Monthly Operating Rept for Nov 1991 for Arkansas Nuclear One Unit 2
ML20091H016
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/30/1991
From: James Fisicaro, Whitt M
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2CAN129108, NUDOCS 9112190340
Download: ML20091H016 (7)


Text

8

- ~. - - -

. - - ~ - - -. - - - - - -.... -

b fjy 'l Y l'

.,:~. Ente @

= = ona" =.ia-a.m n-um Operat ons a u~ ".nm 4 m la :9 w.4

y. '

. December 16.-1991 2CAN129108-U. S. Nelear Regulatory Conrnission Document Control Desk-1

~

Mail Stop P3-137 Washington. D.C.

20555 l

1 SU BJECT s. Arkansas Nuclear One - Unit 2

?

Docket No. 50-368

= License.No. NPF-6

. Monthly Operating Report Gentlement The Arkansas Nuclear One - Unit 2 = Monthly Operating-Report (MOR) for November, 1991-1s attached.

This report is submitted in accordance with /sNO-2 Technical Specification 6.9.1.6.

-t Very truly yours, -

hw:.

/

t % -.

~

Director, Licensing

. Fisicaro J ame s --

JJF/SAB/ sj f '

~. Attachment..

.+

t i.

y OOOOO"

-9112190340 911130 y

.. p DR.ADOCK 05000368 l

lly

, R:

<PDR e

l i

..4,.

...... ~....

-m.

i.

U. S. NRC December 16, 1991 0

,Pags. 2 ct.

Mr. Rcbert D. Hartin Regional Administrator U. S. Nuclear Regulatory Cornmission Regior IV 611 Ryan Plaza Drivn, Suite 1000 Arlington, TX 76011 NEC Senior Resident inspector Arkansas Nuclear Ono - ANO-1 E 2 Number 1, Nuc1 car Plant Rond Russellville, AR 72801 Hr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-1 U. S. Nuclear Regulatory Commisston NRR Mail Stop 11-D-23 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Ms. Sheri Peterson NRR l'roject Manager, Region IV/ANO-2 U. S. Nuclear Rnt,ulatory Commission NER Hall Stop 11-D-23 One Whitn Flint North 11555 Rockville Pike, Rockvillo, Maryland 20852 J

_-___.______________._______m______.

m.._. _. _. _. _... -

x*-

u-.

OPERATING DATA REPORT DOCKET NO:

50-368 DATE:

November 1991 COMPLETED BY:H. S. Whitt TELEPil0NE:

1101)_964-5560 QPERATING. ST4EG

- 1.

Unit Name:

Arkansas Nuclear _One_- Unit 2 2.

Reporting Period Noyomber_ 1-30,_199_1 3.

Licensed Thermal Power (HWt):

h815

-4.

Nameplate Entirg (Gross HWe): 942.57 S.

Design Electrical Rating (Not HWo):

9J2 l

6..

Maximum Dependabic Capacity (Gross MWe):

897

~7.

Maximum Dependable Capacity (Net HWe):

858

-8.

If Changes.0ccur in Capacity Ratings (Itoes Number 3 Through 7) Sinco i

j Latit Report, Give Reasons 9.-

Power Lovel To Which Rostricted.

li Any (Net !!Wo): None i

1f Any: None

. j 10.

Reasons For Nostrtetions. :

HONTil YR-TO-DATE CUHULATIVE j

11.

Ilours:In Neporting Period....

770.0 8,016.0 102,408.0 12.

Number of Ilours Reactor wcn

~

Critical...................

720.0 6,597.1 77,207,8

' 1' Reactor Reserve Shutdown llours................'........

0.0-0.0 1,430.1 14.

Ilours Generator On-1.ine......

720.0 6,444.6 75,438.6 15.

Unit Reuerve Shutdown llours..

0.0 0.0 75.0 16.

Gross Thermol Energy Generated L(HWH).............'...........

1,973,641.0 17,368,316.0 198,187,157.0 17.

Gross Electrical Knorgy Generated (HWil)...............

655,500.0 5,734,600.0 65,163,846.0 Not Electrical Energy

18..

G ene ra ted (MWil)..............

626-330.0 5,462,392.0 61,968,')30.0 t

19.-

Unit Service Factor..........

100.0~

80.4 73.7 l

20..

Unit Availability Factor.....

100.0 80.4 73.7 y

21.

~ Unit Cnpselty Facter-(Using MDC Not)=..............

101.4 79.4 70.5 22.

Unit Capacity Factor (Using DEC Net)-..............

95.4 74.7 66.4

~ 23.,

Unit Forced _. Outage Rate......

0.0 2.9

. 11.9 24.

Shutdowns Scheduled over Next 6 Nonths (Type, Date, and-Duration of Each):

None 125.- 'If Shut.Down At End of_ Report Period.

Estimated Data of Startup:"

26.

Units in Test Status (Prior to Commercial Operation):

_6 Forecast Achieved 1NITIAL-CRITICALITY J.2/0J/J8 INITIAL ELECTRICITY

,1jy26/l8

~ COMMERCIAL OPERATION Op/ 76/ 80 t

< +

e s

e

~+,N.s a.

-e,i -

n e --,,,,

-,a u

Mn n.m..,

_ms.,...,w,--

e

~e,e

-,w

, -, - - < s.

m m

\\

s AVERAGE DAII.Y UNIT POWER I.EVEI, DOCKET tio:

50-368 t

UNIT:

Two DATE:

Novembe_r, 1991 COMPIETED !!Y: H. S. Whitt TE!IPil0NS:

D0Q_964-5560 i

f MONTil November'1991 DAY AVERAGE JAII.Y POWER 1.EVEt, (HWo-Not)

-1...............

846 2

6.............

891 3..............

893 4..............

894 5~..............

893 i

6..............

893 7..............

894 8..............

896 9-..............

996' 10......

846 11.............

896 12.............

893 13.............

8 /<<

14............. ~ 891-L 15.............- 887 76.............

887 11:............ -888 18.............

883 19 885 20.............

890 21.............

890 22........

891 23.............

893 L

24'.............

893 25.....=.......

893 26.............

692 27......

802 28.............

697 29............. -594 30.............

704 AVGS:

870 1EEIEUET10N On this format, list the averago daily unit power invol in MWo-Net for each

-day-in reporting month. Computn to the nearest whole megawatt.

m.+.

-,. ~,,...

--.,2.~..

,.,,,..m

.,,s,,

..i.,

.,'.Y..

... ~.

. ~

- - -.. ~. ~ - ~. - - -.

~$'

x 4 v.

l P

NRC HONiill.Y OPF.WATING REPORT OPERATING SUHHARY NOVEMBER 1991 UNIT TWO i

The unit began the month operating at 1007, full power.

.-At'0938 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.56909e-4 months <br /> on the first, a power reduction was commenced due to a foodpump turbino trip. The trip wac;the result of a power supply failure for the transmitter monitoring Inw feedpumt suction prennuro.

Mtar the i

power supply was replaced, thn unit was s:eturnod to 1001 power at 1827 hours0.0211 days <br />0.508 hours <br />0.00302 weeks <br />6.951735e-4 months <br /> on thn first.

On - the twent'/-seventh,-- at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, 'a power reduction was requestod by the system dispatcher., The unit resolned derated at.the request of the ayatem dispatcher *.hrough ihe end of the month.

g T

T h

i t

1 a

.)

I

_5

..m.

!!l !;'

!i

[;i;j!

li(i! l! ! II

!F!

j [!

li,

' !i!I!!t!J_

r pe i p 8

niw nm r

1 e

e irrornu e.

G pr E

9 v

c aut poap 1

6

.i n

d mt f

s e

R 9

0 t

e e

ea rd r nb U

o 5

cor c a ph eeeu o e.

N t

5 et r u

mTmrt es it e(

w

. T 6

t r

u dou outf s ta s

e i

4 rnc et p rli e

cp nase e

t r h 6

ooe r

.fi mwr us ot nl c

i e W 9 CiR erp rsop di i aei r

B n b t

t ueidf nl ed tDcF u

&ct idt re a

n r

c i

o 6

U a.

)

3 tS

'1 A n n

att yrgo m

ufL)

S O

t 0

e e

urw ll t ni re ro V

0 N

e

. 5 s

v ed eup it et t

rJ e

5A D M (

u e

ewensperc ws snot m

a r

h oeieuh ou oy nof(

a C

P T pf b r s t t s Ps Ii S

.t st Y

- at r B

reo Gaep I

OE DE t

ph e NM EN n

t eSR t

A TO e

i r i

N EH n 'e bPyt) b mTEPI y> d LP X

A i

rn2 i

o J

/

hrt e2 h

cI TMt mC R

N xonv0 x

0NAOr o

= EfEE1 5 E DUDCT C

e r

a n

e 'e A

. r o

t sd J

/

mcni S

yo S

N aSot N

SC r

i c O

cct u I

Siad T

t ue C

ll anR aami r

v e

1 1

e duuotd e w9 s

t onnt nah R9 nt r haauoot 1

eno A

A tMMACLO R'

cep

/

/

e - - - - - -

Tk ive N

N s M1 23459 h E.

LER OB PM.

)

)

E n

n DV i

i a

a NO AN

'r l

l o

p n

p SR t

x o

x NO-f c

E i

E RF oga

( t t& n

(

r ne A

s c

o DT-diR 5

/

ee i gi r

TR.

ot N

rT rnt o

UO ht n u

ti a r)

HP t uw l r snnern SE eh o i o eiivEi R-MSD a

R ami a

T Fe ratll I

c yT x a a p N

t ngr Ernx U

nanor t oE enit oesi(

'n mel at sit pt el annar o

s ninuureire a

A H

ouif gecmeh e

s q a e e pi d pt R_

aEMRROLAOO e-

= RABCDE FGH

.no) i s

.t r

A A

au

/

/

ro N

N uH D(

d e

8 l

e du o

ed r

F S

ce T

rh oc FS 1

7 FS e

0 2

2

.t 1

1 a

1 1

D 1

1 9

9 2'

3 1

1 o

1 1

F 9

9 s{

{!!

l i!i jiI

lji}

4 j

4

,jiL:

!1 !13

4 DATE:

November, 1991 p

NEFUELING INFORMATION

+

1.

Name of facility: Arka.nsan_Ntteltar One UniLi l

Sipitdown_f rom _cyJJe 9 is_

2.

Scheduled dato for next refnoling shutdown.

t targeted for_. August _15&l 99.2.t e

t 3.

' Scheduled dato for testart following refunling. Qcipher 6. 1 E.

l 4.

Will refueling or resumption of operation thereafter require a i

technical speellication chnnge or_other license amendment?

If neawer is yes, what, in genorni, will there bo?

If answer is no, has tho i

reload fuol_ design and corn configuration bean reviewed by vour Plant

-l Safety Roview Committen to determino whether any unaviewed safety questions are associated w.th the coro reload (Rei. 10 CFR Section.

50.59)?

-Unknown._ The Cycle 10 Reload _ is currently _bcIng_ planned.

' 5.

Scheduled.date(s);for submitting proposed licensing action and supporting Information, t.pril 6, 1992 i

1 6.

Important licensing c:onsiderations associated with refucif ng, e.g., new or different fuel deafgn or supplier, unroviewod design or performance analysin methods, significant changes in fusi design, new operating 1

procedures.

Nono l__

)

.)

7. -

The number of fuoi assemblics (n)]in tho' corn and (b)~fn the spent fue1~

- storage pool, a) 122.

b). W 3.

Thri.present-licensed spent funi pool rtornge capacity-nnd the nize of anyLincrease in licensed storago capacity that has been equested or is planned, in number of fuel'assemblica, present 288 increaso size by 9_.

~

i 9,

The projected date of the last refueling that can be discharged to the s,

spent fue1~ pool assuming the p.esent licensed capacity.

DATE: _1226 (Loss of fulicore offload capability)

.{

j 1

n

_u,_

.mm._-,-_

,