OPERATING D ATA REPORT

{

DOCKET NO.

50-368 DATE 11/15/83 COMPLETED BY I.S.Bramlett TELEPHONE 501-964-3145 OPERATING STATUS Arkansas Nuclear One-Unit 2 Notes r

~

21. Unii Name.

October 1-31, 1983

2. Reporting Period,
3. Licensed Thermal Power (MWt):

2815 942.57

4. Nameplate Rating (Gross MWe).

'912

5. Design Electrical Rating (Net MWe):

897

6. Maximum Dependable Capacity (Gross MWe):

858

7. Maximum Dependable Capacity (Net MWe):
8. If Changes'Ocwr in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. P'ower Level To Which Restricted.lf Any (Net MWe):

NONE

10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cumulatne

11. Hours in Reporting Period 745.0 7,296.0 31,560.0,
12. Number Of Hours Reactor Was Critical 0.0 5,470.9 21,627.1 0.0 91.6 1,430.1
13. Reactor Reserve Shutdown Hours U.0 5,381.6 20,950.3
14. Hours Generator On-Line
15. Unit Rewrve Shutdown Hours 0.0 0.0 75.0 0.0 14,298,479.0 52,549,b4U.U
16. Gross Thermal Energy Generated (MWII) 0.0 4,641,647.0 17,016,951.0
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWHI -

0.0 4,427,954.0 16,206,340.0

19. Unit Senice Factor 0.0 -

73.8 bb.4 0.0

/3.8 66.6

20. Unit Availability Factor U.0 70.7 69.8
21. Unit Capacity Factor (U>ing MDC Neti
22. Unit Capacity Factor (Using DER Net) 0.0 66.5 56.3
23. Unit Forced Outage Rate 100.0 19.2 20.4

'4. Shutdown's Scheduled Oser Ne.st 6 Months tType. Date,and Duration of Each):

~

Now in scheduled refueling and maintenance outage; scheduled for October, 1983 L

through January, 1984 25, if Shut.Down At End Of Report Period. Estimated Date of S,tartup:

January, 1984

- 26. Units in Test Status (Prior to Commercial Operatian):

Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY

- COMMERCI AL OPER ATION 9312150073 831031

~

DR ADOCK 05000368 f {}

PDR j, -

(4/771


__.m__________m_-_-

._-..m__..-

.m AVERAGF DAILY UNIT POWER LEVEL DOCKET NO. 50-368 i.

~

UNIT 2

DATE 11/15/83 l S.Bramlett COMPLETED BY f

TELEPff0NE 501-964-3145

l Octo W, N 83

. MONTH t

3-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-N ?t) -

(MWe-Net) j; I

0 0

37 0

0 2

18 0

0 3

o 4

20 O

h 5

0 0

21 0

6 22 0

I 7

23 0 '.

I 0

3 0

24-l~

9 0

o

,5 0

o 1

10 0

o

' 11

'12 0

0 28

~13 0

0 0'

o 14 30 0

is 0

3 0

16 INSTRUCTIONS On this fortnat, list the average daily unit power lesel in MWe-Net for each day in the reputting month. Compute to the nearest whole megawatt.

(9 /77)

-,,na,-_._--____-.-.

w p ;,e,.: ;

y:

??

NRC MONTHLY OPERATING REPORT-OPERATING

SUMMARY

OCTOBER, 1983 UNIT 2-The unit' began the month in Mode 5 in a continuation of the outage which was caused by battery cells-failing to meet Technical Specification limits in September.. On October 5 at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br />,.a Management decision was made to

~begin the 2R3 refueling / maintenance outage. The unit remained in the refueling p:

mnde throughout the rest of the month.

k A

4

'. l

' d <

e-F 4

+

[

ha i nn um i ia m

- i in 1i

DOCKET NO. 50-368 UNIT SHUTDOWNS AND POWER REDUCTIONS

. UNIT NAME ANO-2 DATE Nov. 7.1983 COMPLI:TED BY L. S. Bramlett REPORT MONTH OCTOBER TELEPHONE (501) 964-3145 i

w.

3?

3 h.$

Licensee h

Cause & Corrective g

3g 4

.2 s &

Event y

.y Action to No.

Date c

Preverit Recurrence H

yE 5

gig Report :

in U g

c5 83-09 830926 F

110.7 A

.4 50-368-83-44 EC BATTRY Battery cells failed to meet surveil-

~

lance test requirements.

83-10 831005 S

634.3 C

9 NONE ZZ ZZZZZZ Refueling and usintenance outage.

l l

I 2

3 4

F: Forced Reason:

Method:

Ex'tibit G - Instructions i

S: Scheduled A-Equipment Failure (Explam) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Ev.:nt Report (LER) File (NUREG-0-Regulatory Restriction 4-Continuation 0151)

E-Operator Training & License Examination 5-Load Reduction 5

F Administrative 9-Other l

G-Optrational Error (Explain)

Exhibit I - Same Source (9/77)

Il Other (Explain) i

]

DATE: October,1983 REFUELING INFORMATION 1.

Name of facility.

Arkansas Nuclear One - Unit 2 2.

  • Scheduled date for next refueling shutdown.

October, 1983 3.

Scheduled date for restart following refueling.

January,1984 4.

-Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

-If answer is yes, what, in general, will these be?

TF answer is no, Itas the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

No 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

November,1983

6..

Important licensing _ considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or L

performanet analysis methods, significant changes in fuel design, new operating procedures.

l To be determined p

I 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 112 8.

The present licensed spent fuel pool storage capacity and the size of any increaea in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present 988 increase size by 0

9.

The projected date of the last refueling that can be discharged to the spent fuel pcol assuming the present licensed capacity.

DATE:-2003-- -

O

/'

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK, ARKANSAS 72203 (501) 371-4009 November 15, 1983 2CAN118306 Mr. Harold S. Bassett, Director Division of Data Automation and Management Information Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20556

SUBJECT:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report (File:

2-0520.1)

Gentlemen:

Attached is the NRC Monthly Operating Report for October 1983 for Arkansas Nuclear One - Unit 2.

Very truly

urs, L

l ohn R. Marshall anager, Licensing JRM:SAB:rd Attachment - See hard copy for complete attachment cc:

Mr. John T. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 (J