-,e, p.

v

-y---


e---

-e

,---n,-

-n-

1 O

DOCKETNO. 50-368 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME ANO-2 DATE Anr41 1s loRA COMPLETED BY TI S - Ernminer REPORT MONTH March, 1984 TELEPHONE sn1_o AA _q p s m

-5"1, c

r.

E r.n z

=

Cause & Correctne 7sX Licensee g-r, t

.2 _e

=

1 No.

Date g

3g g

,g g 5 Event

?7 D

Action to

$3 5

j5y Report :

cE 0 U

Prevent Recurrence 2

84-01 840310 F

60.5 A

3 IM TE Shutdown to repair an RCS RTD 84-02 840312 F

.3 A

9 N/A IT ZI Turbine / generator load limiting indication failure l

i-I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equiprnent Failure (Explain)

I-Manual for Preparation of Data B-Maintcnance of Test 2-Manual Scram.

Entry Sheets for bcensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regularory Restriction 440ntinuation 01611 Ebrato'r Training & Ucense Examination 5-Load Reduction 5

F Administrative 9-Other G-Operational Error (Explain)

Exhibit ! Same Source 19/77 )

!!-Other (Explain)

REFUELING INFORMATION 1.

Name of facility.

Arkansas Nuclear One - Unit 2 2.

Scheduled date for next refueling shutdown. June 1985 3.

Scheduled date for restart following refueling.

August 1985 4.

Will refueling or resumption of operation thereafter require a i

technical specification change or other license amendment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine i

whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

Yes, some proposed software changes to the Core Protection Calculators are being considered.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

March 1985 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Burnable poison rods may be used in reload fuel.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 168 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present 988 increase size by 0

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE: 2003

ts ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK, ARKANSAS 72203 (501) 371-4000 April 15, 1584 2CAN948402 Mr. Harold S. Bassett, Director Division of Data Automation and Management Information Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report (File:

2-0520.1)

Gentlemen:

Attached is the NRC Monthly Operating Report for March 1984 for Arkansas Nuclear One - Unit 2.

Very truly yours,

}hnR. Marshall &2dA Manager, Licensing JRM:SAB:na Attachment - See hard copy for complete attachment cc: Mr. John T. Collins Regional Administrator V. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.